PREPARING ROW
|
STA
|
14.250
|
$2,000.000
|
$7,350.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
983.000
|
$15.000
|
$22.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,212.000
|
$25.000
|
$28.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
6,629.000
|
$0.250
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
75.000
|
$50.000
|
$77.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,620.000
|
$115.000
|
$125.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
97.000
|
$320.000
|
$449.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
4,165.000
|
$18.000
|
$7.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
770.000
|
$6.000
|
$11.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
1,500.000
|
$4.000
|
$7.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
46.000
|
$250.000
|
$561.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
34.000
|
$200.000
|
$705.000
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
1,230.000
|
$4.000
|
$8.000
|
|
|
CEM STABIL BKFL
|
CY
|
153.000
|
$215.000
|
$353.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
961.000
|
$30.000
|
$108.750
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,020.000
|
$300.000
|
$260.000
|
|
|
CL C CONC (ABUT)
|
CY
|
63.800
|
$1,250.000
|
$2,170.000
|
|
|
CL C CONC (CAP)
|
CY
|
199.700
|
$1,700.000
|
$2,227.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
216.800
|
$1,400.000
|
$1,138.000
|
|
|
REINF CONC SLAB
|
SF
|
42,050.000
|
$25.000
|
$28.000
|
|
|
APPROACH SLAB
|
CY
|
89.900
|
$850.000
|
$1,266.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
3,127.680
|
$190.000
|
$260.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,361.500
|
$190.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
785.000
|
$200.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$575.000
|
$1,110.000
|
|
|
RAIL (TY T223)
|
LF
|
1,498.000
|
$160.000
|
$134.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
230.000
|
$160.000
|
$313.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$250,000.000
|
$281,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$593,801.620
|
$530,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$5,500.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
172.000
|
$50.000
|
$49.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
172.000
|
$25.000
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,644.000
|
$5.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,644.000
|
$1.500
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
625.000
|
$90.000
|
$45.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,090.000
|
$55.000
|
$80.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
970.000
|
$15.000
|
$13.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,090.000
|
$19.000
|
$18.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$30.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$1,330.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
952.000
|
$5.000
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$2,379.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$116.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,300.000
|
$751.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,250.000
|
$452.000
|
|
|
CRASH CUSH ATTEN (INSTL) (S) (TL3)
|
EA
|
2.000
|
$2,000.000
|
$7,891.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,000.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$95.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$25.000
|
$45.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$30.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
4.000
|
$70.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
970.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$10.000
|
$1.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
2,900.000
|
$0.500
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
2,848.000
|
$1.250
|
$2.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
2,848.000
|
$1.000
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
36.000
|
$6.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,697.000
|
$0.100
|
$0.040
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,500.000
|
$17,064.000
|
|
|
PORTABLE TRAFFIC SIGNAL
|
MO
|
6.000
|
$5,500.000
|
$6,162.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2.000
|
$9,000.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$75.000
|
$71.000
|
|
Totals: |
$6,531,817.770
|
$7,586,856.630
|