Job Info for 0205-02-067

County: ROBERTSON Highway: US 79 Date: 11/03/2021 (3 years ago) Engineer's Estimate: $875,815 Control Number: 0205-02-067
Project: F 2022(117) District: BRYAN Time: 31 WORKING DAYS Type: INTERSECTION IMPROVEMENTS WITH LEFT TURN LN
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $875,815.30
KNIFE RIVER CORPORATION - SOUTH   $734,212.86 1
-16.17% | -$141,602.44
BIG CREEK CONSTRUCTION, LTD.   $823,508.32 2
-5.97% | -$52,306.98
12.16% | $89,295.46
LARRY YOUNG PAVING, INC.   $874,999.99 3
-0.09% | -$815.31
19.18% | $140,787.13
6.25% | $51,491.67
TEXAS MATERIALS GROUP, INC.   $895,793.29 4
2.28% | $19,977.99
22.01% | $161,580.43
2.38% | $20,793.30
A. L. HELMCAMP, INC.   $939,962.62 5
7.32% | $64,147.32
28.02% | $205,749.76
4.93% | $44,169.33
TEXCON GENERAL CONTRACTORS   $983,879.97 6
12.34% | $108,064.67
34% | $249,667.11
4.67% | $43,917.35
Subcontractor Percentage Amount
CEN TEX HYDROSEED, INC. 5.27% $38,693.02
D. I. J. CONSTRUCTION, INC. 2.72% $19,970.59
FLASHER EQUIPMENT COMPANY 1.44% $10,572.67
WEST TEXAS ROCK RESOURCES, LLC 0.64% $4,698.96
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.53% $3,891.33
Total: 10.60% $77,826.57

