Show Job Controls
Bid Cobra

REEVES US 285 (0139-06-021)

Items: 142

County: REEVES
Length: N/A
Highway: US 285
District: ODESSA
Control Number: 0139-06-021
DBE Goal: N/A
Project: C 139-6-21
Guaranty: N/A
Time: 805 WORKING DAYS
Engineer's Estimate: $65,370,021.95
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$65,370,021.95
$58,528,500.77
Over/Under Est: -10.47% -$6,841,521.18
$61,109,824.83
Over/Under Est: -6.52% -$4,260,197.12
Amt Left: 4.41% $2,581,324.06
Over/Under Est: -3.87% -$2,528,878.72
Amt Left: 7.37% $4,312,642.46
Delta: -2.83% -$1,731,318.40
Over/Under Est: 4.62% $3,022,851.91
Amt Left: 16.85% $9,864,373.09
Delta: -8.83% -$5,551,730.63
$74,127,020.19
Over/Under Est: 13.4% $8,756,998.24
Amt Left: 26.65% $15,598,519.42
Delta: -8.38% -$5,734,146.33
Subcontractor Percentage Amount
BEAVER CONTRACTORS, LLC 11.53% $6,748,336.14
WILD WEST TRUCKING, LLC 3.97% $2,323,581.48
KL POWELL, LLC 3.82% $2,235,788.73
DOUBLE A CONTRACTING, L.P. 2.43% $1,422,242.57
HUNTER LOGISTICS LLC 2.19% $1,281,774.17
W. S. CONSTRUCTION COMPANY 2.13% $1,246,657.07
CACTUS ASPHALT, A DIVISION OF CACTUS TRANSPORT, INC. 1.64% $959,867.41
TEX OP CONSTRUCTION, LP 1.13% $661,372.06
WILLIS ELECTRIC CO., LP 0.82% $479,933.71
BARRICADES UNLIMITED 0.73% $427,258.06
J & M CONTRACTING, COMPANY 0.64% $374,582.40
BLACKLIDGE EMULSIONS, INC. 0.37% $216,555.45
LONE STAR EROSION CONTROL 0.29% $169,732.65
ELITE TRANSPORTS, LLP 0.23% $134,615.55
MARTIN IBARRA M & J TRUCKING INC. 0.23% $134,615.55
MARCOM"S MOWING SERVICE, LLC 0.20% $117,057.00
AARON CONCRETE CONTRACTORS, L.P. 0.15% $87,792.75
AREA WIDE, INC. 0.15% $87,792.75
MOBILE ENTERPRISES, INC. 0.12% $70,234.20
SURFACE PREPARATION TECHNOLOGIES, LLC 0.09% $52,675.65
S&S BRIDGE PAINTING 0.06% $35,117.10
PENHALL COMPANY 0.03% $17,558.55
DUSTROL, INC. 0.01% $5,852.85
Total: 32.96% $19,290,993.85

Bid Items & Bid Tabulations

142 Total 0 of 142
REEVES  |  US 285  |  ODESSA  |  0139-06-021  |  07/01/2021  |  $65,370,021.95  |  C 139-6-21  |  WIDEN ROAD - ADD LANES  |  805 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
KIEWIT INFRASTRUCTURE SOUTH CO.
FNF CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
ANGEL BROTHERS HOLDINGS CORP.
