REMOVING CONC (PAV)
|
SY
|
1,106.000
|
$6.700
|
$10.000
|
$5.000
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
22.700
|
$8.000
|
$50.000
|
$25.000
|
$15.000
|
$65.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
272.000
|
$11.000
|
$15.000
|
$13.000
|
$15.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
195.990
|
$420.000
|
$500.000
|
$500.000
|
$500.000
|
$350.000
|
|
|
BLADING
|
STA
|
114.240
|
$220.000
|
$250.000
|
$110.000
|
$58.000
|
$100.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
36,271.000
|
$1.100
|
$0.500
|
$0.150
|
$0.700
|
$0.850
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
36,271.000
|
$0.260
|
$0.350
|
$0.350
|
$0.340
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
18,135.500
|
$0.100
|
$0.300
|
$0.300
|
$0.300
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
18,135.500
|
$0.100
|
$0.300
|
$0.300
|
$0.300
|
$0.350
|
|
|
VEGETATIVE WATERING
|
MG
|
1,088.000
|
$18.000
|
$5.000
|
$19.000
|
$12.000
|
$18.000
|
|
|
FL BS (CMP IN PLC)(TY-D GR-1-2)(14")
|
SY
|
19,891.000
|
$29.500
|
$22.000
|
$20.750
|
$22.000
|
$31.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
24,645.000
|
$3.000
|
$3.000
|
$4.450
|
$3.000
|
$8.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
244.000
|
$160.000
|
$150.000
|
$175.000
|
$150.000
|
$165.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,976.000
|
$3.500
|
$5.000
|
$6.250
|
$4.600
|
$5.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
2,112.000
|
$90.000
|
$108.000
|
$98.500
|
$103.000
|
$125.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
31,461.000
|
$90.000
|
$108.000
|
$98.500
|
$103.000
|
$125.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
7,506.000
|
$70.000
|
$60.000
|
$63.000
|
$69.000
|
$86.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
14,525.000
|
$100.000
|
$94.000
|
$91.500
|
$93.000
|
$113.000
|
|
|
STONE-MTRX-ASPH SMA-D PG76-22
|
TON
|
2,277.000
|
$100.000
|
$94.000
|
$125.000
|
$91.000
|
$114.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
395,911.000
|
$1.200
|
$0.500
|
$0.690
|
$0.800
|
$1.100
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
121,209.000
|
$1.300
|
$1.000
|
$1.130
|
$1.300
|
$1.200
|
|
|
PLANE ASPH CONC PAV (1 1/4")
|
SY
|
56,783.000
|
$1.000
|
$0.500
|
$1.210
|
$1.000
|
$1.300
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
1,733.000
|
$2.000
|
$2.000
|
$2.510
|
$2.900
|
$2.800
|
|
|
PLANE ASPH CONC PAV (6.5")
|
SY
|
8,107.000
|
$6.000
|
$4.000
|
$4.580
|
$4.500
|
$3.500
|
|
|
PLANE ASPH CONC PAV (2"-3 1/2")
|
SY
|
6,066.000
|
$2.000
|
$2.000
|
$2.130
|
$3.000
|
$2.500
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
442.000
|
$26.000
|
$35.000
|
$31.000
|
$45.000
|
$55.000
|
|
|
CUT & RESTORING PAV
|
SY
|
341.000
|
$120.000
|
$60.000
|
$25.000
|
$40.000
|
$170.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
89.000
|
$4.000
|
$20.000
|
$6.500
|
$18.000
|
$15.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$170.000
|
$1,000.000
|
$600.000
|
$460.000
|
$1,000.000
|
|
|
CL A CONC (PLUG)
|
EA
|
2.000
|
$1,445.000
|
$1,000.000
|
$800.000
|
$460.000
|
$1,100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.150
|
$400.000
|
$1,000.000
|
$1,500.000
|
$440.000
|
$670.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
116.000
|
$425.000
|
$400.000
|
$460.000
|
$440.000
|
$670.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
442.000
|
$33.000
|
$40.000
|
$39.000
|
$39.000
|
$40.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
21.000
|
$70.000
|
$80.000
|
$104.000
|
$77.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
696.000
|
$55.000
|
$60.000
|
$84.000
|
$63.000
|
$59.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
104.000
|
$75.000
|
$70.000
|
$136.000
|
$66.000
|
$101.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$2,427.000
|
$3,000.000
|
$2,500.000
|
$3,500.000
|
$2,500.000
|
|
|
INLT(COMPL)(PAZD)(FG)(3'X3'-3'X3')(MOD)
|
EA
|
1.000
|
$7,350.000
|
$3,000.000
|
$3,900.000
|
$3,500.000
|
$3,900.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$750.000
|
$800.000
|
$1,275.000
|
$1,400.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$1,200.000
|
$1,100.000
|
$1,560.000
|
$1,300.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,200.000
|
$1,100.000
|
$1,560.000
|
$2,200.000
|
$1,100.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$500.000
|
$500.000
|
$530.000
|
$350.000
|
$550.000
|
|
|
REMOV STR (SET)
|
EA
|
34.000
|
$500.000
|
$300.000
|
$315.000
|
$180.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
702.000
|
$19.000
|
$10.000
|
$16.000
|
$15.000
|
$23.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$670,000.000
|
$300,000.000
|
$390,000.000
|
$258,000.000
|
$850,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$7,500.000
|
$2,300.000
|
$3,400.000
|
$5,000.000
|
$5,100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$32.000
|
$20.000
|
$28.000
|
$27.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$3.000
|
$9.000
|
$7.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,100.000
|
$2.600
|
$2.500
|
$3.100
|
$2.100
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,100.000
|
$0.700
|
$0.250
|
$0.650
|
$0.650
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
86.000
|
$4.600
|
$5.000
|
$7.000
|
$4.500
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
86.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$5.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
3,150.000
|
$35.000
