Job Info for 1290-02-023

County: ROCKWALL Highway: SH 276 Date: 09/07/2022 (2 years ago) Engineer's Estimate: $2,609,160 Control Number: 1290-02-023
Project: F 2023(106) District: DALLAS Time: 68 WORKING DAYS Type: RESURFACE ROADWAY
HCS
Pay Estimates: 1 | 2 | 3
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,609,160.35
TEXAS MATERIALS GROUP, INC.   $2,748,754.00 1
5.35% | $139,593.65
FOUTSCO PAVING COMPANY, LLC   $2,787,452.58 2
6.83% | $178,292.23
1.41% | $38,698.58
AUSTIN BRIDGE & ROAD SERVICES, LP   $2,939,014.84 3
12.64% | $329,854.49
6.92% | $190,260.84
5.44% | $151,562.26
PEACHTREE CONSTRUCTION, LTD.   $3,029,268.18 4
16.1% | $420,107.83
10.21% | $280,514.18
3.07% | $90,253.34

Bid Items

Items: 79, 0 filtered
ROCKWALL SH 276  |  DALLAS  |  1290-02-023  |  09/07/2022  |  $2,609,160  |  F 2023(106)  |  RESURF ROADWAY  |  68 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC. FOUTSCO PAVING COMPANY, LLC AUSTIN BRIDGE & ROAD SERVICES, LP PEACHTREE CONSTRUCTION, LTD.
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 9.000 $25.000 $110.000 $300.000 $100.000 $110.000
134 6004 BACKFILL (TY A OR B) STA 248.470 $155.000 $205.000 $100.000 $218.230 $250.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 10,757.000 $1.100 $1.000 $2.000 $2.100 $0.950
162 6002 BLOCK SODDING SY 10,757.000 $3.750 $4.500 $4.000 $5.690 $4.500
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 3,587.000 $0.400 $0.260 $0.010 $2.060 $0.270
168 6001 VEGETATIVE WATERING MG 2,136.000 $2.000 $0.010 $1.000 $0.110 $20.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 1,600.000 $55.000 $65.000 $75.000 $80.710 $66.500
354 6002 PLAN & TEXT ASPH CONC PAV(0" TO 2") SY 25,509.000 $2.300 $3.000 $1.500 $2.860 $3.100
400 6005 CEM STABIL BKFL CY 9.000 $175.000 $884.000 $250.000 $800.000 $860.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 20.000 $230.000 $242.000 $400.000 $500.000 $535.000
432 6002 RIPRAP (CONC)(5 IN) CY 8.500 $300.000 $663.000 $600.000 $653.150 $640.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 85.000 $350.000 $304.000 $200.000 $301.610 $295.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 175.000 $475.000 $592.000 $600.000 $577.130 $575.000
480 6001 CLEAN EXIST CULVERTS EA 4.000 $2,000.000 $1,600.000 $1,500.000 $1,500.000 $1,650.000
500 6001 MOBILIZATION LS 1.000 $232,464.000 $178,116.000 $100,000.000 $293,901.480 $250,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $9,500.000 $26,000.000 $10,000.000 $25,000.000 $8,750.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 270.000 $55.000 $62.000 $56.000 $112.290 $60.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 270.000 $10.000 $8.850 $8.000 $15.370 $9.500
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 234.000 $20.000 $25.400 $25.000 $38.620 $27.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 234.000 $7.000 $7.620 $7.500 $7.630 $8.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,014.000 $2.750 $2.370 $2.300 $4.450 $2.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,014.000 $0.500 $0.520 $0.500 $0.880 $0.550
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,237.000 $4.300 $4.100 $4.000 $5.650 $4.400
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,237.000 $1.150 $0.780 $0.750 $0.880 $0.850
533 6001 RUMBLE STRIPS (SHOULDER) LF 41,264.000 $0.180 $0.145 $0.140 $0.340 $0.250
533 6002 RUMBLE STRIPS (CENTERLINE) LF 19,331.000 $0.180 $0.145 $0.140 $0.360 $0.260
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 1,895.000 $23.000 $24.000 $22.000 $22.250 $25.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 180.000 $90.000 $103.000 $200.000 $60.000 $102.000
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 1.000 $1,300.000 $1,705.000 $1,500.000 $1,125.000 $1,210.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,975.000 $2.750 $1.750 $5.000 $3.000 $2.300
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 18.000 $3,000.000 $2,800.000 $2,750.000 $2,900.000 $3,250.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 17.000 $250.000 $208.000 $200.000 $300.000 $225.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 91.000 $500.000 $670.000 $615.000 $615.000 $760.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $550.000 $825.000 $750.000 $750.000 $910.000
