POTTER VARIOUS (0904-00-220)

Items: 40

County: POTTER
Length: 0.0000 MILES
Highway: VARIOUS
District: AMARILLO
Control Number: 0904-00-220
DBE Goal: 0.0%
Project: F 2B24(460)
Guaranty: $65,000.00
Time: 182 WORKING DAYS
Engineer's Estimate: $3,248,892.00
Date: 09/06/2024 (1 year ago)
Contract Number: 9243219
Type: INSTALL/REHABILITATE ITS
Project ID: A00188833
Project Description: MISCELLANEOUS TYPE WORK CONSISTING OF INFRASTRUCTURE-BASED INTELLIGENT TRANSPORTATION SYSTEMS, CCTV AND DMS ON IH 40
Mail/Deliver Bids To: N/A
BERNARDO FERREL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,248,892.00
$3,354,582.50
Over/Under Est: 3.25% $105,690.50
Over/Under Est: 17.3% $562,098.27
Amt Left: 13.61% $456,407.77
$4,289,229.15
Over/Under Est: 32.02% $1,040,337.15
Amt Left: 27.86% $934,646.65
Delta: -12.55% -$478,238.88
Subcontractor Percentage Amount
APOLLO CONSTRUCTORS, INC. 32.67% $1,126,255.69
HJC FARMS, INC. 7.06% $243,384.30
BARRICADES UNLIMITED 0.00% $0.00
Total: 39.73% $1,369,639.99

Bid Items & Bid Tabulations

40 Total 0 of 40
POTTER  |  VARIOUS  |  AMARILLO  |  0904-00-220  |  09/06/2024  |  $3,248,892.00  |  F 2B24(460)  |  INSTL/REHAB ITS  |  182 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LIGHT IT UP ELECTRIC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
MICA CORPORATION
DRILL SHAFT (42 IN)
LF 304.000 $650.000 $630.000 $687.340 $835.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 105.000 $831.500 $850.000 $849.840 $986.000
RIPRAP (CONC)(4 IN)
CY 42.000 $1,200.000 $2,100.000 $2,126.560 $3,600.000
RIPRAP (MOW STRIP)(4 IN)
CY 91.000 $1,050.000 $1,450.000 $1,736.560 $1,500.000
MOBILIZATION
LS 1.000 $300,000.000 $342,000.000 $372,774.870 $424,225.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $15,000.000 $13,000.000 $24,742.160 $36,645.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,975.000 $40.000 $38.000 $61.530 $38.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $3,250.000 $3,200.000 $3,798.130 $3,280.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $2,372.500 $1,700.000 $2,010.630 $1,700.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,800.000 $3,800.000 $4,350.630 $3,770.000
CONDT (PVC) (SCH 80) (2")
LF 9,335.000 $18.000 $22.000 $32.980 $25.700
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,025.000 $39.000 $37.000 $45.980 $46.600
CONDT (PVC) (SCH 80) (3")
LF 1,880.000 $30.000 $42.000 $52.480 $33.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 30.000 $66.000 $69.000 $65.480 $67.700
ELEC CONDR (NO.8) BARE
LF 1,805.000 $2.200 $3.250 $3.290 $3.150
ELEC CONDR (NO.8) INSULATED
LF 3,610.000 $2.700 $3.500 $3.480 $3.230
ELEC CONDR (NO.6) BARE
LF 1,815.000 $2.700 $3.750 $3.870 $3.350
ELEC CONDR (NO.6) INSULATED
LF 3,630.000 $3.000 $4.000 $4.260 $3.570
ELEC CONDR (NO.4) BARE
LF 1,525.000 $3.000 $4.500 $5.240 $3.850
ELEC CONDR (NO.4) INSULATED
LF 3,900.000 $3.450 $4.750 $5.690 $4.100
ELEC CONDR (NO.2) BARE
LF 4,115.000 $4.000 $5.250 $6.540 $5.950
ELEC CONDR (NO.2) INSULATED
LF 9,665.000 $4.600 $6.250 $7.060 $6.450
ELEC CONDR (NO.1/0) BARE
LF 1,100.000 $4.500 $8.000 $8.750 $8.150
ELEC CONDR (NO.1/0) INSULATED
LF 3,300.000 $5.150 $8.500 $9.530 $8.800
ELEC CONDR (NO.4/0) BARE
LF 1,910.000 $4.000 $9.750 $11.610 $16.050
ELEC CONDR (NO.4/0) INSULATED
LF 5,730.000 $4.700 $11.000 $12.390 $16.200
GROUND BOX TY A (122311)W/APRON
EA 32.000 $2,250.000 $1,900.000 $2,136.250 $3,191.000
GROUND BOX TY C (162911)W/APRON
EA 9.000 $1,600.000 $2,200.000 $2,428.750 $3,406.000
ELC SRV TY D 120/240 100(NS)AL(N)SP(O)
EA 16.000 $8,700.000 $11,000.000 $8,829.000 $12,800.000
INS OH SN SUP(30 FT BAL TEE)
EA 5.000 $64,752.500 $55,000.000 $66,673.550 $66,690.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 21.000 $33.000 $55.000 $76.370 $56.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 11.000 $33.000 $55.000 $76.370 $56.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,000.000 $20,000.000 $24,150.880 $19,800.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 16.000 $14,750.000 $13,000.000 $12,667.700 $18,775.000
CCTV MOUNT (POLE)
EA 16.000 $10,877.500 $2,500.000 $1,302.000 $1,421.000
INSTALL DMS (POLE MTD CABINET)
EA 5.000 $40,300.000 $20,000.000 $17,937.500 $78,600.000
ITS POLE (50 FT)(90 MPH)
EA 16.000 $23,737.500 $25,000.000 $27,772.600 $17,195.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 16.000 $7,000.000 $8,500.000 $5,897.500 $7,650.000
TMA (STATIONARY)
DAY 182.000 $330.000 $500.000 $515.300 $830.000
INSTALL OF CELLULAR MODEM
EA 21.000 $1,400.000 $4,500.000 $5,306.250 $2,143.000
Totals: $3,248,892.000 $3,354,582.500 $3,810,990.270 $4,289,229.150