RANDALL US 60 (0168-08-075)

Items: 95

County: RANDALL
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0168-08-075
DBE Goal: N/A
Project: F 2024(033)
Guaranty: N/A
Time: 290 WORKING DAYS
Engineer's Estimate: $40,452,689.84
Date: 09/07/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$40,452,689.84
$34,924,133.61
Over/Under Est: -13.67% -$5,528,556.23
$38,421,698.57
Over/Under Est: -5.02% -$2,030,991.27
Amt Left: 10.01% $3,497,564.96
$39,697,800.25
Over/Under Est: -1.87% -$754,889.59
Amt Left: 13.67% $4,773,666.64
Delta: -3.32% -$1,276,101.68
Over/Under Est: -1.24% -$500,104.42
Amt Left: 14.4% $5,028,451.81
Delta: -0.64% -$254,785.17
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 1.98% $695,278.23
PERFORMANCE EQUIPMENT SERVICE 1.76% $618,025.09
TEX OP CONSTRUCTION, LP 1.13% $396,800.20
W. S. CONSTRUCTION COMPANY 1.06% $372,219.66
ALAMO BROTHERS CONCRETE INC 0.90% $316,035.56
TEXAS ROAD RECYCLERS, L.L.C. 0.53% $186,109.83
HJC FARMS, INC. 0.25% $87,787.65
MOBILE ENTERPRISES, INC. 0.20% $70,230.12
FC TRAFFIC CONTROL, INC. 0.19% $66,718.62
SAENZ TRANSPORT, LLC 0.14% $49,161.09
SURFACE PREPARATION TECHNOLOGIES, LLC 0.14% $49,161.09
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.11% $38,626.57
SURFACE PREPARATION TECHNOLOGIES, LLC 0.07% $24,580.54
H & F TRUCKING 0.03% $10,534.52
Total: 8.49% $2,981,268.77

Bid Items & Bid Tabulations

95 Total 0 of 95
RANDALL  |  US 60  |  AMARILLO  |  0168-08-075  |  09/07/2023  |  $40,452,689.84  |  F 2024(033)  |  REHAB EXIST ROADWAY  |  290 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
RK HALL, LLC
J. LEE MILLIGAN, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
AC 36.000 $200.000 $115.000 $192.620 $320.000 $635.360
REMOVING CONC (RIPRAP)
SY 36.000 $100.000 $125.000 $56.390 $85.000 $98.110
REMOVING STAB BASE AND ASPH PAV (6")
SY 99.000 $8.000 $26.500 $46.260 $33.250 $40.470
REMOVING STAB BASE & ASPH PAV (18")
SY 941.000 $20.000 $16.000 $20.750 $21.500 $15.650
SUBGRADE WIDENING (DENS CONT)
STA 9.000 $2,000.000 $585.000 $3,369.900 $1,500.000 $643.450
BACKFILL (TY A)
STA 1,643.000 $220.000 $220.000 $234.670 $265.000 $300.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 36.000 $720.000 $592.000 $639.360 $625.000 $696.990
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 36.000 $500.000 $355.000 $383.400 $375.000 $417.960
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 1,576.000 $55.000 $30.000 $35.730 $29.000 $27.200
PRIME COAT (MC-30)
GAL 110,757.000 $5.000 $4.000 $4.340 $4.550 $6.980
EMULS ASPH (EROSN CONT)(MULTI)
GAL 17,425.000 $4.000 $3.200 $3.370 $4.000 $5.920
ASPH (MULTI OPTION)
GAL 141,801.000 $4.800 $3.700 $3.800 $3.650 $4.010
AGGR(TY-B GR-5 SAC-A)
CY 4,172.000 $165.000 $135.000 $183.710 $115.500 $153.100
PLANE ASPH CONC PAV(0" TO 1")
SY 9,262.000 $2.000 $3.200 $3.570 $2.300 $1.990
PLANE ASPH CONC PAV(0" TO 2")
SY 12,969.000 $2.000 $4.000 $4.690 $4.250 $3.810
PLANE ASPH CONC PAV (2")
SY 19,296.000 $2.000 $4.000 $2.700 $3.800 $3.720
PLANE ASPH CONC PAV (3")
SY 448,963.000 $2.750 $2.820 $3.280 $3.000 $3.650
CUT & RESTORE ASPH PAVING
SY 32.000 $140.000 $155.000 $281.950 $270.000 $313.490
CL C CONC (RAIL FOUNDATION)
CY 195.000 $700.000 $635.000 $646.680 $635.000 $750.060
CL C CONC (COLLAR)
EA 16.000 $1,250.000 $1,500.000 $1,691.700 $1,850.000 $1,766.020
RIPRAP (CONC)(5 IN)
CY 66.000 $700.000 $815.000 $902.240 $515.000 $941.880
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $700.000 $830.000 $919.160 $740.000 $824.140
