Show Job Controls
Bid Cobra

POTTER IH0040 (6384-36-001)

Items: 16

County: POTTER
Length: N/A
Highway: IH0040
District: AMARILLO
Control Number: 6384-36-001
DBE Goal: N/A
Project: RMC - 638436001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $351,750.00
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: CABLE MEDIAN BARRIER SYSTEM REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$351,750.00
$335,300.00
Over/Under Est: -4.68% -$16,450.00
Over/Under Est: -3.68% -$12,937.50
Amt Left: 1.05% $3,512.50
$370,000.00
Over/Under Est: 5.19% $18,250.00
Amt Left: 10.35% $34,700.00
Delta: -9.20% -$31,187.50

Bid Items & Bid Tabulations

16 Total 0 of 16
POTTER  |  IH0040  |  AMARILLO  |  6384-36-001  |  08/05/2021  |  $351,750.00  |  RMC - 638436001  |  CABLE MEDIAN BARRIER SYSTEM REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E.V.G. ENTERPRISE
BARRICADES UNLIMITED
HJC FARMS, INC.
MOBILIZATION (CALLOUT)
EA 40.000 $1,500.000 $2,500.000 $2,300.000 $500.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 200.000 $20.000 $10.000 $9.000 $15.000
REPLACE POSTS (TL-3)
EA 50.000 $150.000 $15.000 $175.000 $100.000
REPLACE POSTS (TL-4)
EA 1,000.000 $150.000 $115.000 $210.000 $250.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 20.000 $170.000 $100.000 $145.000 $35.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 30.000 $150.000 $210.000 $145.000 $75.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $200.000 $10.000 $37.500 $20.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $80.000 $100.000 $37.500 $20.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 20.000 $1,500.000 $100.000 $45.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $1,100.000 $2,500.000 $40.000 $2,000.000
REPLACE CABLE (TL-3)
LF 100.000 $5.000 $1.000 $5.000 $1.000
REPLACE CABLE (TL-4)
LF 500.000 $3.000 $3.500 $5.000 $2.000
CHECK / RE-TENSION CABLE
EA 50.000 $300.000 $100.000 $42.250 $20.000
REPLACE POST HARDWARE (TL-4)
EA 50.000 $20.000 $180.000 $20.000 $25.000
REPLACE POST HARDWARE (TL-3)
EA 30.000 $35.000 $10.000 $60.000 $10.000
TMA (STATIONARY)
DAY 150.000 $250.000 $100.000 $55.000 $100.000
Totals: $351,750.000 $335,300.000 $338,812.500 $370,000.000