Job Info for 6345-60-001

County: POTTER Highway: IH0040 Date: 06/25/2019 (5 years ago) Engineer's Estimate: $257,395 Control Number: 6345-60-001
Project: RMC - 634560001 District: AMARILLO Time: 365 CALENDAR DAYS Type: ON CALL GUARDRAIL & CABLE BARRIER REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $257,395.00
AMARILLO RMT ENTERPRISES, LLC   $176,400.00 1
-31.47% | -$80,995.00
ABOVE ALL CONSTRUCTION   $229,270.00 2
-10.93% | -$28,125.00
29.97% | $52,870.00
E.V.G. ENTERPRISE   $356,220.00 3
38.39% | $98,825.00
101.94% | $179,820.00
55.37% | $126,950.00

Bid Items

Items: 33, 0 filtered
POTTER IH0040  |  AMARILLO  |  6345-60-001  |  06/25/2019  |  $257,395  |  RMC - 634560001  |  ON CALL GUARDRAIL & CABLE BARRIER REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate AMARILLO RMT ENTERPRISES, LLC ABOVE ALL CONSTRUCTION E.V.G. ENTERPRISE
500 6033 MOBILIZATION (CALLOUT) EA 50.000 $1,000.000 $50.000 $1.000 $275.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 250.000 $25.000 $40.000 $50.000 $162.000
770 6017 REALIGN POSTS EA 225.000 $10.000 $20.000 $30.000 $12.000
770 6025 REPLACE HINGED TOP SGT STEEL POST EA 125.000 $50.000 $50.000 $40.000 $80.000
770 6026 RESET HINGED TOP SGT STL POST EA 100.000 $14.000 $50.000 $40.000 $1.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 10.000 $1,000.000 $10.000 $2,300.000 $2,870.000
770 6034 REPAIR RAIL ELEMENT(W - BEAM FURNISHED) LF 6,000.000 $9.000 $13.000 $17.000 $12.000
770 6035 REPAIR RAIL ELEMENT(THRIE - BEAM)(FURN) LF 20.000 $3.000 $40.000 $20.000 $8.000
770 6036 REP RAIL ELMNT (THRIE - BM TRANS)(FURN) LF 20.000 $3.000 $40.000 $20.000 $3.000
770 6042 REM/ REPL TIM/STL POST W CONC FND(FURN) EA 5.000 $25.000 $100.000 $100.000 $25.000
770 6043 REM/REP TIM/STL POST W/O CONC FND(FURN) EA 250.000 $25.000 $40.000 $100.000 $25.000
770 6044 INSTALL BLOCKOUTS (FURNISHED) EA 500.000 $10.000 $12.500 $10.000 $10.000
770 6045 REM & REPLACE BLOCKOUTS (FURNISHED) EA 250.000 $12.000 $12.500 $10.000 $5.000
770 6046 REM & RESET SGT IMPACT HEAD (FURNISHED) EA 20.000 $1,000.000 $75.000 $10.000 $250.000
770 6047 REPL SGT IMPACT HEAD (FURNISHED) EA 30.000 $80.000 $75.000 $250.000 $80.000
770 6048 REPLACE SINGLE GDRAIL TERM POST (FURN) EA 150.000 $20.000 $75.000 $50.000 $150.000
770 6049 REPLACE SGT CABLE ANCHOR (FURN) EA 35.000 $25.000 $25.000 $25.000 $25.000
770 6050 REPLACE SGT CABLE ASSEMBLY (FURN) EA 35.000 $35.000 $40.000 $25.000 $75.000
770 6051 REPLACE SGT STRUT (FURN) EA 10.000 $35.000 $35.000 $25.000 $75.000
770 6060 REMOVE AND REPLACE DAT EA 5.000 $50.000 $100.000 $400.000 $1,200.000
771 6001 REPLACE POSTS (TL-3) EA 100.000 $35.000 $15.000 $50.000 $85.000
771 6002 REPLACE POSTS (TL-4) EA 200.000 $45.000 $15.000 $50.000 $134.000
771 6003 CABLE SPLICE / TURNBUCKLE (TL-3) EA 5.000 $15.000 $15.000 $50.000 $135.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 5.000 $15.000 $15.000 $50.000 $229.000
771 6005 REPAIR CONCRETE FOUNDATION (TL-3) EA 5.000 $15.000 $15.000 $50.000 $69.000
771 6006 REPAIR CONCRETE FOUNDATION (TL-4) EA 5.000 $15.000 $15.000 $50.000 $60.000
771 6007 REPR OR REPLC CABLE BARR TERM SEC(TL-3) EA 5.000 $110.000 $100.000 $200.000 $428.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 10.000 $260.000 $100.000 $400.000 $694.000
771 6009 REPLACE CABLE (TL-3) LF 100.000 $0.750 $2.500 $5.000 $2.500
771 6010 REPLACE CABLE (TL-4) LF 100.000 $0.750 $2.500 $5.000 $2.800
771 6011 CHECK / RE-TENSION CABLE EA 10.000 $15.000 $15.000 $50.000 $260.000
6185 6002 TMA (STATIONARY) DAY 150.000 $200.000 $50.000 $1.000 $250.000
7148 6005 FREEWAY 1 LANE CLOSURE HR 320.000 $120.000 $50.000 $1.000 $150.000
Totals: $257,395.00 $176,400.00 $229,270.00 $356,220.00