Job Info for 0168-08-075

County: RANDALL Highway: US 60 Date: 09/07/2023 (1 year ago) Engineer's Estimate: $40,452,690 Control Number: 0168-08-075
Project: F 2024(033) District: AMARILLO Time: 290 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $40,452,689.84
DUININCK, INC.   $34,924,133.61 1
-13.67% | -$5,528,556.23
RK HALL, LLC   $38,421,698.57 2
-5.02% | -$2,030,991.27
10.01% | $3,497,564.96
J. LEE MILLIGAN, INC.   $39,697,800.25 3
-1.87% | -$754,889.59
13.67% | $4,773,666.64
3.32% | $1,276,101.68
KIEWIT INFRASTRUCTURE SOUTH CO.   $39,952,585.42 4
-1.24% | -$500,104.42
14.4% | $5,028,451.81
0.64% | $254,785.17
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 1.99% $694,990.26
PERFORMANCE EQUIPMENT SERVICE 1.76% $614,664.75
TEX OP CONSTRUCTION, LP 1.13% $394,642.71
W. S. CONSTRUCTION COMPANY 1.07% $373,688.23
ALAMO BROTHERS CONCRETE INC 0.90% $314,317.20
TEXAS ROAD RECYCLERS, L.L.C. 0.53% $185,097.91
HJC FARMS, INC. 0.24% $83,817.92
MOBILE ENTERPRISES, INC. 0.20% $69,848.27
FC TRAFFIC CONTROL, INC. 0.19% $66,355.85
SAENZ TRANSPORT, LLC 0.14% $48,893.79
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.10% $34,924.13
SURFACE PREPARATION TECHNOLOGIES, LLC 0.06% $20,954.48
H & F TRUCKING 0.02% $6,984.83
Total: 8.33% $2,909,180.33

Bid Items

Items: 95, 0 filtered
RANDALL US 60  |  AMARILLO  |  0168-08-075  |  09/07/2023  |  $40,452,690  |  F 2024(033)  |  REHAB EXIST ROADWAY  |  290 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DUININCK, INC. RK HALL, LLC J. LEE MILLIGAN, INC. KIEWIT INFRASTRUCTURE SOUTH CO.
100 6001 PREPARING ROW AC 36.000 $200.000 $115.000 $192.620 $320.000 $635.360
104 6009 REMOVING CONC (RIPRAP) SY 36.000 $100.000 $125.000 $56.390 $85.000 $98.110
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY 99.000 $8.000 $26.500 $46.260 $33.250 $40.470
105 6054 REMOVING STAB BASE & ASPH PAV (18") SY 941.000 $20.000 $16.000 $20.750 $21.500 $15.650
112 6002 SUBGRADE WIDENING (DENS CONT) STA 9.000 $2,000.000 $585.000 $3,369.900 $1,500.000 $643.450
134 6001 BACKFILL (TY A) STA 1,643.000 $220.000 $220.000 $234.670 $265.000 $300.000
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 36.000 $720.000 $592.000 $639.360 $625.000 $696.990
164 6053 DRILL SEEDING (TEMP)(WARM OR COOL) AC 36.000 $500.000 $355.000 $383.400 $375.000 $417.960
247 6472 FL BS(CMP IN PLC)(TY A,B OR D GR4)(12") SY 1,576.000 $55.000 $30.000 $35.730 $29.000 $27.200
310 6009 PRIME COAT (MC-30) GAL 110,757.000 $5.000 $4.000 $4.340 $4.550 $6.980
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 17,425.000 $4.000 $3.200 $3.370 $4.000 $5.920
316 6001 ASPH (MULTI OPTION) GAL 141,801.000 $4.800 $3.700 $3.800 $3.650 $4.010
316 6080 AGGR(TY-B GR-5 SAC-A) CY 4,172.000 $165.000 $135.000 $183.710 $115.500 $153.100
354 6020 PLANE ASPH CONC PAV(0" TO 1") SY 9,262.000 $2.000 $3.200 $3.570 $2.300 $1.990
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 12,969.000 $2.000 $4.000 $4.690 $4.250 $3.810
354 6045 PLANE ASPH CONC PAV (2") SY 19,296.000 $2.000 $4.000 $2.700 $3.800 $3.720
354 6048 PLANE ASPH CONC PAV (3") SY 448,963.000 $2.750 $2.820 $3.280 $3.000 $3.650
400 6008 CUT & RESTORE ASPH PAVING SY 32.000 $140.000 $155.000 $281.950 $270.000 $313.490
420 6066 CL C CONC (RAIL FOUNDATION) CY 195.000 $700.000 $635.000 $646.680 $635.000 $750.060
420 6071 CL C CONC (COLLAR) EA 16.000 $1,250.000 $1,500.000 $1,691.700 $1,850.000 $1,766.020
432 6002 RIPRAP (CONC)(5 IN) CY 66.000 $700.000 $815.000 $902.240 $515.000 $941.880
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 46.000 $700.000 $830.000 $919.160 $740.000 $824.140
438 6006 CLEANING AND SEALING JOINTS (CL 3) LF 128.000 $40.000 $46.000 $48.600 $105.000 $52.980