RK HALL, LLC
EXCAVATION (ROADWAY)
CY 99,958.000 $10.000 $9.400 $15.000 $9.780 $10.000 $8.390
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 67,294.000 $24.000 $7.000 $16.000 $3.700 $7.000 $12.840
BLADING
HR 150.000 $100.000 $229.400 $120.000 $350.000 $185.000 $152.980
PROOF ROLLING
HR 150.000 $100.000 $182.170 $90.000 $150.000 $65.000 $132.750
FL BS (CMP IN PLC)(TY A GR 4)(5")
SY 574,365.000 $8.000 $4.690 $5.000 $6.700 $8.100 $9.030
PRIME COAT (AE-P)
GAL 202,919.000 $4.500 $4.140 $4.100 $3.760 $4.400 $4.700
ASPH (AC-20-5TR)
GAL 376,236.000 $3.250 $3.300 $3.500 $4.340 $3.600 $4.200
AGGR(TY-PB GR-4 SAC-B)
CY 9,077.000 $95.500 $84.370 $90.000 $106.000 $100.000 $134.440
D-GR HMA(SQ) TY-B PG64-22 (LEVEL UP)
TON 8,485.000 $62.000 $71.000 $81.000 $76.000 $85.000 $128.580
STONE-MTRX-ASPH SMAR-F SAC-A
TON 82,347.000 $115.000 $110.000 $94.500 $116.000 $120.000 $137.390
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 89,912.000 $49.000 $10.800 $31.500 $40.000 $37.000 $47.110
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 449,560.000 $2.500 $0.970 $0.900 $1.180 $1.750 $1.170
CEM STABIL BKFL
CY 6,265.000 $80.000 $110.210 $225.000 $120.750 $240.000 $237.600
CUT & RESTORING PAV
SY 7,626.000 $85.000 $54.980 $70.000 $80.000 $47.000 $36.670
TRENCH EXCAVATION PROTECTION
LF 1,719.000 $3.500 $12.760 $320.000 $15.750 $16.000 $16.200
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 330.000 $215.000 $281.660 $400.000 $315.000 $260.000 $324.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 108.000 $172.000 $219.800 $200.000 $208.950 $210.000 $214.920
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 120.000 $218.000 $219.800 $180.000 $208.950 $210.000 $214.920
RIPRAP (CONC)(5 IN)
CY 916.000 $500.000 $482.440 $500.000 $585.900 $620.000 $648.000
RIPRAP (MOW STRIP)(4 IN)
CY 146.000 $510.000 $516.700 $530.000 $840.000 $660.000 $702.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 522.000 $52.000 $101.620 $32.000 $96.600 $100.000 $99.360
CLEANING EXISTING JOINTS
LF 106.000 $25.000 $27.610 $30.000 $26.250 $28.000 $27.000
CLEAN & PAINT EXIST STR (SYSTEM I-B)
LS 1.000 $50,000.000 $41,420.100 $60,000.000 $43,865.850 $40,000.000 $40,500.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 432.000 $170.000 $457.890 $130.000 $174.930 $420.000 $426.600
CONC BOX CULV (5 FT X 2 FT)
LF 287.000 $325.000 $334.100 $400.000 $382.350 $420.000 $442.800
CONC BOX CULV (5 FT X 3 FT)
LF 357.000 $315.000 $352.250 $420.000 $397.640 $450.000 $464.400
CONC BOX CULV (6 FT X 3 FT)
LF 278.000 $365.000 $443.260 $450.000 $114.660 $600.000 $610.200
CONC BOX CULV (7 FT X 3 FT)
LF 1,481.000 $450.000 $967.660 $480.000 $582.120 $750.000 $844.240
CONC BOX CULV (8 FT X 5 FT)
LF 260.000 $575.000 $913.540 $700.000 $904.050 $900.000 $945.000
CONC BOX CULV (10 FT X 8 FT)
LF 316.000 $965.000 $913.550 $900.000 $927.570 $1,600.000 $1,620.000
RC PIPE (CL III)(18 IN)
LF 2,893.000 $54.000 $91.140 $0.000 $81.000 $0.000 $0.000
RC PIPE (CL III)(24 IN)
LF 117.000 $75.000 $91.130 $0.000 $110.250 $0.000 $0.000
RC PIPE (CL III)(24 IN)
LF 3,332.000 $75.000 $102.910 $105.000 $104.080 $100.000 $102.600
RC PIPE (CL III)(30 IN)
LF 2,801.000 $110.000 $125.240 $180.000 $130.100 $130.000 $135.000
RC PIPE (CL III)(30 IN)
LF 235.000 $110.000 $91.140 $0.000 $134.210 $0.000 $0.000
RC PIPE (CL III)(36 IN)
LF 1,558.000 $130.000 $161.860 $210.000 $169.200 $180.000 $189.000
SET (TY I)(S=10 FT)(HW=9FT)(3:1)(C)
