Job Info for 0077-01-029

County: REAGAN Highway: US 67 Date: 03/06/2018 (6 years ago) Engineer's Estimate: $7,686,245 Control Number: 0077-01-029
Project: STP 2018(602) District: SAN ANGELO Time: 131 WORKING DAYS Type: ACP OVERLAY AND SAFETY TREAT FIXED OBJECTS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,686,244.82
JONES BROS. DIRT & PAVING CONTRACTORS, INC.   $6,531,381.35 1
-15.03% | -$1,154,863.47
REECE ALBERT, INC.   $7,086,516.12 2
-7.8% | -$599,728.70
8.5% | $555,134.77
RK HALL, LLC   $8,471,497.76 3
10.22% | $785,252.94
29.7% | $1,940,116.41
19.54% | $1,384,981.64
DELHUR INDUSTRIES, INC.   $9,228,030.57 4
20.06% | $1,541,785.75
41.29% | $2,696,649.22
8.93% | $756,532.81
GILVIN-TERRILL, LTD.   $10,598,544.21 5
37.89% | $2,912,299.39
62.27% | $4,067,162.86
14.85% | $1,370,513.64

Bid Items

Items: 57, 0 filtered
REAGAN US 67  |  SAN ANGELO  |  0077-01-029  |  03/06/2018  |  $7,686,245  |  STP 2018(602)  |  ACP OVERLAY AND SAFETY TREAT FIXED OBJECTS  |  131 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate JONES BROS. DIRT & PAVING CONTRACTORS, INC. REECE ALBERT, INC. RK HALL, LLC DELHUR INDUSTRIES, INC. GILVIN-TERRILL, LTD.
110 6001 EXCAVATION (ROADWAY) CY 6,452.000 $30.000 $13.600 $1.430 $4.240 $7.560 $7.000
132 6002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 5,726.000 $35.000 $20.750 $6.210 $7.950 $4.100 $11.000
134 6004 BACKFILL (TY A OR B) STA 548.100 $110.000 $280.000 $118.790 $144.210 $223.430 $37.000
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 4.020 $900.000 $787.500 $1,302.280 $1,427.920 $1,427.920 $2,800.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 8,894.000 $45.000 $38.750 $31.010 $45.850 $49.430 $42.000
310 6001 PRIME COAT (MULTI OPTION) GAL 12,675.000 $3.600 $3.800 $3.930 $4.130 $3.360 $8.500
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 1,490.000 $3.000 $5.900 $3.570 $4.260 $3.360 $28.500
316 6240 AGGR(TY-PD GR-4 SAC-B) CY 503.000 $90.000 $101.500 $113.330 $236.320 $90.460 $150.000
316 6419 ASPH (AC-15P, AC-20-5TR OR AC-20XP) GAL 25,349.000 $2.750 $2.800 $2.420 $2.870 $2.920 $6.600
344 6048 SUPERPAVE MIXTURES SP-C SAC-B PG70-22 TON 76,171.000 $70.000 $62.000 $74.760 $87.910 $88.980 $105.000
354 6022 PLANE ASPH CONC PAV(0" TO 3") SY 16,299.000 $2.000 $1.350 $1.570 $1.210 $1.890 $2.000
354 6045 PLANE ASPH CONC PAV (2") SY 32,704.000 $1.750 $1.350 $1.690 $1.420 $1.790 $2.000
400 6005 CEM STABIL BKFL CY 65.100 $200.000 $184.020 $316.400 $302.500 $376.200 $350.000
420 6074 CL C CONC (MISC) CY 2.000 $650.000 $1,082.480 $1,590.090 $2,200.000 $5,131.500 $2,000.000
432 6001 RIPRAP (CONC)(4 IN) CY 1.900 $650.000 $811.850 $2,075.700 $880.000 $1,400.300 $2,000.000
464 6032 RC PIPE (ARCH)(CL III)(DES 3) LF 342.000 $250.000 $189.430 $166.810 $275.000 $222.200 $145.000
467 6122 SET (TY I)(S=3 FT)(HW= 6 FT)(4:1)(C) EA 6.000 $8,200.000 $2,706.190 $5,645.920 $6,105.000 $11,308.000 $7,300.000
467 6544 SET (TY II) (DES 3) (RCP) (6: 1) (C) EA 8.000 $2,000.000 $3,247.420 $1,739.960 $4,400.000 $5,918.000 $3,085.000
496 6007 REMOV STR (PIPE) LF 194.000 $30.000 $27.060 $11.850 $16.500 $17.710 $100.000
500 6001 MOBILIZATION LS 1.000 $581,318.000 $325,000.000 $145,928.000 $198,546.660 $849,971.440 $895,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $11,000.000 $7,000.000 $17,377.130 $15,000.000 $10,385.970 $15,000.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 138.000 $12.000 $10.500 $12.520 $7.710 $15.460 $15.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 138.000 $2.000 $6.300 $3.160 $1.660 $4.690 $5.000
