Job Info for 1245-02-050

County: POTTER Highway: RM 1061 Date: 09/08/2022 (2 years ago) Engineer's Estimate: $7,835,330 Control Number: 1245-02-050
Project: F 2023(053) District: AMARILLO Time: 79 WORKING DAYS Type: PREVENTIVE MAINTENANCE
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $7,835,330.00
RK HALL, LLC   $7,909,237.48 1
0.94% | $73,907.48
DUININCK, INC.   $8,332,385.40 2
6.34% | $497,055.40
5.35% | $423,147.92
GILVIN-TERRILL, LTD.   $8,563,707.92 3
9.3% | $728,377.92
8.27% | $654,470.44
2.78% | $231,322.52
J. LEE MILLIGAN, INC.   $8,649,185.55 4
10.39% | $813,855.55
9.36% | $739,948.07
1.00% | $85,477.63
KIEWIT INFRASTRUCTURE SOUTH CO.   $9,652,783.73 5
23.2% | $1,817,453.73
22.04% | $1,743,546.25
11.60% | $1,003,598.18

Bid Items

Items: 46, 0 filtered
POTTER RM 1061  |  AMARILLO  |  1245-02-050  |  09/08/2022  |  $7,835,330  |  F 2023(053)  |  PREVENT MAINT  |  79 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC DUININCK, INC. GILVIN-TERRILL, LTD. J. LEE MILLIGAN, INC. KIEWIT INFRASTRUCTURE SOUTH CO.
100 6001 PREPARING ROW AC 24.770 $200.000 $278.290 $105.000 $500.000 $490.000 $369.500
104 6054 REMOVING CONCRETE(MOW STRIP) LF 4,455.000 $9.000 $15.900 $5.150 $5.000 $8.550 $5.070
134 6001 BACKFILL (TY A) STA 542.000 $200.000 $259.540 $340.000 $250.000 $265.000 $288.770
164 6042 DRILL SEEDING (TEMP) (WARM) AC 24.860 $600.000 $441.300 $440.000 $450.000 $580.000 $704.080
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 12,040.000 $4.000 $4.000 $3.900 $5.000 $5.000 $5.950
351 6012 FLEXIBLE PAVEMENT STRUCTURE REPAIR(2") SY 7,470.000 $21.000 $20.910 $26.500 $30.000 $31.450 $30.920
354 6179 PLANE ASPH CONC PAV (0"-2.75") SY 3,272.000 $5.000 $4.940 $5.650 $5.000 $5.000 $3.840
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 58.000 $750.000 $1,272.000 $845.000 $800.000 $740.000 $1,126.520
500 6001 MOBILIZATION LS 1.000 $650,000.000 $197,730.930 $480,000.000 $850,000.000 $859,000.000 $959,761.790
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $21,000.000 $9,894.290 $25,500.000 $19,200.000 $22,350.000 $35,000.000
530 6002 INTERSECTIONS (ACP) SY 892.000 $75.000 $25.960 $29.500 $65.000 $58.250 $72.790
533 6001 RUMBLE STRIPS (SHOULDER) LF 107,560.000 $0.300 $0.160 $0.100 $0.300 $0.250 $0.100
533 6002 RUMBLE STRIPS (CENTERLINE) LF 53,780.000 $0.300 $0.180 $0.150 $0.300 $0.300 $0.100
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 3,075.000 $45.000 $37.100 $38.000 $35.000 $37.200 $39.430
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $4,000.000 $3,299.810 $2,800.000 $2,675.000 $4,000.000 $3,013.440
540 6033 MTL BM GD FEN (LONG SPAN SYSTEM) EA 2.000 $2,500.000 $1,590.000 $1,500.000 $1,500.000 $1,700.000 $1,689.780
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,595.000 $5.000 $4.240 $2.650 $4.000 $3.150 $4.510
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 8.000 $300.000 $424.000 $265.000 $400.000 $315.000 $450.610
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 24.000 $4,200.000 $3,312.500 $3,300.000 $3,125.000 $3,700.000 $3,520.380
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 24.000 $500.000 $424.000 $265.000 $400.000 $315.000 $450.610
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 41.000 $850.000 $832.100 $675.000 $820.000 $1,055.000 $884.320
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 11.000 $1,100.000 $1,018.660 $830.000 $37.000 $1,185.000 $1,082.590
644 6076 REMOVE SM RD SN SUP&AM EA 14.000 $130.000 $134.480 $21.000 $110.000 $110.000 $168.980
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 12.000 $16.000 $36.040 $21.000 $34.000 $21.100 $38.300
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 57.000 $50.000 $47.700 $38.500 $45.000 $44.850 $50.690
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 24.000 $160.000 $128.260 $185.000 $145.000 $163.500 $136.310
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 5,760.000 $0.250 $0.210 $0.210 $0.200 $0.210 $0.230
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 6,805.000 $0.250 $0.210 $0.210 $0.200 $0.210 $0.230
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 85,180.000 $0.250 $0.180 $0.180 $0.170 $0.180 $0.190
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 3,179.000 $1.500 $1.290 $1.050 $1.000 $1.600 $2.250
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 12,612.000 $1.500 $1.290 $1.050 $1.000 $1.650 $2.250
666 6005 REFL PAV MRK TY I (W)4"(DOT)(090MIL) LF 285.000 $0.500 $1.060 $1.050 $1.000 $1.050 $1.130
672 6007 REFL PAV MRKR TY I-C EA 290.000 $3.250 $6.360 $6.300 $6.000 $6.350 $6.760
672 6009 REFL PAV MRKR TY II-A-A EA 1,411.000 $3.250 $5.300 $5.250 $5.000 $5.250 $5.630
3057 6001 REINFORMT GRID FOR ASPHALT PVMT OVERLAY SY 188,864.000 $7.000 $8.060 $8.000 $8.000 $8.000 $8.730
3076 6058 D-GR HMA TY-F SAC-A PG70-22 TON 9,144.000 $140.000 $137.230 $145.000 $135.000 $135.000 $170.490
3076 6066 TACK COAT GAL 28,817.000 $5.500 $4.390 $3.400 $4.500 $4.750 $4.970
3077 6058 SP MIXES SP-D SAC-A PG70-28 TON 24,430.000 $122.000 $137.030 $141.600 $140.000 $134.750 $148.380
3077 6075 TACK COAT GAL 39,620.000 $5.500 $7.490 $7.200 $4.500 $7.400 $7.140
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $15,000.000 $24,837.800 $10,500.000 $20,000.000 $16,500.000 $24,383.720
6024 6002 HPPM W/RET REQ TY I(W)4"(BRK)(090MIL) LF 5,760.000 $0.600 $0.510 $0.510 $0.480 $0.500 $0.540
6024 6005 HPPM W/RET REQ TY I(W)4"(SLD)(090MIL) LF 108,354.000 $0.500 $0.460 $0.450 $0.430 $0.450 $0.480
6024 6014 HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL) LF 6,805.000 $0.600 $0.510 $0.510 $0.480 $0.500 $0.540
6024 6017 HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL) LF 85,180.000 $0.500 $0.460 $0.450 $0.430 $0.450 $0.480
6185 6002 TMA (STATIONARY) DAY 83.000 $200.000 $446.490 $210.000 $670.000 $515.000 $606.390
6185 6003 TMA (MOBILE OPERATION) HR 110.000 $80.000 $82.220 $95.000 $95.000 $86.000 $107.350
Totals: $7,835,330.00 $7,909,237.49 $8,332,385.40 $8,563,707.92 $8,649,185.55 $9,652,783.74