County: ROBERTSON Highway: SH0007 Date: 04/02/2019 (5 years ago) Engineer's Estimate: $4,052,024 Control Number: 6342-89-001
Project: RMC - 634289001 District: BRYAN Time: 61 W Type: HMA OVERLAY, RETROFIT BRIDGE RAIL & MBGF

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,052,023.73
KNIFE RIVER CORPORATION - SOUTH   $3,988,300.81 1
-1.57% | -$63,722.92
BIG CREEK CONSTRUCTION, LTD.   $4,187,313.73 2
3.34% | $135,290.00
4.99% | $199,012.92
TEXAS MATERIALS GROUP, INC.   $5,284,706.14 3
30.42% | $1,232,682.41
32.51% | $1,296,405.33
26.21% | $1,097,392.41
ANGEL BROTHERS HOLDINGS CORP.   $5,873,136.13 4
44.94% | $1,821,112.40
47.26% | $1,884,835.32
11.13% | $588,429.99

Bid Items

Items: 42, 0 filtered
ROBERTSON SH0007  |  BRYAN  |  6342-89-001  |  04/02/2019  |  $4,052,024  |  RMC - 634289001  |  HMA OVERLAY, RETROFIT BRIDGE RAIL & MBGF  |  61 W
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH BIG CREEK CONSTRUCTION, LTD. TEXAS MATERIALS GROUP, INC. ANGEL BROTHERS HOLDINGS CORP.
105 6023 REMOVING STAB BASE AND ASPH PAV (5") SY 12,368.000 $3.500 $5.600 $5.000 $3.300 $8.000
132 6017 EMBANKMENT (VEHICLE)(ORD COMP)(TY A) CY 130.000 $25.000 $49.100 $40.000 $26.000 $120.000
134 6004 BACKFILL (TY A OR B) STA 332.000 $150.000 $40.250 $125.000 $190.000 $150.000
310 6008 PRIME COAT (EC-30) GAL 3,711.000 $4.000 $3.650 $4.000 $4.350 $3.000
316 6405 ASPH (AC-20-5TR OR AC-20XP) GAL 62,746.000 $2.800 $3.750 $3.250 $3.850 $4.000
316 6434 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 1,288.000 $130.000 $106.200 $115.000 $122.000 $135.000
344 6031 SUPERPAVE MIXTURES SP-C SAC-A PG64-22 TON 26,498.000 $64.000 $71.200 $77.000 $104.000 $120.000
344 6167 SUPERPAVE MIXTURES SP-B SAC-B PG64-22 TON 3,402.000 $75.000 $67.500 $75.000 $120.000 $135.000
354 6022 PLANE ASPH CONC PAV(0" TO 3") SY 160,885.000 $2.000 $2.650 $2.000 $2.400 $2.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 477.000 $400.000 $395.000 $475.000 $605.000 $680.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 168.000 $60.000 $56.850 $75.000 $60.200 $50.000
451 6004 RETROFIT RAIL (TY T131RC) LF 390.000 $170.000 $257.350 $250.000 $142.000 $250.000
500 6001 MOBILIZATION LS 1.000 $367,449.430 $103,525.000 $200,000.000 $253,675.000 $300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $6,000.000 $17,350.000 $7,500.000 $975.000 $2,700.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 9,675.000 $3.500 $1.500 $2.000 $1.400 $2.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 9,675.000 $1.500 $0.100 $0.250 $0.600 $0.500
530 6002 INTERSECTIONS (ACP) SY 2,131.000 $30.000 $15.100 $17.000 $24.000 $34.000
530 6005 DRIVEWAYS (ACP) SY 498.000 $40.000 $33.600 $17.000 $24.000 $41.000
530 6006 DRIVEWAYS (SURF TREAT) SY 352.000 $35.000 $23.500 $17.000 $33.000 $38.000
530 6016 DRIVEWAYS (BASE) SY 1,093.000 $60.000 $9.350 $15.000 $10.000 $17.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 65,095.000 $0.200 $0.140 $0.180 $0.270 $0.190
533 6002 RUMBLE STRIPS (CENTERLINE) LF 32,734.000 $0.200 $0.180 $0.300 $0.290 $0.260
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 7,075.000 $20.000 $20.250 $20.000 $19.600 $21.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,800.000 $1,685.000 $2,000.000 $1,325.000 $1,400.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 22.000 $1,100.000 $1,240.000 $1,200.000 $995.000 $720.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 6,525.000 $3.000 $3.150 $3.000 $3.000 $2.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 35.000 $240.000 $368.000 $350.000 $110.000 $180.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 26.000 $2,200.000 $2,870.000 $2,800.000 $2,625.000 $2,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 17.000 $240.000 $370.000 $400.000 $225.000 $270.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 379.000 $20.000 $25.260 $25.000 $21.000 $40.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 66,623.000 $0.200 $0.120 $0.110 $0.110 $0.110
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 7,590.000 $0.120 $0.200 $0.190 $0.190 $0.200
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 22,030.000 $0.180 $0.190 $0.180 $0.180 $0.190
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 848.000 $1.000 $1.000 $1.000 $1.250 $1.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 555.000 $6.000 $7.050 $7.000 $6.700 $7.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 66,623.000 $0.300 $0.370 $0.350 $0.350 $0.370
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 7,590.000 $0.500 $0.390 $0.370 $0.370 $0.390
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 22,030.000 $0.300 $0.380 $0.360 $0.360 $0.380
672 6009 REFL PAV MRKR TY II-A-A EA 848.000 $2.000 $5.260 $5.000 $5.000 $5.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $9,000.000 $2,500.000 $4,000.000 $19,800.000 $5,000.000
6185 6001 TMA (STATIONARY) EA 3.000 $12,000.000 $25.000 $5,000.000 $21,600.000 $7,500.000
6185 6003 TMA (MOBILE OPERATION) HR 760.000 $65.000 $45.000 $50.000 $25.500 $35.000
Totals: $4,052,023.73 $3,988,300.81 $4,187,313.73 $5,284,706.14 $5,873,136.13