438 6009 CLEANING EXISTING JOINTS LF 64.000 $12.000 $18.500 $19.440 $55.000 $21.190
450 6054 RAIL (TY SSTR) (W/DRAIN SLOTS) LF 1,405.000 $95.000 $190.000 $91.780 $90.000 $107.520
454 6008 HEADER TYPE EXPANSION JOINT CF 81.000 $400.000 $465.000 $491.400 $1,045.000 $535.690
454 6009 JOINT SEALANT LF 162.000 $40.000 $170.000 $178.200 $120.000 $194.260
460 6003 CMP (GAL STL 24 IN) LF 16.000 $130.000 $100.000 $112.780 $205.000 $117.730
460 6005 CMP (GAL STL 36 IN) LF 4.000 $130.000 $155.000 $169.170 $325.000 $176.600
462 6050 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 2.000 $2,000.000 $1,100.000 $1,240.590 $3,500.000 $1,295.080
462 6055 CONC BOX CULV (6 FT X 4 FT)(EXTEND) LF 2.000 $2,000.000 $1,500.000 $1,691.700 $3,600.000 $1,766.020
462 6056 CONC BOX CULV (6 FT X 5 FT)(EXTEND) LF 8.000 $2,000.000 $1,500.000 $1,691.700 $1,900.000 $1,766.020
462 6095 CONC BOX CULV (6 FT X 2 FT) (EXTEND) LF 2.000 $2,000.000 $1,400.000 $1,522.540 $3,550.000 $1,589.420
464 6005 RC PIPE (CL III)(24 IN) LF 121.000 $180.000 $155.000 $169.170 $280.000 $176.600
464 6008 RC PIPE (CL III)(36 IN) LF 34.000 $350.000 $285.000 $315.780 $325.000 $329.660
467 6173 SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C) EA 1.000 $12,000.000 $13,500.000 $15,225.330 $10,200.000 $15,894.160
467 6207 SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (C) EA 1.000 $15,000.000 $16,000.000 $17,480.930 $10,600.000 $18,248.850
467 6220 SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C) EA 1.000 $18,000.000 $29,500.000 $32,593.490 $18,850.000 $34,025.280
467 6225 SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1) (C) EA 4.000 $18,000.000 $20,000.000 $21,992.150 $25,000.000 $22,958.230
467 6394 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 2.000 $2,600.000 $2,000.000 $2,255.610 $3,465.000 $2,354.690
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 17.000 $2,600.000 $2,000.000 $2,255.600 $3,465.000 $2,354.690
467 6443 SET (TY II) (36 IN) (CMP) (6: 1) (C) EA 2.000 $7,000.000 $5,100.000 $5,639.020 $5,950.000 $5,886.730
467 6444 SET (TY II) (36 IN) (CMP) (6: 1) (P) EA 3.000 $7,000.000 $5,100.000 $5,639.010 $7,000.000 $5,886.730
496 6006 REMOV STR (HEADWALL) EA 10.000 $1,500.000 $1,000.000 $1,127.800 $1,400.000 $1,762.470
496 6007 REMOV STR (PIPE) LF 135.000 $30.000 $20.500 $22.560 $125.000 $43.480
496 6008 REMOV STR (BOX CULVERT) LF 14.000 $250.000 $100.000 $112.780 $200.000 $451.610
500 6001 MOBILIZATION LS 1.000 $3,300,000.000 $2,100,000.000 $1,536,867.940 $3,958,000.000 $4,349,811.920
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 17.000 $20,000.000 $25,000.000 $17,503.140 $33,000.000 $40,000.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 625.000 $3.000 $5.100 $5.400 $8.500 $5.890
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 625.000 $1.500 $1.950 $2.050 $3.150 $2.240
533 6001 RUMBLE STRIPS (SHOULDER) LF 136,071.000 $0.140 $0.110 $0.120 $0.250 $0.210
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 1,125.000 $38.000 $30.500 $32.400 $31.700 $35.320
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $3,100.000 $2,500.000 $3,239.220 $2,640.000 $3,296.570
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,750.000 $1,700.000 $1,755.000 $1,715.000 $1,913.190
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 1.000 $1,750.000 $1,500.000 $1,566.000 $1,530.000 $1,707.150
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,450.000 $3.800 $2.050 $2.160 $2.100 $2.350
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $350.000 $205.000 $216.000 $215.000 $235.470
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 3.000 $350.000 $205.000 $216.000 $215.000 $235.470