CLEANING AND SEALING JOINTS (CL 3)
LF 128.000 $40.000 $46.000 $48.600 $105.000 $52.980
CLEANING EXISTING JOINTS
LF 64.000 $12.000 $18.500 $19.440 $55.000 $21.190
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,405.000 $95.000 $190.000 $91.780 $90.000 $107.520
HEADER TYPE EXPANSION JOINT
CF 81.000 $400.000 $465.000 $491.400 $1,045.000 $535.690
JOINT SEALANT
LF 162.000 $40.000 $170.000 $178.200 $120.000 $194.260
CMP (GAL STL 24 IN)
LF 16.000 $130.000 $100.000 $112.780 $205.000 $117.730
CMP (GAL STL 36 IN)
LF 4.000 $130.000 $155.000 $169.170 $325.000 $176.600
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 2.000 $2,000.000 $1,100.000 $1,240.590 $3,500.000 $1,295.080
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 2.000 $2,000.000 $1,500.000 $1,691.700 $3,600.000 $1,766.020
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 8.000 $2,000.000 $1,500.000 $1,691.700 $1,900.000 $1,766.020
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 2.000 $2,000.000 $1,400.000 $1,522.540 $3,550.000 $1,589.420
RC PIPE (CL III)(24 IN)
LF 121.000 $180.000 $155.000 $169.170 $280.000 $176.600
RC PIPE (CL III)(36 IN)
LF 34.000 $350.000 $285.000 $315.780 $325.000 $329.660
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $12,000.000 $13,500.000 $15,225.330 $10,200.000 $15,894.160
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $15,000.000 $16,000.000 $17,480.930 $10,600.000 $18,248.850
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 1.000 $18,000.000 $29,500.000 $32,593.490 $18,850.000 $34,025.280
SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1) (C)
EA 4.000 $18,000.000 $20,000.000 $21,992.150 $25,000.000 $22,958.230
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $2,600.000 $2,000.000 $2,255.610 $3,465.000 $2,354.690
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 17.000 $2,600.000 $2,000.000 $2,255.600 $3,465.000 $2,354.690
SET (TY II) (36 IN) (CMP) (6: 1) (C)
EA 2.000 $7,000.000 $5,100.000 $5,639.020 $5,950.000 $5,886.730
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 3.000 $7,000.000 $5,100.000 $5,639.010 $7,000.000 $5,886.730
REMOV STR (HEADWALL)
EA 10.000 $1,500.000 $1,000.000 $1,127.800 $1,400.000 $1,762.470
REMOV STR (PIPE)
LF 135.000 $30.000 $20.500 $22.560 $125.000 $43.480
REMOV STR (BOX CULVERT)
LF 14.000 $250.000 $100.000 $112.780 $200.000 $451.610
MOBILIZATION
LS 1.000 $3,300,000.000 $2,100,000.000 $1,536,867.940 $3,958,000.000 $4,349,811.920
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $20,000.000 $25,000.000 $17,503.140 $33,000.000 $40,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 625.000 $3.000 $5.100 $5.400 $8.500 $5.890
BIODEG EROSN CONT LOGS (REMOVE)
LF 625.000 $1.500 $1.950 $2.050 $3.150 $2.240
RUMBLE STRIPS (SHOULDER)
LF 136,071.000 $0.140 $0.110 $0.120 $0.250 $0.210
MTL W-BEAM GD FEN (STEEL POST)
LF 1,125.000 $38.000 $30.500 $32.400 $31.700 $35.320
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,100.000 $2,500.000 $3,239.220 $2,640.000 $3,296.570
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,750.000 $1,700.000 $1,755.000 $1,715.000 $1,913.190
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,750.000 $1,500.000 $1,566.000 $1,530.000 $1,707.150
REMOVE METAL BEAM GUARD FENCE
LF 2,450.000 $3.800 $2.050 $2.160 $2.100 $2.350
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $350.000 $205.000 $216.000 $215.000 $235.470
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $350.000 $205.000 $216.000 $215.000 $235.470