644 6031 IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) EA 1.000 $750.000 $1,275.000 $1,115.000 $1,115.000 $1,350.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $850.000 $1,230.000 $1,080.000 $1,080.000 $1,300.000
644 6034 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 2.000 $925.000 $1,400.000 $1,230.000 $1,230.000 $1,510.000
644 6036 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 7.000 $800.000 $1,400.000 $1,250.000 $1,250.000 $1,510.000
644 6076 REMOVE SM RD SN SUP&AM EA 104.000 $100.000 $78.000 $20.000 $20.000 $105.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 38.000 $29.000 $25.750 $24.000 $24.000 $44.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 9.000 $130.000 $46.000 $75.000 $100.000 $88.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,255.000 $1.500 $1.050 $0.750 $3.880 $2.500
666 6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 507.000 $5.500 $1.030 $1.000 $1.000 $2.200
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 689.000 $1.200 $1.030 $1.000 $1.000 $1.200
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 132.000 $3.800 $5.200 $4.000 $5.000 $5.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 267.000 $7.000 $8.200 $8.000 $8.000 $8.800
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 6.000 $140.000 $156.000 $150.000 $150.000 $175.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 11.000 $160.000 $207.000 $175.000 $200.000 $210.000
666 6170 REFL PAV MRK TY II (W) 4" (SLD) LF 57,588.000 $0.200 $0.160 $0.170 $0.150 $0.190
666 6178 REFL PAV MRK TY II (W) 8" (SLD) LF 51.000 $0.350 $1.030 $0.420 $1.000 $0.460
666 6182 REFL PAV MRK TY II (W) 24" (SLD) LF 267.000 $3.500 $2.040 $3.000 $2.000 $3.100
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 57,588.000 $0.200 $0.160 $0.170 $0.150 $0.190
666 6224 PAVEMENT SEALER 4" LF 1,100.000 $0.200 $0.260 $0.500 $0.250 $0.150
666 6228 PAVEMENT SEALER 12" LF 132.000 $1.200 $2.060 $1.000 $2.000 $0.950
666 6230 PAVEMENT SEALER 24" LF 27.000 $2.000 $4.080 $2.000 $4.000 $1.750
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 41,678.000 $0.400 $0.480 $0.500 $0.460 $0.550
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 8,597.000 $0.700 $0.730 $0.800 $0.700 $0.780
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 2,900.000 $0.500 $0.580 $0.550 $0.550 $0.550
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 34,142.000 $0.450 $0.480 $0.550 $0.460 $0.550
672 6007 REFL PAV MRKR TY I-C EA 38.000 $4.300 $10.500 $5.000 $10.000 $4.600
672 6009 REFL PAV MRKR TY II-A-A EA 819.000 $4.300 $4.620 $3.750 $4.500 $5.200
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 1,556.000 $0.500 $1.030 $2.000 $1.000 $2.100
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 132.000 $1.750 $3.090 $3.000 $3.000 $2.100
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 15.000 $3.850 $5.200 $4.000 $5.000 $4.200
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 2.000 $65.000 $78.000 $100.000 $75.000 $104.000
677 6012 ELIM EXT PAV MRK & MRKS (WORD) EA 2.000 $115.000 $104.000 $100.000 $100.000 $104.000
678 6001 PAV SURF PREP FOR MRK (4") LF 1,556.000 $0.150 $1.030 $0.500 $1.000 $0.020
678 6006 PAV SURF PREP FOR MRK (12") LF 132.000 $0.600 $0.840 $1.000 $0.800 $0.350
678 6008 PAV SURF PREP FOR MRK (24") LF 15.000 $1.050 $2.060 $1.000 $2.000 $0.680
678 6009 PAV SURF PREP FOR MRK (ARROW) EA 2.000 $20.000 $10.250 $14.000 $10.000 $15.500
678 6016 PAV SURF PREP FOR MRK (WORD) EA 2.000 $20.000 $10.250 $16.000 $15.000 $17.500
730 6107 FULL - WIDTH MOWING CYC 2.000 $5,600.000 $1,550.000 $1,500.000 $3,600.000 $6,300.000
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 800.000 $25.000 $8.852 $10.000 $8.000 $9.000
780 6004 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) LF 8.000 $250.000 $120.000 $125.000 $200.000 $220.000
3077 6023 SP MIXES SP-C SAC-B PG70-22 TON 13,578.000 $110.000 $121.530 $137.500 $114.500 $129.500
3077 6075 TACK COAT GAL 10,642.000 $3.750 $0.010 $0.010 $4.500 $1.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $13,000.000 $2,900.000 $4,600.000 $3,031.000 $7,500.000
6185 6002 TMA (STATIONARY) DAY 68.000 $145.000 $1.000 $1.000 $304.880 $210.000
6185 6005 TMA (MOBILE OPERATION) DAY 25.000 $300.000 $1.000 $1.000 $811.720 $250.000
Totals: $2,609,160.35 $2,748,754.01 $2,787,452.58 $2,939,014.85 $3,029,268.18