|
$15.000
|
$13.200
|
$45.000
|
$55.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
5,790.000
|
$10.000
|
$8.000
|
$10.000
|
$9.000
|
$5.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
120.000
|
$10.000
|
$10.000
|
$8.000
|
$9.000
|
$35.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
3,150.000
|
$8.000
|
$10.000
|
$11.000
|
$12.000
|
$20.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
142.000
|
$31.000
|
$50.000
|
$50.000
|
$33.000
|
$65.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,272.000
|
$31.000
|
$30.000
|
$27.000
|
$33.000
|
$35.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
167.000
|
$65.000
|
$120.000
|
$120.000
|
$90.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
72,204.000
|
$0.160
|
$0.170
|
$0.120
|
$0.140
|
$0.170
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
101,861.000
|
$0.160
|
$0.170
|
$0.150
|
$0.140
|
$0.170
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,975.000
|
$20.000
|
$27.000
|
$22.500
|
$22.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$2,100.000
|
$2,600.000
|
$1,805.000
|
$1,700.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,500.000
|
$1,500.000
|
$1,200.000
|
$1,185.000
|
$1,400.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$1,200.000
|
$900.000
|
$700.000
|
$685.000
|
$850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,850.000
|
$2.500
|
$3.000
|
$3.100
|
$3.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$215.000
|
$400.000
|
$360.000
|
$350.000
|
$130.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,400.000
|
$3,000.000
|
$2,900.000
|
$2,825.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$250.000
|
$250.000
|
$260.000
|
$250.000
|
$270.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$11,400.000
|
$10,000.000
|
$9,500.000
|
$10,000.000
|
$12,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,800.000
|
$3,000.000
|
$2,200.000
|
$2,000.000
|
$3,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$1,000.000
|
$860.000
|
$600.000
|
$3,300.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
8.000
|
$180.000
|
$150.000
|
$260.000
|
$125.000
|
$130.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$600.000
|
$500.000
|
$520.000
|
$450.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$500.000
|
$400.000
|
$380.000
|
$365.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$525.000
|
$500.000
|
$505.000
|
$485.000
|
$540.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$715.000
|
$600.000
|
$565.000
|
$545.000
|
$530.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
18.000
|
$400.000
|
$300.000
|
$300.000
|
$290.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
18.000
|
$115.000
|
$100.000
|
$78.000
|
$60.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
31.000
|
$20.000
|
$30.000
|
$26.000
|
$25.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
50.000
|
$80.000
|
$150.000
|
$135.000
|
$130.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
16,832.000
|
$0.250
|
$0.220
|
$0.220
|
$0.210
|
$0.220
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
14,432.000
|
$1.300
|
$1.100
|
$1.040
|
$1.000
|
$1.060
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,495.000
|
$1.050
|
$1.000
|
$1.150
|
$0.900
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
15,449.000
|
$1.050
|
$1.000
|
$1.150
|
$0.900
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
190.000
|
$0.950
|
$2.200
|
$2.080
|
$2.000
|
$2.120
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
19,796.000
|
$0.850
|
$0.700
|
$0.710
|
$0.680
|
$0.720
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
818.000
|
$5.500
|
$8.000
|
$7.820
|
$7.500
|
$7.950
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
37.000
|
$125.000
|
$110.000
|
$104.000
|
$100.000
|
$106.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
9.000
|
$125.000
|
$200.000
|
$200.000
|
$195.000
|
$206.700
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
8.000
|
$500.000
|
$600.000
|
$625.000
|
$600.000
|
$636.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
38.000
|
$30.000
|
$70.000
|
$62.520
|
$60.000
|
$63.600
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
1,428.000
|
$4.000
|
$8.000
|
$6.250
|
$6.000
|
$6.360
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
38,617.000
|
$0.350
|
$0.340
|
$0.340
|
$0.330
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
143,507.000
|
$0.350
|
$0.320
|
$0.320
|
$0.310
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
19,836.000
|
$0.350
|
$0.340
|
$0.340
|
$0.330
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
218,044.000
|
$0.350
|
$0.330
|
$0.330
|
$0.320
|
$0.340
|
|
REFL PAV MRKR TY I-C
|
EA
|
2,214.000
|
$3.250
|
$4.000
|
$3.600
|
$3.500
|
$3.710
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,401.000
|
$3.250
|
$4.000
|
$3.600
|
$3.500
|
$3.710
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
153.000
|
$3.250
|
$4.000
|
$3.600
|
$3.500
|
$3.710
|
|
TRAFFIC BUTTON TY I-C
|
EA
|
418.000
|
$3.250
|
$4.000
|
$3.400
|
$3.300
|
$3.710
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,500.000
|
$5,000.000
|
$5,000.000
|
$7,500.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
6.000
|
$10,000.000
|
$5,000.000
|
$5,000.000
|
$4,000.000
|
$10,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
88.000
|
$200.000
|
$250.000
|
$450.000
|
$200.000
|
$500.000
|
|
Totals: |
$8,951,280.260
|
$8,287,389.920
|
$8,311,032.070
|
$8,454,668.700
|
$10,946,351.740
|