EA 10.000 $15,000.000 $10,093.950 $17,000.000 $13,654.830 $14,000.000 $14,580.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 14.000 $12,155.000 $9,710.080 $5,200.000 $6,745.830 $9,500.000 $9,720.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $7,275.000 $10,441.830 $7,400.000 $7,041.300 $9,000.000 $9,180.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $8,590.000 $8,317.750 $7,500.000 $8,761.200 $11,000.000 $11,340.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 50.000 $10,590.000 $5,472.430 $7,700.000 $9,181.620 $11,000.000 $11,340.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
EA 24.000 $13,405.000 $6,424.170 $8,500.000 $9,181.620 $11,000.000 $11,340.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
EA 8.000 $12,425.000 $8,468.690 $9,500.000 $10,897.110 $13,000.000 $13,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 84.000 $800.000 $1,521.750 $1,300.000 $1,627.510 $1,250.000 $1,296.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 13.000 $1,380.000 $1,929.120 $1,600.000 $1,988.910 $1,300.000 $1,350.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 73.000 $1,800.000 $2,553.610 $1,800.000 $2,246.160 $1,700.000 $1,728.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,400.000 $2,586.360 $2,000.000 $2,246.160 $1,700.000 $1,728.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $1,725.000 $2,744.160 $1,800.000 $2,370.900 $1,700.000 $1,728.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 51.000 $1,830.000 $2,913.470 $2,100.000 $1,293.600 $2,300.000 $2,376.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 17.000 $2,800.000 $3,319.890 $3,200.000 $3,000.970 $3,500.000 $3,240.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,500.000 $3,451.770 $3,400.000 $3,000.970 $3,200.000 $3,240.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 6.000 $2,600.000 $3,859.580 $2,600.000 $3,497.470 $3,300.000 $3,456.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 34.000 $2,800.000 $4,319.070 $2,700.000 $3,946.950 $4,200.000 $4,320.000
REMOV STR (SET)
EA 50.000 $575.000 $1,156.780 $1,000.000 $705.600 $520.000 $540.000
REMOV STR (WINGWALL)
EA 24.000 $1,350.000 $1,233.900 $2,000.000 $705.600 $1,600.000 $1,620.000
REMOV STR (HEADWALL)
EA 22.000 $1,130.000 $1,009.560 $2,100.000 $705.600 $1,600.000 $1,620.000
REMOV STR (PIPE)
LF 1,669.000 $15.000 $16.630 $35.000 $14.110 $11.000 $10.800
REMOV STR (BOX CULVERT)
LF 726.000 $50.000 $296.570 $180.000 $42.630 $90.000 $91.800
REMOV STR (PIPE)
EA 15.000 $380.000 $1,236.370 $1,500.000 $1,470.000 $420.000 $432.000
MOBILIZATION
LS 1.000 $4,766,336.000 $2,848,275.000 $6,117,000.000 $4,700,000.000 $5,910,000.000 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 40.000 $22,000.000 $40,000.000 $35,000.000 $11,000.000 $5,000.000 $15,059.070
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 3,400.000 $29.000 $30.370 $33.000 $6.200 $29.000 $21.670
CONSTRUCTION EXITS (REMOVE)
SY 3,400.000 $10.000 $9.660 $8.000 $4.260 $9.000 $7.570
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $80.000 $232.360 $70.000 $300.000 $90.000 $112.670
TEMP SEDMT CONT FENCE (INSTALL)
LF 24,620.000 $2.500 $3.200 $3.500 $5.650 $3.100 $5.110
TEMP SEDMT CONT FENCE (REMOVE)
LF 24,620.000 $0.500 $0.830 $0.900 $2.000 $0.800 $1.820
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 12,660.000 $7.600 $8.010 $5.500 $9.000 $7.500 $4.650
BIODEG EROSN CONT LOGS (REMOVE)
LF 12,660.000 $1.950 $1.380 $1.300 $4.500 $1.300 $1.250
CONSTRUCTING DETOURS
SY 6,451.000 $40.000 $18.340 $44.000 $15.000 $29.500 $39.570
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 12.000 $5,700.000 $12,192.540 $3,500.000 $6,500.000 $6,000.000 $10,521.900
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 360.000 $51.000 $16.820 $80.000 $52.500 $80.000 $66.770
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 960.000 $12.500 $9.320 $15.000 $13.130 $30.000 $15.010
