REMOVING CONC (RIPRAP)
|
SY
|
4,409.000
|
$15.000
|
$26.000
|
$17.270
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
229.000
|
$35.000
|
$30.000
|
$34.770
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
26,035.000
|
$6.000
|
$10.000
|
$4.450
|
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
4,244.000
|
$6.000
|
$12.000
|
$11.290
|
|
|
|
REMOVING STAB BASE AND ASPH PAV(7"-10")
|
SY
|
27,857.000
|
$3.900
|
$12.000
|
$10.100
|
|
|
|
REMOVING STAB BASE AND ASPH PAV(4"-16")
|
SY
|
126,446.000
|
$5.500
|
$4.000
|
$6.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
110,592.000
|
$13.000
|
$15.000
|
$11.650
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
256,881.000
|
$20.000
|
$34.000
|
$27.300
|
|
|
|
BLADING
|
HR
|
100.000
|
$170.000
|
$400.000
|
$326.220
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
667,809.000
|
$0.150
|
$0.200
|
$0.190
|
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$110.000
|
$105.000
|
$244.590
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
332,667.000
|
$12.000
|
$18.000
|
$13.930
|
|
|
|
PRIME COAT (AE-P)
|
GAL
|
102,988.000
|
$3.500
|
$5.000
|
$6.330
|
|
|
|
PRIME COAT (CSS-1H)
|
GAL
|
2,807.000
|
$3.500
|
$5.000
|
$6.130
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
189,248.000
|
$2.000
|
$2.200
|
$2.770
|
|
|
|
CONC PVMT (CONT REINF - CRCP) (6")
|
SY
|
320.000
|
$200.000
|
$190.000
|
$147.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
1,302.000
|
$250.000
|
$325.000
|
$282.490
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
62,773.000
|
$14.000
|
$25.000
|
$30.890
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
120.000
|
$275.000
|
$385.000
|
$433.110
|
|
|
|
CL A CONC (CHANNEL LINING)
|
CY
|
10,543.000
|
$325.000
|
$600.000
|
$791.970
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
35.000
|
$600.000
|
$885.000
|
$866.220
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
378.000
|
$750.000
|
$461.000
|
$989.970
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,358.000
|
$500.000
|
$485.000
|
$1,051.840
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
814.000
|
$725.000
|
$550.000
|
$1,144.650
|
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
2,107.000
|
$950.000
|
$934.000
|
$1,856.190
|
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
2,017.000
|
$530.000
|
$535.000
|
$1,237.460
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
901.000
|
$95.000
|
$129.000
|
$173.240
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
234.000
|
$250.000
|
$190.000
|
$321.740
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
675.000
|
$150.000
|
$124.000
|
$204.180
|
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
532.000
|
$180.000
|
$182.000
|
$272.240
|
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
222.000
|
$300.000
|
$225.000
|
$352.680
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
12.000
|
$9,300.000
|
$9,750.000
|
$11,137.130
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
16.000
|
$12,000.000
|
$10,900.000
|
$13,612.040
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$9,000.000
|
$11,500.000
|
$15,468.230
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
26.000
|
$13,500.000
|
$10,780.000
|
$16,705.690
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
42.000
|
$8,677.000
|
$10,930.000
|
$18,561.880
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
38.000
|
$12,500.000
|
$11,095.000
|
$19,799.330
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
58.000
|
$18,550.000
|
$12,650.000
|
$22,274.250
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
64.000
|
$1,200.000
|
$2,700.000
|
$1,484.950
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$1,750.000
|
$2,600.000
|
$2,227.430
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$1,650.000
|
$3,150.000
|
$2,227.430
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,875.000
|
$3,175.000
|
$2,474.920
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
14.000
|
$2,500.000
|
$3,850.000
|
$3,712.380
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
9.000
|
$3,500.000
|
$5,360.000
|
$4,331.100
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$7,000.000
|
$7,785.000
|
$4,331.100
|
|
|
|
REMOV STR (SET)
|
EA
|
16.000
|
$1,500.000
|
$850.000
|
$1,484.950
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,100.000
|
$2,000.000
|
$3,093.650
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
54.000
|
$70.000
|
$81.000
|
$494.980
|
|
|
|
REMOV STR (PIPE)
|
EA
|
8.000
|
$500.000
|
$1,980.000
|
$3,093.650
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$8,100,000.000
|
$16,759,207.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$15,000.000
|
$40,000.000
|
$150,000.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,361.000
|
$33.000
|
$20.000
|
$66.250
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,361.000
|
$9.500
|
$3.000
|
$16.500
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
138.000
|
$2.650
|
$7.000
|
$11.400
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
138.000
|
$0.800
|
$1.200
|
$3.180
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
5,104.000
|
$5.200
|
$7.000
|
$7.610
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,104.000
|
$2.200
|
$1.500
|
$1.600
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
27,857.000
|
$80.000
|
$65.000
|
$60.570
|
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
3,696.000
|
$90.000
|
$120.000
|
$54.410
|
|
|
|
ONE-WAY TRAFFIC CONTROL (PORT TRAF SIG)
|
DAY
|
462.000
|
$315.000
|
$550.000
|
$687.880
|
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
37,830.000
|
$45.000
|
$65.000
|