530 6002 INTERSECTIONS (ACP) SY 1,043.000 $65.000 $57.750 $51.120 $63.910 $80.690 $54.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 105,718.000 $0.200 $0.130 $0.160 $0.130 $0.070 $0.150
533 6002 RUMBLE STRIPS (CENTERLINE) LF 54,809.000 $0.200 $0.190 $0.160 $0.200 $0.070 $0.170
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 2,500.000 $26.000 $24.680 $23.070 $25.300 $25.300 $24.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,000.000 $3.000 $2.630 $5.020 $5.500 $5.500 $5.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $2,400.000 $2,467.500 $3,009.640 $3,300.000 $3,300.000 $3,000.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 8.000 $650.000 $1,260.000 $1,203.860 $1,320.000 $1,320.000 $1,200.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 5.000 $645.000 $1,050.000 $1,003.210 $1,100.000 $1,100.000 $1,000.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 104.000 $25.000 $31.500 $20.060 $22.000 $22.000 $20.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 6.000 $150.000 $141.750 $135.430 $148.500 $148.500 $135.000
662 6077 WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR) LF 8,154.000 $0.900 $0.890 $0.850 $0.940 $0.940 $0.850
662 6104 WK ZN PAV MRK REMOV (Y)4"(SLD W/MRKR) LF 10,600.000 $0.900 $0.890 $0.850 $0.940 $0.940 $0.850
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 5,147.000 $1.200 $1.000 $1.300 $2.220 $1.560 $1.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 8,264.000 $1.200 $1.000 $1.330 $2.220 $1.600 $1.000
666 6005 REFL PAV MRK TY I (W)4"(DOT)(090MIL) LF 676.000 $2.000 $0.260 $0.250 $0.280 $0.280 $0.250
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 2,549.000 $0.750 $0.530 $0.500 $0.550 $0.550 $0.500
666 6047 REFL PAV MRK TY I (W)24"(SLD)(090MIL) LF 1,302.000 $10.000 $6.830 $6.520 $7.150 $7.150 $6.500
666 6053 REFL PAV MRK TY I (W)(ARROW)(090MIL) EA 4.000 $250.000 $99.750 $95.310 $104.500 $104.500 $95.000
666 6071 REFL PAV MRK TY I(W)(LNDP ARW)(090MIL) EA 2.000 $250.000 $420.000 $401.290 $440.000 $440.000 $400.000
666 6077 REFL PAV MRK TY I (W)(WORD)(090MIL) EA 4.000 $250.000 $131.250 $125.400 $137.500 $137.500 $125.000
666 6101 REF PAV MRK TY I(W)36"(YLD TRI)(090MIL) EA 7.000 $80.000 $10.500 $10.030 $11.000 $11.000 $10.000
666 6167 REFL PAV MRK TY II (W) 4" (BRK) LF 14,268.000 $0.150 $0.130 $0.120 $0.130 $0.130 $1.000
666 6170 REFL PAV MRK TY II (W) 4" (SLD) LF 107,700.000 $0.150 $0.130 $0.120 $0.130 $0.130 $0.120
666 6178 REFL PAV MRK TY II (W) 8" (SLD) LF 2,549.000 $0.300 $0.250 $0.240 $0.260 $0.260 $1.000
666 6205 REFL PAV MRK TY II (Y) 4" (BRK) LF 7,650.000 $0.150 $0.130 $0.120 $0.130 $0.130 $1.000
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 112,204.000 $0.200 $0.130 $0.120 $0.130 $0.130 $0.120
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 14,386.000 $0.340 $0.260 $0.250 $0.280 $0.280 $1.000
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 107,700.000 $0.320 $0.260 $0.250 $0.280 $0.280 $0.250
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 7,650.000 $0.260 $0.260 $0.250 $0.280 $0.280 $1.000
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 112,274.000 $0.320 $0.260 $0.250 $0.280 $0.280 $0.250
672 6007 REFL PAV MRKR TY I-C EA 698.000 $3.500 $3.150 $3.010 $3.300 $3.300 $3.000
672 6009 REFL PAV MRKR TY II-A-A EA 2,200.000 $3.500 $3.150 $3.010 $3.300 $3.300 $3.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 18,754.000 $0.500 $0.680 $0.650 $0.720 $0.720 $1.000
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 330.000 $55.000 $13.300 $7.350 $14.500 $36.000 $125.000
Totals: $7,686,244.82 $6,531,381.36 $7,086,516.13 $8,471,497.77 $9,228,030.58 $10,598,544.21