|
|
|
PREPARING ROW
|
AC
|
15.730
|
$200.000
|
$615.000
|
$120.000
|
$177.470
|
$310.680
|
|
|
|
REMOVING CONC (CTB)
|
LF
|
9,135.000
|
$21.000
|
$6.500
|
$23.500
|
$16.180
|
$10.430
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
196.000
|
$21.000
|
$14.250
|
$25.000
|
$21.920
|
$14.950
|
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
36.530
|
$1,000.000
|
$1,100.000
|
$420.000
|
$1,061.420
|
$676.130
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
2,018.000
|
$10.000
|
$10.400
|
$36.000
|
$35.440
|
$14.510
|
|
|
|
BACKFILL (TY A)
|
STA
|
702.830
|
$160.000
|
$165.000
|
$185.000
|
$192.950
|
$109.360
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
2.290
|
$600.000
|
$930.000
|
$940.000
|
$971.300
|
$1,084.030
|
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
15.730
|
$500.000
|
$300.000
|
$310.000
|
$319.000
|
$650.420
|
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(6")
|
SY
|
8,168.000
|
$16.000
|
$11.300
|
$16.000
|
$16.200
|
$10.060
|
|
|
|
REWORK BS MTL (TY B)(18")(DENS CONT)
|
SY
|
3,751.000
|
$16.000
|
$19.600
|
$21.000
|
$26.200
|
$36.040
|
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
176.000
|
$165.000
|
$215.000
|
$215.000
|
$278.950
|
$233.110
|
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
8,168.000
|
$3.500
|
$4.750
|
$5.250
|
$6.410
|
$4.780
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,042.000
|
$3.500
|
$4.300
|
$4.850
|
$5.980
|
$4.220
|
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
793.000
|
$3.000
|
$5.900
|
$6.000
|
$3.970
|
$5.030
|
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
3,966.200
|
$3.750
|
$3.750
|
$4.100
|
$3.970
|
$4.410
|
|
|
|
ASPH (AC-10)
|
GAL
|
3,104.000
|
$5.000
|
$3.450
|
$3.850
|
$4.590
|
$3.640
|
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
74.000
|
$150.000
|
$177.000
|
$210.000
|
$424.570
|
$447.950
|
|
|
|
D-GR HMA TY-B PG64-28
|
TON
|
2,659.000
|
$72.000
|
$100.000
|
$105.000
|
$128.000
|
$0.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG64-28
|
TON
|
12,617.000
|
$72.000
|
$101.000
|
$99.450
|
$123.280
|
$102.070
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
37,251.000
|
$83.000
|
$98.850
|
$105.750
|
$116.140
|
$0.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,726.000
|
$55.000
|
$44.100
|
$53.500
|
$53.140
|
$34.790
|
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
19,668.000
|
$2.500
|
$2.750
|
$2.800
|
$2.750
|
$1.800
|
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
234.000
|
$2.000
|
$8.150
|
$8.700
|
$11.000
|
$10.760
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
20,416.000
|
$2.000
|
$2.900
|
$3.600
|
$2.750
|
$0.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,636.000
|
$2.000
|
$9.100
|
$3.250
|
$8.800
|
$0.000
|
|
|
|
PLAN & TEXT ASPH CONC PAV (2")
|
SY
|
24,455.000
|
$2.750
|
$2.750
|
$2.700
|
$1.650
|
$1.890
|
|
|
|
HIR (RECYCLING AGENT)
|
GAL
|
78,880.000
|
$4.750
|
$3.050
|
$3.100
|
$3.190
|
$0.000
|
|
|
|
HIR (SURFACE)(2.5")
|
SY
|
157,760.000
|
$6.000
|
$4.650
|
$4.700
|
$4.840
|
$0.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
32.000
|
$250.000
|
$342.500
|
$215.000
|
$357.500
|
$352.310
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
301.000
|
$425.000
|
$540.000
|
$650.000
|
$645.010
|
$371.610
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
43.000
|
$450.000
|
$434.000
|
$480.000
|
$453.200
|
$505.040
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
294.000
|
$450.000
|
$440.000
|
$690.000
|
$458.700
|
$379.300
|
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
310.000
|
$20.000
|
$51.000
|
$48.500
|
$52.800
|
$49.320
|
|
|
|
RAIL (TY SSTR)
|
LF
|
1,072.000
|
$52.000
|
$60.000
|
$64.000
|
$62.210
|
$62.400
|
|
|
|
RAIL (TY T223) (MOD)
|
LF
|
1,079.000
|
$260.000
|
$101.850
|
$160.000
|
$106.320
|
$105.860
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
58.000
|
$400.000
|
$769.250
|
$720.000
|
$803.000
|
$720.880
|
|
|
|
JOINT SEALANT
|
LF
|
342.000
|
$25.000
|
$31.600
|
$45.000
|
$33.000
|
$38.480
|
|
|
|
SHOT BLASTING
|
SY
|
38.000
|
$10.000
|
$265.000
|
$96.000
|
$275.000
|
$70.460