$60.000
|
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
36,323.000
|
$10.000
|
$15.000
|
$2.880
|
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
36,998.000
|
$10.000
|
$15.000
|
$1.470
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
320.000
|
$90.000
|
$133.990
|
$142.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
14,035.000
|
$52.000
|
$59.040
|
$44.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
178,380.000
|
$0.220
|
$0.220
|
$0.070
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
154,510.000
|
$0.200
|
$0.240
|
$0.070
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
32.000
|
$1,475.000
|
$3,000.000
|
$4,331.100
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
33.000
|
$920.000
|
$3,000.000
|
$2,474.920
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
33.000
|
$35,000.000
|
$15,000.000
|
$9,280.940
|
|
|
|
IN RD IL (TY SA) 50T-12 (400W EQ) LED
|
EA
|
12.000
|
$6,500.000
|
$7,810.000
|
$8,785.950
|
|
|
|
IN RD IL (TY AL) 50T-12 (400W EQ) LED
|
EA
|
12.000
|
$400.000
|
$7,810.000
|
$8,785.950
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,120.000
|
$11.000
|
$11.000
|
$12.370
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
410.000
|
$30.000
|
$33.000
|
$37.120
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,530.000
|
$2.500
|
$2.480
|
$2.780
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
3,060.000
|
$2.500
|
$2.750
|
$3.090
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
10.000
|
$1,700.000
|
$1,980.000
|
$2,227.430
|
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$11,000.000
|
$9,900.000
|
$11,137.130
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$775.000
|
$742.500
|
$1,175.590
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$925.000
|
$797.500
|
$1,361.200
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$3,000.000
|
$1,375.000
|
$1,454.010
|
|
|
|
IN SM RD SN SUP&AM TYFRP(1)UB(P)
|
EA
|
1.000
|
$90.000
|
$1,375.000
|
$235.120
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,100.000
|
$1,375.000
|
$1,577.760
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$1,100.000
|
$1,375.000
|
$1,763.380
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$1,200.000
|
$1,375.000
|
$1,800.500
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
75.000
|
$175.000
|
$192.500
|
$136.120
|
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
3.000
|
$65.000
|
$84.700
|
$185.620
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
5.000
|
$80.000
|
$26.400
|
$18.560
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
47.000
|
$80.000
|
$92.400
|
$185.620
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
36.000
|
$90.000
|
$107.800
|
$185.620
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
169,490.000
|
$0.200
|
$0.280
|
$0.310
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
339,064.000
|
$0.800
|
$0.580
|
$0.890
|
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
834.000
|
$1.250
|
$2.310
|
$1.670
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
18,238.000
|
$0.700
|
$0.870
|
$0.930
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
456.000
|
$1.250
|
$1.100
|
$1.240
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,250.000
|
$1.150
|
$1.100
|
$1.240
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
182,970.000
|
$0.680
|
$0.730
|
$0.820
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
14,870.000
|
$0.750
|
$0.730
|
$0.820
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
124,560.000
|
$0.750
|
$0.730
|
$0.820
|
|
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
98.000
|
$35.000
|
$27.500
|
$30.940
|
|
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
23.000
|
$650.000
|
$412.500
|
$464.050
|
|
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
23.000
|
$800.000
|
$467.500
|
$525.920
|
|
|
|
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
|
EA
|
34.000
|
$57.200
|
$93.500
|
$105.180
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
98.000
|
$19.000
|
$16.500
|
$18.560
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$255.000
|
$236.500
|
$266.050
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
23.000
|
$350.000
|
$291.500
|
$327.930
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
24.000
|
$28.000
|
$42.900
|
$48.260
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
452.000
|
$4.250
|
$4.400
|
$4.950
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,170.000
|
$3.500
|
$4.400
|
$4.950
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
189,838.000
|
$0.500
|
$0.610
|
$0.680
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
834.000
|
$0.900
|
$0.950
|
$1.060
|
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
6.000
|
$10,000.000
|
$13,750.000
|
$15,468.230
|
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
3.000
|
$750.000
|
$550.000
|
$618.730
|
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
115,504.000
|
$100.000
|
$155.000
|
$138.520
|
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
1,544.000
|
$120.000
|
$100.000
|
$302.000
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
56,643.000
|
$160.000
|
$170.000
|
$198.110
|
|
|
|
BONDING COURSE
|
GAL
|
102,988.000
|
$2.500
|
$4.460
|
$5.250
|
|
|
|
EMULSION
|
GAL
|
95,264.000
|
$2.250
|
$4.290
|
$3.750
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
260.000
|
$160.000
|
$97.190
|
$117.640
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,827.000
|
$110.000
|
$82.000
|
$80.430
|
|
1A
|
|
THERMO PIPE(24")(PP)(TY D)(TY II)
|
LF
|
2,827.000
|
$110.000
|
$0.000
|
$0.000
|
|
Totals: |
$56,484,915.250
|
$81,336,501.640
|
$96,379,959.430
|