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 4.000 $380.000 $205.000 $216.000 $215.000 $235.470
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 6.000 $3,420.000 $3,500.000 $3,726.000 $3,645.000 $4,061.840
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 5.000 $400.000 $205.000 $216.000 $215.000 $235.470
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 2.000 $1,100.000 $1,200.000 $1,242.000 $1,215.000 $1,353.950
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 9.000 $45.000 $43.500 $46.440 $45.000 $50.630
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 7.000 $45.000 $43.500 $46.440 $45.000 $50.630
658 6069 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR) EA 10.000 $40.000 $43.500 $46.440 $45.000 $50.630
658 6070 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR) EA 9.000 $40.000 $43.500 $46.440 $45.000 $50.630
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 39,410.000 $0.500 $0.340 $0.360 $0.350 $0.390
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 157,630.000 $0.400 $0.340 $0.360 $0.350 $0.390
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 157,630.000 $0.400 $0.340 $0.360 $0.350 $0.390
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 19,429.000 $1.800 $1.450 $1.820 $1.500 $2.350
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 7,582.000 $1.800 $1.450 $1.820 $1.550 $2.350
666 6029 REFL PAV MRK TY I (W)8"(DOT)(090MIL) LF 533.000 $1.000 $2.050 $2.160 $2.100 $2.350
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 25,560.000 $0.750 $1.000 $1.080 $1.050 $1.180
668 6074 PREFAB PAV MRK TY C (W) (12") (SLD) LF 451.000 $8.000 $7.650 $8.100 $7.950 $8.830
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 369.000 $13.000 $13.000 $14.040 $13.750 $15.310
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 33.000 $300.000 $230.000 $243.000 $238.000 $264.900
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 1.000 $650.000 $815.000 $864.000 $845.000 $941.880
668 6091 PREFAB PAV MRK TY C (W) (18")(YLD TRI) EA 678.000 $24.000 $35.500 $37.800 $37.000 $41.210
3076 6001 D-GR HMA TY-B PG64-22 TON 74,079.000 $125.000 $107.750 $122.730 $122.000 $104.370
3077 6058 SP MIXES SP-D SAC-A PG70-28 TON 88,009.000 $137.000 $130.000 $141.670 $136.250 $131.800
3077 6075 TACK COAT GAL 104,806.000 $6.000 $6.850 $6.570 $6.450 $7.450
3089 6001 EMUL TRTMENT (MX EXST MTRL) 12" SY 441,450.000 $5.000 $3.300 $4.250 $4.250 $2.410
3089 6002 CEMENT TON 2,583.000 $270.000 $240.000 $287.410 $254.500 $296.930
3089 6003 EMULSION GAL 1,854,089.000 $3.500 $2.600 $3.150 $2.900 $3.450
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $15,000.000 $20,500.000 $18,321.310 $9,185.000 $22,571.300
6024 6008 HPPM W/RET REQ TY I(W)6"(BRK)(090MIL) LF 45,642.000 $0.600 $0.660 $0.700 $0.700 $0.770
6024 6011 HPPM W/RET REQ TY I(W)6"(SLD)(090MIL) LF 173,199.000 $0.550 $0.610 $0.650 $0.650 $0.710
6024 6020 HPPM W/RET REQ TY I(Y)6"(BRK)(090MIL) LF 3,195.000 $0.600 $0.660 $0.700 $0.700 $0.770
6024 6023 HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL) LF 167,988.000 $0.550 $0.610 $0.650 $0.650 $0.710
6185 6002 TMA (STATIONARY) DAY 270.000 $300.000 $255.000 $450.510 $380.000 $529.080
6185 6003 TMA (MOBILE OPERATION) HR 160.000 $100.000 $100.000 $102.630 $81.500 $101.290
6362 6004 REC REFL PAV MRKR TY II-A-A EA 784.000 $27.000 $40.500 $43.200 $42.250 $47.090
6362 6005 REC REFL PAV MRKR TY II-C-R EA 6,119.000 $27.000 $40.500 $43.200 $42.250 $47.090
7309 6001 CLEANING STRUCTURE (BENT) EA 8.000 $1,250.000 $3,600.000 $1,676.730 $3,380.000 $2,307.600
7309 6002 CLEANING STRUCTURE (ABUTMENT) EA 6.000 $1,250.000 $3,600.000 $1,676.700 $3,380.000 $2,913.930
Totals: $40,452,689.84 $34,924,133.61 $38,421,698.57 $39,697,800.25 $39,952,585.42