Job Info for 0049-06-081

County: ROBERTSON Highway: SH 6 Date: 08/06/2020 (4 years ago) Engineer's Estimate: $7,011,827 Control Number: 0049-06-081
Project: C 49-6-81 District: BRYAN Time: 213 WORKING DAYS Type: INSTALL CABLE MEDIAN BARRIER

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,011,826.91
GRATIOT CONSTRUCTION, LTD.   $4,499,882.69 1
-35.82% | -$2,511,944.22
SCR CIVIL CONSTRUCTION, LLC   $5,090,909.55 2
-27.4% | -$1,920,917.36
13.13% | $591,026.86
MASSANA, INC.   $5,311,929.00 3
-24.24% | -$1,699,897.91
18.05% | $812,046.31
4.34% | $221,019.45
CROSS PLUS CONSTRUCTION, LLC   $5,866,059.96 4
-16.34% | -$1,145,766.95
30.36% | $1,366,177.27
10.43% | $554,130.96
ALTUS CONSTRUCTION LLC   $7,343,862.46 5
4.74% | $332,035.55
63.2% | $2,843,979.77
25.19% | $1,477,802.50

Bid Items

Items: 26, 0 filtered
ROBERTSON SH 6  |  BRYAN  |  0049-06-081  |  08/06/2020  |  $7,011,827  |  C 49-6-81  |  INSTL CABLE MEDIAN BARRIER  |  213 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate GRATIOT CONSTRUCTION, LTD. SCR CIVIL CONSTRUCTION, LLC MASSANA, INC. CROSS PLUS CONSTRUCTION, LLC ALTUS CONSTRUCTION LLC
150 6001 BLADING STA 1,333.000 $600.000 $166.960 $55.000 $95.000 $200.000 $502.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 441,892.000 $1.500 $0.120 $0.760 $0.050 $3.000 $1.720
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 296,224.000 $0.150 $0.160 $0.200 $0.150 $0.170 $0.260
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 145,668.000 $0.150 $0.160 $0.130 $0.150 $0.170 $0.260
164 6009 BROADCAST SEED (TEMP) (WARM) SY 220,946.000 $0.150 $0.140 $0.170 $0.140 $0.170 $0.220
164 6011 BROADCAST SEED (TEMP) (COOL) SY 220,946.000 $0.150 $0.140 $0.170 $0.140 $0.170 $0.220
168 6001 VEGETATIVE WATERING MG 4,420.000 $15.000 $50.350 $56.000 $1.000 $15.000 $28.690
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 4,356.000 $460.000 $441.110 $412.000 $375.000 $375.000 $473.280
500 6001 MOBILIZATION LS 1.000 $637,438.810 $671,425.060 $350,000.000 $939,243.220 $499,000.000 $731,484.800
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15.000 $10,000.000 $1.000 $9,000.000 $30,000.000 $10,000.000 $28,685.680
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,314.000 $28.500 $32.940 $43.800 $40.000 $20.000 $43.030
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,314.000 $8.000 $10.590 $13.000 $9.000 $10.000 $14.340
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,813.000 $2.500 $3.240 $4.900 $4.500 $2.000 $4.300
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,813.000 $0.800 $0.880 $0.850 $1.000 $1.000 $1.430
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 672.000 $5.500 $4.710 $4.550 $4.500 $8.000 $7.170
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 672.000 $1.300 $1.180 $1.400 $1.500 $2.000 $1.430
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 1,359.000 $75.000 $106.000 $101.000 $95.000 $186.000 $87.200
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 50.000 $22.000 $21.870 $150.000 $80.000 $85.000 $27.840
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,300.000 $1,226.470 $2,000.000 $1,900.000 $1,254.000 $1,653.390
543 6002 CABLE BARRIER SYSTEM (TL-4) LF 116,756.000 $15.000 $6.530 $9.000 $8.000 $8.780 $10.330
543 6020 CABLE BARRIER TERMINAL SECTION (TL-4) EA 149.000 $2,500.000 $1,884.590 $2,800.000 $4,500.000 $1,758.000 $3,099.230
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $2,700.000 $3,435.290 $5,000.000 $4,217.500 $3,000.000 $3,529.200
658 6071 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 14.000 $26.000 $61.320 $100.000 $40.000 $25.000 $28.890
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 8.000 $6,500.000 $1.000 $4,000.000 $6,500.000 $20,000.000 $7,171.420
6185 6002 TMA (STATIONARY) DAY 422.000 $220.000 $1.000 $220.000 $150.000 $5.000 $358.570
6185 6005 TMA (MOBILE OPERATION) DAY 422.000 $270.000 $1.000 $350.000 $125.000 $5.000 $573.710
Totals: $7,011,826.91 $4,499,882.69 $5,090,909.55 $5,311,929.00 $5,866,059.96 $7,343,862.46