Bid Items

Items: 53, 0 filtered
ROBERTSON US 79  |  BRYAN  |  0205-02-067  |  11/03/2021  |  $875,815  |  F 2022(117)  |  INTERS IMPRVS WITH LEFT TURN LN  |  31 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH BIG CREEK CONSTRUCTION, LTD. LARRY YOUNG PAVING, INC. TEXAS MATERIALS GROUP, INC. A. L. HELMCAMP, INC. TEXCON GENERAL CONTRACTORS
100 6002 PREPARING ROW STA 34.000 $3,000.000 $295.000 $500.000 $2,051.800 $300.000 $315.000 $442.000
112 6002 SUBGRADE WIDENING (DENS CONT) STA 34.000 $550.000 $783.000 $750.000 $580.000 $900.000 $700.000 $900.000
132 6022 EMBANKMENT (VEHICLE)(DENS CONT)(TY C) CY 1,398.000 $25.000 $3.500 $20.000 $21.500 $25.000 $40.000 $21.750
134 6001 BACKFILL (TY A) STA 34.000 $145.000 $88.000 $200.000 $620.000 $440.000 $250.000 $795.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 6,574.000 $0.750 $0.400 $1.000 $1.500 $1.400 $1.000 $1.100
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 6,574.000 $0.150 $0.330 $0.350 $0.250 $0.300 $0.320 $0.330
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 6,574.000 $0.100 $0.280 $0.300 $0.250 $0.150 $0.260 $0.280
168 6001 VEGETATIVE WATERING MG 65.700 $25.000 $40.000 $15.000 $32.000 $20.000 $20.000 $95.000
247 6292 FL BS (CMP IN PLACE)(TY D GR 1-2)(11") SY 8,068.500 $15.000 $17.740 $23.000 $15.000 $19.500 $19.000 $21.000
275 6001 CEMENT TON 99.800 $160.000 $200.000 $220.000 $200.000 $180.000 $195.000 $195.000
275 6006 CEMENT TREAT (EXIST MATL) (10") SY 8,068.500 $2.000 $1.540 $4.000 $2.750 $4.000 $4.600 $3.500
316 6029 ASPH (RC-250) GAL 2,017.100 $4.250 $5.760 $4.750 $11.000 $5.000 $4.000 $6.000
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 59.800 $100.000 $267.000 $160.000 $170.000 $265.000 $325.000 $175.000
462 6046 CONC BOX CULV (3 FT X 3 FT)(EXTEND) LF 14.000 $525.000 $1,250.000 $550.000 $240.000 $750.000 $866.000 $920.000
464 6005 RC PIPE (CL III)(24 IN) LF 170.000 $105.000 $62.000 $70.000 $75.000 $120.000 $162.000 $172.000
467 6105 SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C) EA 1.000 $8,000.000 $7,100.000 $4,500.000 $2,700.000 $5,750.000 $6,825.000 $7,222.000
467 6106 SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) EA 1.000 $8,000.000 $7,400.000 $5,750.000 $3,000.000 $6,000.000 $7,875.000 $8,330.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 8.000 $1,200.000 $1,000.000 $1,700.000 $1,400.000 $1,600.000 $2,625.000 $2,780.000
496 6016 REMOV STR (PIPE) EA 4.000 $425.000 $670.000 $460.000 $600.000 $700.000 $1,315.000 $1,389.000
500 6001 MOBILIZATION LS 1.000 $80,000.000 $56,700.000 $82,000.000 $83,000.100 $81,500.000 $85,000.000 $78,100.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $8,000.000 $11,000.000 $5,000.000 $2,000.000 $3,500.000 $5,700.000 $7,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 320.000 $30.000 $31.000 $30.000 $31.000 $28.000 $30.000 $31.250
506 6011 ROCK FILTER DAMS (REMOVE) LF 320.000 $9.000 $11.000 $12.000 $11.000 $10.000 $11.000 $11.150
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 6,280.000 $3.500 $3.220 $3.000 $3.250 $2.900 $3.100 $3.250
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 6,280.000 $1.000 $0.830 $1.000 $0.750 $0.500 $0.800 $0.840
530 6006 DRIVEWAYS (SURF TREAT) SY 245.000 $15.000 $42.000 $15.000 $9.500 $32.000 $45.000 $27.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 3,272.000 $0.200 $1.000 $0.500 $1.250 $0.500 $1.150 $1.200
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 2,278.000 $0.200 $1.140 $0.700 $2.000 $0.660 $1.150 $1.200
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 4.000 $525.000 $680.000 $650.000 $930.000 $625.000 $622.000 $659.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $525.000 $771.000 $700.000 $940.000 $700.000 $713.000 $755.000
644 6006 IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL) EA 7.000 $750.000 $844.000 $800.000 $950.000 $775.000 $997.000 $1,060.000
644 6076 REMOVE SM RD SN SUP&AM EA 13.000 $85.000 $106.000 $100.000 $94.000 $80.000 $60.000 $64.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 2.000 $10.000 $11.000 $12.000 $22.000 $10.000 $15.000 $16.000
658 6101 INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF EA 2.000 $75.000 $95.000 $90.000 $230.000 $85.000 $78.000 $84.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 336.000 $1.100 $1.000 $1.000 $3.250 $1.000 $0.500 $6.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 462.000 $1.400 $1.000 $1.000 $3.250 $1.000 $0.500 $6.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 300.000 $1.500 $0.320 $1.000 $2.250 $2.100 $3.000 $2.800
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,368.000 $1.000 $1.610 $2.000 $1.750 $1.650 $1.500 $2.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 14.000 $5.500 $28.000 $30.000 $13.500 $12.000 $26.000 $13.500
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 2.000 $150.000 $334.000 $300.000 $270.000 $245.000 $315.000 $195.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 1.000 $0.500 $110.000 $1.000 $1.250 $1.200 $105.000 $25.000
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 3,312.000 $0.400 $0.720 $0.750 $0.750 $0.750 $0.680 $1.090
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 9,214.000 $0.400 $0.720 $0.750 $0.750 $0.750 $0.680 $1.000
668 6019 PREFAB PAV MRK TY B (W)(ARROW) EA 4.000 $500.000 $670.000 $450.000 $440.000 $350.000 $630.000 $755.000
672 6007 REFL PAV MRKR TY I-C EA 53.000 $4.000 $6.000 $10.000 $5.500 $5.000 $5.250 $5.600
672 6009 REFL PAV MRKR TY II-A-A EA 546.000 $4.000 $4.500 $5.000 $5.500 $5.000 $4.200 $4.900
672 6010 REFL PAV MRKR TY II-C-R EA 1.000 $4.000 $11.000 $10.000 $11.000 $10.000 $10.500 $25.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 4,232.000 $0.500 $0.500 $1.000 $0.250 $0.320 $0.500 $1.150
3077 6032 SP MIXES SP-C PG76-22 TON 2,662.600 $110.000 $88.000 $88.000 $110.000 $120.000 $112.000 $118.000
3084 6001 BONDING COURSE GAL 1,613.700 $3.600 $3.900 $3.000 $4.750 $3.250 $3.750 $5.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $8,000.000 $1,100.000 $6,000.000 $2,000.000 $3,000.000 $7,500.000 $2,000.000
6185 6002 TMA (STATIONARY) DAY 30.000 $180.000 $400.000 $200.000 $330.000 $165.000 $200.000 $500.000
6185 6005 TMA (MOBILE OPERATION) DAY 4.000 $200.000 $730.000 $225.000 $330.000 $275.000 $650.000 $1,500.000
Totals: $875,815.30 $734,212.87 $823,508.33 $875,000.00 $895,793.29 $939,962.63 $983,879.97