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $380.000 $205.000 $216.000 $215.000 $235.470
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,420.000 $3,500.000 $3,726.000 $3,645.000 $4,061.840
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $400.000 $205.000 $216.000 $215.000 $235.470
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,100.000 $1,200.000 $1,242.000 $1,215.000 $1,353.950
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 9.000 $45.000 $43.500 $46.440 $45.000 $50.630
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 7.000 $45.000 $43.500 $46.440 $45.000 $50.630
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 10.000 $40.000 $43.500 $46.440 $45.000 $50.630
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 9.000 $40.000 $43.500 $46.440 $45.000 $50.630
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 39,410.000 $0.500 $0.340 $0.360 $0.350 $0.390
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 157,630.000 $0.400 $0.340 $0.360 $0.350 $0.390
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 157,630.000 $0.400 $0.340 $0.360 $0.350 $0.390
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 19,429.000 $1.800 $1.450 $1.820 $1.500 $2.350
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 7,582.000 $1.800 $1.450 $1.820 $1.550 $2.350
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 533.000 $1.000 $2.050 $2.160 $2.100 $2.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 25,560.000 $0.750 $1.000 $1.080 $1.050 $1.180
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 451.000 $8.000 $7.650 $8.100 $7.950 $8.830
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 369.000 $13.000 $13.000 $14.040 $13.750 $15.310
PREFAB PAV MRK TY C (W) (ARROW)
EA 33.000 $300.000 $230.000 $243.000 $238.000 $264.900
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $650.000 $815.000 $864.000 $845.000 $941.880
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 678.000 $24.000 $35.500 $37.800 $37.000 $41.210
D-GR HMA TY-B PG64-22
TON 74,079.000 $125.000 $107.750 $122.730 $122.000 $104.370
SP MIXES SP-D SAC-A PG70-28
TON 88,009.000 $137.000 $130.000 $141.670 $136.250 $131.800
TACK COAT
GAL 104,806.000 $6.000 $6.850 $6.570 $6.450 $7.450
EMUL TRTMENT (MX EXST MTRL) 12"
SY 441,450.000 $5.000 $3.300 $4.250 $4.250 $2.410
CEMENT
TON 2,583.000 $270.000 $240.000 $287.410 $254.500 $296.930
EMULSION
GAL 1,854,089.000 $3.500 $2.600 $3.150 $2.900 $3.450
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,500.000 $18,321.310 $9,185.000 $22,571.300
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 45,642.000 $0.600 $0.660 $0.700 $0.700 $0.770
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 173,199.000 $0.550 $0.610 $0.650 $0.650 $0.710
HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL)
LF 3,195.000 $0.600 $0.660 $0.700 $0.700 $0.770
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 167,988.000 $0.550 $0.610 $0.650 $0.650 $0.710
TMA (STATIONARY)
DAY 270.000 $300.000 $255.000 $450.510 $380.000 $529.080
TMA (MOBILE OPERATION)
HR 160.000 $100.000 $100.000 $102.630 $81.500 $101.290
REC REFL PAV MRKR TY II-A-A
EA 784.000 $27.000 $40.500 $43.200 $42.250 $47.090
REC REFL PAV MRKR TY II-C-R
EA 6,119.000 $27.000 $40.500 $43.200 $42.250 $47.090
CLEANING STRUCTURE (BENT)
EA 8.000 $1,250.000 $3,600.000 $1,676.730 $3,380.000 $2,307.600
CLEANING STRUCTURE (ABUTMENT)
EA 6.000 $1,250.000 $3,600.000 $1,676.700 $3,380.000 $2,913.930
Totals: $40,452,689.840 $34,924,133.610 $38,421,698.570 $39,697,800.250 $39,952,585.420