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 360.000 $10.000 $11.310 $20.000 $18.380 $27.000 $18.720
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 1,050.000 $63.000 $45.570 $80.000 $52.500 $85.000 $67.150
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 28,080.000 $6.000 $10.700 $15.000 $13.130 $24.000 $5.370
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 1,080.000 $7.500 $9.420 $10.760 $18.380 $21.000 $18.720
DRIVEWAYS (CONC)
SY 2,418.000 $94.000 $93.680 $85.000 $103.950 $60.000 $144.280
RUMBLE STRIPS (SHOULDER)
LF 282,606.000 $0.200 $0.100 $0.110 $0.140 $0.130 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 158,130.000 $0.200 $0.100 $0.150 $0.220 $0.150 $0.140
MTL W-BEAM GD FEN (STEEL POST)
LF 2,025.000 $30.000 $31.160 $45.000 $38.850 $30.000 $42.390
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,050.000 $2,153.850 $3,200.000 $2,992.500 $2,000.000 $2,889.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $3.500 $2.210 $1.830 $3.150 $2.100 $1.670
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,400.000 $2,648.680 $4,000.000 $3,675.000 $2,400.000 $3,348.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $313.000 $220.910 $250.000 $315.080 $210.000 $210.600
CRASH CUSH ATTEN (MOVE & RESET)
EA 148.000 $1,500.000 $381.360 $900.000 $2,625.000 $620.000 $936.880
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,000.000 $257.720 $1,000.000 $1,575.000 $310.000 $2,039.090
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $8,100.000 $11,708.080 $1,000.000 $8,400.000 $15,000.000 $13,109.720
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 33.000 $4,250.000 $5,080.870 $6,000.000 $5,250.000 $4,800.000 $5,400.000
CONDT (PVC) (SCH 80) (2")
LF 7,733.000 $8.000 $13.250 $14.000 $12.600 $12.200 $12.960
CONDT (PVC) (SCH 80) (2") (BORE)
LF 919.000 $20.000 $33.140 $41.000 $36.750 $33.000 $37.800
ELEC CONDR (NO.8) BARE
LF 8,652.000 $1.250 $1.490 $1.500 $1.310 $1.490 $1.350
ELEC CONDR (NO.8) INSULATED
LF 16,269.000 $1.250 $1.930 $1.800 $1.580 $1.930 $1.620
GROUND BOX TY A (122311)W/APRON
EA 13.000 $900.000 $1,104.540 $1,600.000 $1,417.500 $1,100.000 $1,458.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 3.000 $6,900.000 $8,173.570 $8,800.000 $7,875.000 $8,140.000 $8,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 121.000 $850.000 $607.490 $840.000 $745.500 $720.000 $766.800
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 7.000 $1,050.000 $1,104.540 $1,000.000 $892.500 $860.000 $918.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 22.000 $900.000 $684.810 $900.000 $798.000 $770.000 $820.800
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 10.000 $975.000 $1,159.760 $1,300.000 $1,155.000 $1,150.000 $1,188.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $550.000 $607.490 $550.000 $472.500 $460.000 $486.000
REMOVE SM RD SN SUP&AM
EA 110.000 $100.000 $120.390 $110.000 $150.000 $92.000 $90.880
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 212.000 $36.000 $33.140 $30.000 $39.900 $21.000 $41.040
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 72.000 $150.000 $138.070 $120.000 $105.000 $105.000 $108.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 30,038.000 $0.250 $0.170 $0.150 $0.160 $0.140 $0.160
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 5,844.000 $0.700 $0.450 $0.410 $0.420 $0.220 $0.430
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,211,074.000 $0.150 $0.130 $0.130 $0.130 $0.130 $0.130
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 350.000 $0.250 $2.250 $2.100 $2.100 $0.220 $2.160