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$866,900.000
|
$770,000.000
|
$922,638.610
|
$464,559.070
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$18,000.000
|
$15,770.000
|
$31,000.000
|
$6,549.130
|
$7,971.690
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
75.000
|
$3.000
|
$9.700
|
$8.500
|
$16.500
|
$5.420
|
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
10,800.000
|
$9.000
|
$5.250
|
$10.000
|
$16.500
|
$7.730
|
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
10,800.000
|
$7.000
|
$5.250
|
$9.450
|
$13.750
|
$8.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
7,747.000
|
$195.000
|
$95.600
|
$140.000
|
$95.470
|
$94.690
|
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
200.000
|
$130.000
|
$212.000
|
$295.000
|
$221.320
|
$223.980
|
|
|
|
PERM CONC TRF BARR (SGL SLP) (TY 1 SPL)
|
LF
|
807.000
|
$200.000
|
$94.600
|
$140.000
|
$98.730
|
$105.870
|
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
270.000
|
$200.000
|
$209.700
|
$425.000
|
$218.900
|
$220.070
|
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
26.000
|
$25.000
|
$51.650
|
$42.500
|
$53.900
|
$69.890
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
123,241.000
|
$0.200
|
$0.100
|
$0.190
|
$0.200
|
$0.210
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
45,419.000
|
$0.200
|
$0.260
|
$0.270
|
$0.280
|
$0.220
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
7,625.000
|
$25.000
|
$26.850
|
$27.000
|
$28.050
|
$26.020
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,800.000
|
$2,475.000
|
$2,500.000
|
$2,585.000
|
$1,839.120
|
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
4.000
|
$700.000
|
$895.000
|
$905.000
|
$935.000
|
$1,221.230
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
$1,567.500
|
$1,078.610
|
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$875.000
|
$870.000
|
$880.000
|
$907.500
|
$921.430
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
9,725.000
|
$3.000
|
$3.700
|
$3.750
|
$3.850
|
$1.900
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$212.000
|
$370.000
|
$375.000
|
$385.000
|
$162.610
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,550.000
|
$3,475.000
|
$3,500.000
|
$3,630.000
|
$2,655.800
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$275.000
|
$370.000
|
$375.000
|
$385.000
|
$216.810
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$12,000.000
|
$12,645.000
|
$13,000.000
|
$13,200.000
|
$9,236.420
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,100.000
|
$2,100.000
|
$2,100.000
|
$2,200.000
|
$1,042.400
|
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$710.000
|
$1,055.000
|
$1,100.000
|
$1,100.000
|
$1,084.030
|
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
4.000
|
$3,600.000
|
$5,595.000
|
$4,300.000
|
$5,841.000
|
$5,756.210
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
550.000
|
$8.000
|
$8.450
|
$5.300
|
$8.800
|
$8.670
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
30.000
|
$8.000
|
$12.650
|
$6.400
|
$13.200
|
$13.010
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
80.000
|
$21.000
|
$31.600
|
$20.000
|
$33.000
|
$32.520
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
740.000
|
$1.500
|
$1.700
|
$1.600
|
$1.760
|
$1.730
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,480.000
|
$1.800
|
$1.800
|
$2.150
|
$1.870
|
$1.840
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$900.000
|
$1,265.000
|
$800.000
|
$1,320.000
|
$1,300.840
|
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$230.000
|
$210.750
|
$320.000
|
$220.000
|
$216.810
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$750.000
|
$1,055.000
|
$830.000
|
$1,100.000
|
$845.540
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$115.000
|
$105.000
|
$105.000
|
$110.000
|
$81.160
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
82.000
|
$88.000
|
$158.000
|
$120.000
|
$165.000
|
$70.460
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
121.000
|
$110.000
|
$158.000
|
$120.000
|
$165.000
|
$75.880
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$25.000
|
$21.000
|
