REMOVING CONCRETE(MOW STRIP)
|
LF
|
5,775.000
|
$16.000
|
$12.000
|
$17.870
|
|
|
BLADING
|
HR
|
40.000
|
$100.000
|
$430.000
|
$297.570
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
1.730
|
$2,000.000
|
$1,400.000
|
$1,437.500
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
1.730
|
$2,000.000
|
$1,400.000
|
$1,437.500
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
837.000
|
$5.000
|
$6.000
|
$6.510
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
207,514.000
|
$2.500
|
$2.650
|
$2.810
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
21.000
|
$400.000
|
$540.000
|
$166.600
|
|
|
FLOWABLE BACKFILL
|
CY
|
21.000
|
$460.000
|
$490.000
|
$434.260
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
14.000
|
$300.000
|
$150.000
|
$155.250
|
|
|
CL S CONC (JUNCTION BOX)
|
CY
|
14.400
|
$2,500.000
|
$1,578.000
|
$1,627.100
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.800
|
$625.000
|
$720.000
|
$745.540
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
596.050
|
$425.000
|
$554.650
|
$747.500
|
|
|
RAIL (TY SSTR)
|
LF
|
150.000
|
$100.000
|
$176.350
|
$182.820
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
24.000
|
$500.000
|
$354.000
|
$367.830
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
16.000
|
$150.000
|
$102.000
|
$477.030
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
30.000
|
$250.000
|
$225.000
|
$336.210
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
112.000
|
$125.000
|
$290.000
|
$339.750
|
|
|
INLET (COMPL)(TY A)
|
EA
|
2.000
|
$6,800.000
|
$5,535.000
|
$6,454.430
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
1.000
|
$5,000.000
|
$5,690.000
|
$5,899.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,800.000
|
$3,535.000
|
$5,904.830
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,600.000
|
$3,645.000
|
$5,904.840
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,400.000
|
$1,270.000
|
$3,092.510
|
|
|
REMOV STR (PIPE)
|
LF
|
2.000
|
$25.000
|
$130.000
|
$359.380
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$630,000.000
|
$415,065.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$17,572.500
|
$33,000.000
|
$4,742.980
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
350.000
|
$7.500
|
$11.000
|
$5.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
350.000
|
$2.500
|
$8.300
|
$2.300
|
|
|
TURNOUTS (RAP)
|
SY
|
1,111.000
|
$23.000
|
$11.700
|
$18.200
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
152,022.000
|
$0.100
|
$0.250
|
$0.210
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
8,700.000
|
$30.000
|
$28.300
|
$29.330
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,200.000
|
$2,220.000
|
$2,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
25.000
|
$1,500.000
|
$1,110.000
|
$1,150.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
8,150.000
|
$3.500
|
$3.350
|
$3.450
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
25.000
|
$300.000
|
$335.000
|
$345.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
11,621.000
|
$12.000
|
$10.000
|
$10.350
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
8.000
|
$3,500.000
|
$4,440.000
|
$4,600.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
4,525.000
|
$4.000
|
$5.000
|
$5.180
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
25.000
|
$900.000
|
$555.000
|
$575.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
30.000
|
$2,750.000
|
$3,275.000
|
$3,392.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
29.000
|
$350.000
|
$335.000
|
$345.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$25,000.000
|
$30,500.000
|
$31,625.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
4.000
|
$100.000
|
$31.000
|
$32.200
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
30.000
|
$100.000
|
$33.300
|
$34.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$1,000.000
|
$1,165.000
|
$1,207.500
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,750.000
|
$3,325.000
|
$3,450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$200.000
|
$110.000
|
$115.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
2.000
|
$500.000
|
$445.000
|
$460.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
262.900
|
$10.000
|
$5.550
|
$5.750
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$800.000
|
$1,330.000
|
$1,380.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
57.000
|
$135.000
|
$149.750
|
$155.250
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
21.000
|
$135.000
|
$149.750
|
$155.250
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
78.000
|
$15.000
|
$11.000
|
$11.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,768.000
|
$1.150
|
$1.300
|
$3.470
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
387.000
|
$2.000
|
$0.620
|
$0.640
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
15,672.000
|
$0.800
|
$0.830
|
$0.860
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
2,036.000
|
$4.000
|
$5.550
|
$5.750
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
23,425.000
|
$0.450
|
$0.620
|
$0.640
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
90,010.000
|
$0.400
|
$0.620
|
$0.640
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
90,010.000
|
$0.400
|
$0.620
|
$0.640
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,521.000
|
$4.250
|
$3.880
|
$4.030
|
|
|
FULL - WIDTH MOWING
|
CYC
|
1.000
|
$4,500.000
|
$13,800.000
|
$21,492.740
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
28,533.000
|
$126.000
|
$110.550
|
$133.320
|
|
|
UNDERSEAL COURSE
|
GAL
|
51,880.000
|
$4.500
|
$3.100
|
$4.560
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,000.000
|
$25,100.000
|
$12,513.660
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$500.000
|
$385.000
|
$348.390
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$100.000
|
$85.000
|
$90.910
|
|
Totals: |
$6,459,740.250
|
$6,336,098.658
|
$6,928,012.842
|