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 16,812.000 $0.400 $0.340 $0.310 $0.320 $0.220 $0.320
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,256,023.000 $0.150 $0.130 $0.130 $0.130 $0.140 $0.130
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 914.000 $3.500 $5.630 $5.200 $5.250 $3.400 $5.400
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 37,336.000 $3.650 $3.940 $3.600 $3.680 $3.400 $3.780
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 64,320.000 $0.600 $0.730 $0.700 $0.680 $0.700 $0.700
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 2,120.000 $11.000 $5.070 $4.600 $4.730 $16.000 $4.860
WK ZN PAV MRK REMOV (W)(ARROW)
EA 41.000 $175.000 $118.300 $110.000 $110.250 $500.000 $113.400
WK ZN PAV MRK REMOV (W)(WORD)
EA 41.000 $230.000 $118.300 $110.000 $110.250 $700.000 $113.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 241,470.000 $0.600 $0.730 $0.700 $0.680 $0.600 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 31,947.000 $1.100 $2.210 $0.800 $1.990 $1.200 $3.130
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 15,814.000 $1.500 $2.210 $1.300 $1.990 $1.200 $3.090
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 5,794.000 $1.000 $1.130 $1.100 $1.050 $0.500 $1.080
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 488.000 $1.000 $2.250 $2.100 $2.100 $0.800 $2.160
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,264.000 $1.000 $0.850 $0.800 $0.790 $0.800 $0.810
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 209.000 $10.000 $13.520 $12.500 $12.600 $9.500 $12.960
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 335.000 $3.500 $5.630 $5.100 $5.250 $4.600 $5.400
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 30,437.000 $0.500 $0.430 $0.400 $0.400 $0.450 $0.410
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 282,607.000 $0.500 $0.430 $0.400 $0.400 $0.450 $0.410
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 319,675.000 $0.450 $0.430 $0.400 $0.400 $0.450 $0.410
PREFAB PAV MRK TY C (W) (ARROW)
EA 41.000 $260.000 $315.470 $300.000 $294.000 $260.000 $302.400
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 36.000 $625.000 $675.990 $625.000 $630.000 $700.000 $648.000
PREFAB PAV MRK TY C (W) (WORD)
EA 41.000 $335.000 $360.530 $330.000 $336.000 $390.000 $345.600
REFL PAV MRKR TY I-C
EA 2,336.000 $3.500 $3.100 $3.000 $2.890 $3.200 $2.970
REFL PAV MRKR TY II-A-A
EA 7,614.000 $3.500 $3.100 $3.000 $2.890 $3.200 $2.970
ELIM EXT PAV MRK & MRKS (4")
LF 1,083,073.000 $0.500 $0.420 $0.400 $0.390 $0.600 $0.400
LITTER REMOVAL
CYC 12.000 $3,110.000 $4,500.000 $2,500.000 $16,800.000 $400.000 $6,908.490
SP MIXES SP-B SAC-B PG70-22
TON 282,781.000 $80.000 $82.000 $71.000 $78.500 $86.000 $102.210
SP MIXES SP-C SAC-B PG70-22
TON 1,601.000 $106.000 $178.300 $136.200 $225.000 $140.000 $184.450
TACK COAT
GAL 101,502.000 $3.000 $3.550 $2.800 $3.480 $3.500 $6.300
BONDING COURSE
GAL 99,064.000 $4.000 $2.750 $3.500 $2.150 $3.500 $5.180
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $14,000.000 $20,000.000 $30,000.000 $16,500.000 $9,900.000 $19,873.260
TMA (STATIONARY)
DAY 1,148.000 $120.000 $257.110 $160.000 $130.000 $132.000 $236.950
TMA (MOBILE OPERATION)
DAY 182.000 $254.000 $848.630 $400.000 $262.500 $132.000 $474.200
1
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 2,893.000 $54.000 $0.000 $50.000 $0.000 $40.000 $64.800
2
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 117.000 $75.000 $0.000 $70.000 $0.000 $50.000 $75.600
3
THERMOPLASTIC PIPE(30 IN)(PP)(TYPE III)
LF 235.000 $110.000 $0.000 $80.000 $0.000 $75.000 $86.400
Totals: $65,560,868.950 $58,528,500.770 $61,109,824.830 $62,841,143.230 $68,392,873.860 $74,127,020.190