Job Info for 0003-05-055

County: REEVES Highway: IH 20 Date: 02/01/2023 (1 year ago) Engineer's Estimate: $60,513,367 Control Number: 0003-05-055
Project: C 3-5-55 District: ODESSA Time: 466 WORKING DAYS Type: HIGHWAY IMPROVEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Rev 1 | Rev 2 | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $60,513,367.44
FNF CONSTRUCTION, INC.   $56,142,249.00 1
-7.22% | -$4,371,118.44
KIEWIT INFRASTRUCTURE SOUTH CO.   $63,521,090.87 2
4.97% | $3,007,723.43
13.14% | $7,378,841.87
DAN WILLIAMS COMPANY   $64,675,733.17 3
6.88% | $4,162,365.73
15.2% | $8,533,484.17
1.82% | $1,154,642.30
Subcontractor Percentage Amount
WILD WEST TRUCKING, LLC 6.48% $3,638,017.74
JB PINNACLE GROUP, LLC 4.30% $2,414,116.71
HJC FARMS, INC. 3.08% $1,729,181.27
PEYSON TRANSPORT, LLC 2.40% $1,347,413.98
DUSTROL, INC. 1.95% $1,094,773.86
SCR CIVIL CONSTRUCTION, LLC 1.75% $982,489.36
TRP CONSTRUCTION GROUP, LLC 1.52% $853,362.18
MAKIN" IT MOVE TRANSPORT,LLC 0.72% $404,224.19
FC TRAFFIC CONTROL, INC. 0.66% $370,538.84
BARRICADES UNLIMITED 0.44% $247,025.90
V-TECH ENVIROMENTAL SERVICES 0.20% $112,284.50
S&S BRIDGE PAINTING 0.10% $56,142.25
TEXAS CUTTING & CORING GP, INC. 0.06% $33,685.35
WEST TEXAS ROCK RESOURCES, LLC 0.05% $28,071.12
ENVIRONEER, LLC 0.00% $0.00
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 0.00% $0.00
Total: 23.71% $13,311,327.25