$32.000
|
$22.000
|
$21.680
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
30.000
|
$80.000
|
$158.000
|
$120.000
|
$165.000
|
$70.460
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
59.000
|
$25.000
|
$21.000
|
$32.000
|
$22.000
|
$75.880
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
156.000
|
$123.000
|
$158.000
|
$120.000
|
$165.000
|
$70.460
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
232.000
|
$110.000
|
$158.000
|
$120.000
|
$165.000
|
$75.880
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
719.000
|
$12.000
|
$16.000
|
$19.000
|
$16.500
|
$3.250
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
70.000
|
$30.000
|
$37.000
|
$32.000
|
$38.500
|
$21.680
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$36.000
|
$37.000
|
$32.000
|
$38.500
|
$23.850
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
8,600.000
|
$0.350
|
$0.340
|
$0.340
|
$0.350
|
$0.350
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
23,330.000
|
$0.350
|
$0.340
|
$0.340
|
$0.350
|
$0.350
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,000.000
|
$0.800
|
$0.900
|
$0.900
|
$0.940
|
$0.920
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,000.000
|
$0.800
|
$0.900
|
$0.900
|
$0.940
|
$0.920
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,968.000
|
$0.900
|
$1.100
|
$1.300
|
$1.020
|
$1.030
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,326.000
|
$0.900
|
$1.150
|
$1.300
|
$1.020
|
$1.070
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
11,681.000
|
$0.700
|
$0.650
|
$0.670
|
$0.680
|
$0.670
|
|
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
272.000
|
$1.700
|
$2.110
|
$2.150
|
$2.200
|
$2.170
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
1,513.000
|
$2.650
|
$2.110
|
$2.150
|
$2.200
|
$2.170
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
176.000
|
$8.000
|
$7.400
|
$7.450
|
$7.700
|
$7.590
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
20.000
|
$125.000
|
$131.750
|
$135.000
|
$137.500
|
$135.500
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
18.000
|
$200.000
|
$184.400
|
$185.000
|
$192.500
|
$189.710
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
4.000
|
$36.000
|
$42.150
|
$42.500
|
$44.000
|
$43.360
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
8,510.000
|
$0.300
|
$0.330
|
$0.330
|
$0.340
|
$0.340
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
143,716.000
|
$0.300
|
$0.330
|
$0.330
|
$0.340
|
$0.340
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
7,480.000
|
$0.300
|
$0.330
|
$0.330
|
$0.340
|
$0.340
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
103,837.000
|
$0.300
|
$0.330
|
$0.330
|
$0.340
|
$0.340
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,256.000
|
$3.000
|
$3.150
|
$3.200
|
$3.300
|
$3.250
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
761.000
|
$3.000
|
$3.150
|
$3.200
|
$3.300
|
$3.250
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
28,600.000
|
$0.750
|
$1.000
|
$1.000
|
$1.050
|
$1.030
|
|
|
|
REMOVAL OF CABLES
|
LF
|
710.000
|
$0.750
|
$0.300
|
$1.050
|
$0.280
|
$0.270
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,000.000
|
$14,580.000
|
$13,500.000
|
$5,448.310
|
$10,840.310
|
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$200.000
|
$634.000
|
$275.000
|
$429.920
|
$364.080
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$45.000
|
$63.400
|
$105.000
|
$73.110
|
$100.450
|
|
1
|
|
D-GR HMA TY-B PG64-28
|
TON
|
24,350.000
|
$72.000
|
$0.000
|
$0.000
|
$0.000
|
$121.450
|
|
1
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG76-28
|
TON
|
27,986.000
|
$88.190
|
$0.000
|
$0.000
|
$0.000
|
$140.700
|
|
1
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
2,636.000
|
$1.500
|
$0.000
|
$0.000
|
$0.000
|
$2.000
|
|
1
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
20,416.000
|
$1.500
|
$0.000
|
$0.000
|
$0.000
|
$1.900
|
|
1
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
157,760.000
|
$2.500
|
$0.000
|
$0.000
|
$0.000
|
$3.030
|
|
Totals: |
$15,718,012.690
|
$10,708,977.980
|
$11,864,138.750
|
$12,269,629.125
|
$12,477,687.171
|