Bid Items

Items: 78, 0 filtered
REEVES IH 20  |  ODESSA  |  0003-05-055  |  02/01/2023  |  $60,513,367  |  C 3-5-55  |  HWY IMPRV  |  466 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FNF CONSTRUCTION, INC. KIEWIT INFRASTRUCTURE SOUTH CO. DAN WILLIAMS COMPANY
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY 103,646.000 $6.110 $5.900 $8.000 $6.000
105 6041 REMOVING STAB BASE AND ASPH PAV(8") SY 306,407.000 $8.000 $8.000 $11.000 $6.500
134 6002 BACKFILL (TY B) STA 1,725.000 $325.000 $115.000 $75.360 $375.000
150 6002 BLADING HR 130.000 $175.000 $350.000 $328.680 $150.000
216 6001 PROOF ROLLING HR 130.000 $150.000 $120.000 $245.620 $72.000
251 6079 REWORK BS MTL (TY D)(SURF)(ORD COMP) SY 410,053.000 $1.500 $1.350 $3.980 $0.750
310 6005 PRIME COAT (AE-P) GAL 82,019.000 $4.950 $5.100 $6.590 $6.500
315 6004 FOG SEAL (CSS-1H) GAL 146,331.000 $5.000 $4.750 $5.420 $6.000
316 6017 ASPH (AC-20-5TR) GAL 292,655.000 $4.900 $4.750 $4.770 $5.750
316 6126 AGGR(TY-PB GR-4 SAC-A) CY 6,660.000 $150.000 $165.000 $146.460 $130.000
354 6045 PLANE ASPH CONC PAV (2") SY 731,618.000 $5.700 $2.500 $3.000 $2.500
416 6016 DRILL SHAFT (SIGN MTS) (12 IN) LF 144.000 $138.410 $160.000 $78.640 $62.000
416 6018 DRILL SHAFT (SIGN MTS) (24 IN) LF 120.000 $273.280 $207.000 $149.670 $118.000
429 6008 CONC STR REPR(RAPID VERT AND OVERHEAD) SF 2,233.000 $206.270 $365.000 $376.710 $160.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 616.000 $577.310 $740.000 $1,090.820 $800.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 1,228.000 $38.090 $55.000 $53.270 $33.500
451 6025 RETROFIT RAIL (TY SSTR)(HPC) LF 7,558.000 $255.000 $440.000 $374.180 $185.000
454 6009 JOINT SEALANT LF 3,420.000 $13.000 $55.000 $53.270 $32.000
500 6001 MOBILIZATION LS 1.000 $5,393,970.910 $5,616,000.000 $5,757,132.950 $3,000,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 24.000 $15,000.000 $88,000.000 $63,820.520 $25,000.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 10,000.000 $8.540 $12.000 $10.780 $7.650
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 10,000.000 $1.730 $2.050 $2.540 $2.300
512 6089 PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL) LF 18,570.000 $48.000 $54.200 $29.840 $80.000
512 6090 PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL) LF 18,570.000 $11.000 $4.000 $9.070 $5.000
512 6091 PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL) LF 18,570.000 $16.000 $7.300 $4.400 $7.600
533 6001 RUMBLE STRIPS (SHOULDER) LF 337,364.000 $0.200 $0.200 $0.130 $0.100
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 11,012.000 $37.410 $34.000 $41.220 $36.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 58.000 $2,702.490 $3,000.000 $3,316.850 $3,200.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 32.000 $1,413.870 $1,600.000 $1,477.680 $1,200.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 2.000 $3,200.000 $1,350.000 $1,287.420 $1,100.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 11,012.000 $2.560 $4.000 $2.350 $2.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 40.000 $252.060 $400.000 $228.310 $250.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 44.000 $3,780.000 $3,500.000 $3,786.160 $3,400.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 40.000 $273.130 $400.000 $272.710 $250.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 18.000 $1,800.000 $1,000.000 $1,737.700 $700.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 18.000 $1,100.000 $1,000.000 $824.460 $800.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 18.000 $8,000.000 $15,000.000 $10,229.610 $11,000.000
636 6002 ALUMINUM SIGNS (TY G) SF 1,870.000 $34.040 $32.000 $36.150 $30.000
636 6003 ALUMINUM SIGNS (TY O) SF 1,347.000 $32.800 $32.000 $42.430 $35.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 66.000 $900.000 $1,200.000 $843.480 $700.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 44.000 $1,000.000 $1,500.000 $1,147.900 $1,000.000
644 6076 REMOVE SM RD SN SUP&AM EA 110.000 $158.560 $140.000 $93.860 $95.000
647 6001 INSTALL LRSS (STRUCT STEEL) LB 13,314.000 $10.000 $8.250 $6.530 $6.000
647 6003 REMOVE LRSA EA 40.000 $1,577.170 $2,500.000 $754.700 $650.000
658 6015 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 73.000 $85.000 $21.000 $31.390 $25.000
658 6028 INSTL DEL ASSM (D-SY)SZ (BRF)GF1 EA 60.000 $45.000 $21.000 $31.390 $25.000
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 913.000 $35.000 $17.000 $11.420 $10.000
658 6080 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND EA 350.000 $100.000 $130.000 $107.180 $85.000
658 6086 INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND EA 238.000 $92.030 $130.000 $107.180 $85.000
658 6092 INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND EA 158.000 $147.000 $130.000 $109.080 $90.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 48.000 $83.000 $130.000 $110.350 $90.000
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 42,200.000 $0.980 $0.700 $0.630 $0.500
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 168,682.000 $1.170 $0.650 $0.610 $0.480
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 168,682.000 $1.140 $0.650 $0.610 $0.480
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 12,654.000 $1.710 $1.000 $2.540 $2.500
666 6033 REFL PAV MRK TY I (W)8"(LNDP)(100MIL) LF 1,400.000 $1.840 $2.000 $2.540 $2.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 16,994.000 $1.150 $1.100 $1.400 $1.100
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 171.000 $5.350 $14.150 $17.760 $14.000
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 21.000 $35.540 $76.000 $95.130 $75.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 45,993.000 $0.800 $0.900 $1.080 $0.850
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 192,588.000 $0.800 $0.800 $1.000 $0.800
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 127.000 $0.880 $2.450 $3.040 $2.400
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 173,289.000 $0.750 $0.800 $1.000 $0.800
672 6009 REFL PAV MRKR TY II-A-A EA 63.000 $4.010 $11.750 $14.590 $11.500
672 6010 REFL PAV MRKR TY II-C-R EA 2,395.000 $3.340 $6.600 $8.240 $6.500
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 365,458.000 $0.820 $1.000 $0.890 $0.700
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 18,394.000 $1.500 $2.000 $1.780 $1.400
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 182.000 $110.000 $275.000 $215.630 $70.000
784 6010 REP STL BRIDGE MEMBER (BEARINGS) EA 2.000 $9,500.000 $3,000.000 $2,283.110 $200.000
3077 6007 SP MIXES SP-B SAC-B PG70-22 TON 169,032.000 $125.000 $109.000 $128.110 $170.500
3080 6021 STONE-MTRX-ASPH SMAR-F SAC-A TON 80,487.000 $160.000 $129.000 $160.000 $177.000
3084 6001 BONDING COURSE GAL 41,014.000 $3.650 $8.000 $4.000 $12.000
4211 6001 STEEL BRIDGE ZONE PAINTING REF STR 1 EA 3.000 $10,000.000 $30,000.000 $25,367.910 $275,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $12,152.710 $8,000.000 $28,364.680 $15,000.000
6079 6002 AUTO PORT SMRT TRF MONITOR SYS (PLAN 1) DAY 1,404.000 $600.000 $210.000 $205.960 $155.000
6158 6001 TMSP RADAR SPEED CONTROL MONITOR EA 4.000 $11,500.000 $18,000.000 $17,757.540 $12,000.000
6185 6002 TMA (STATIONARY) DAY 476.000 $222.610 $190.000 $654.740 $350.000
6185 6003 TMA (MOBILE OPERATION) HR 3,408.000 $82.800 $70.000 $119.090 $66.500
Totals: $60,513,367.44 $56,142,249.00 $63,521,090.87 $64,675,733.17