County: POTTER Highway: VA Date: 05/07/2020 (4 years ago) Engineer's Estimate: $4,654,169 Control Number: 0904-00-195
Project: C 904-00-195 District: AMARILLO Time: 171 WORKING DAYS Type: INSTALL CABLE MEDIAN BARRIER

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,654,169.30
HJC FARMS, INC.   $3,940,370.90 1
-15.34% | -$713,798.40
MASSANA, INC.   $3,974,224.00 2
-14.61% | -$679,945.30
0.86% | $33,853.10
SCR CIVIL CONSTRUCTION, LLC   $4,508,233.40 3
-3.14% | -$145,935.90
14.41% | $567,862.50
13.44% | $534,009.40
GRATIOT CONSTRUCTION, LTD.   $5,255,306.77 4
12.92% | $601,137.47
33.37% | $1,314,935.87
16.57% | $747,073.37
FNH CONSTRUCTION, LLC   $5,377,446.00 5
15.54% | $723,276.70
36.47% | $1,437,075.10
2.32% | $122,139.23

Bid Items

Items: 26, 0 filtered
POTTER VA  |  AMARILLO  |  0904-00-195  |  05/07/2020  |  $4,654,169  |  C 904-00-195  |  INSTL CABLE MEDIAN BARRIER  |  171 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HJC FARMS, INC. MASSANA, INC. SCR CIVIL CONSTRUCTION, LLC GRATIOT CONSTRUCTION, LTD. FNH CONSTRUCTION, LLC
104 6044 REMOVING CONC (FLUME) SY 208.000 $30.000 $15.000 $42.000 $50.000 $60.000 $20.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 20,536.000 $7.750 $6.000 $8.000 $6.200 $14.650 $15.000
105 6036 REMOVING STAB BASE & ASPH PAV(15"-20") SY 6,825.000 $20.000 $7.000 $15.000 $20.000 $7.810 $20.000
150 6002 BLADING HR 20.000 $130.000 $150.000 $300.000 $550.000 $250.000 $150.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 10,429.000 $1.500 $0.300 $0.280 $0.250 $1.250 $1.000
164 6041 DRILL SEEDING (TEMP) (WARM) SY 10,429.000 $0.200 $0.300 $0.280 $0.250 $1.250 $1.000
314 6014 EMULS ASPH (EROSN CONT)(MS-2) GAL 1,049.000 $4.000 $6.000 $8.000 $16.000 $37.500 $10.000
432 6001 RIPRAP (CONC)(4 IN) CY 3.000 $500.000 $400.000 $450.000 $3,300.000 $556.880 $650.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 4,039.000 $425.000 $525.000 $300.000 $504.000 $442.560 $500.000
464 6005 RC PIPE (CL III)(24 IN) LF 2,014.000 $150.000 $85.000 $130.000 $96.000 $122.500 $105.000
467 6397 SET (TY II) (24 IN) (RCP) (8: 1) (P) EA 14.000 $3,000.000 $2,000.000 $4,000.000 $1,300.000 $4,237.500 $2,850.000
500 6001 MOBILIZATION LS 1.000 $325,000.000 $200,000.000 $394,021.760 $202,000.000 $512,500.000 $500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 $5,000.000 $3,630.000 $45,000.000 $7,900.000 $31,250.000 $8,500.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 1,150.000 $6.000 $5.000 $3.500 $3.350 $10.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,150.000 $5.000 $1.000 $1.500 $0.850 $6.250 $9.000
530 6024 TURNOUTS (RAP) SY 20,895.000 $35.000 $10.000 $7.000 $16.500 $37.750 $38.000
543 6002 CABLE BARRIER SYSTEM (TL-4) LF 79,886.000 $10.000 $9.250 $9.500 $11.700 $10.740 $10.000
543 6020 CABLE BARRIER TERMINAL SECTION (TL-4) EA 35.000 $3,500.000 $2,500.000 $2,165.000 $4,465.000 $2,707.500 $3,000.000
543 6021 REMOVE CABLE BARRIER LF 18,386.000 $5.000 $3.000 $6.000 $3.000 $1.250 $3.000
543 6022 REMOVE CABLE BARRIER TERMINAL SECTION EA 43.000 $600.000 $350.000 $1,000.000 $275.000 $1,043.750 $1,000.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 22.000 $1,200.000 $800.000 $1,100.000 $1,135.000 $312.500 $850.000
644 6076 REMOVE SM RD SN SUP&AM EA 18.000 $120.000 $75.000 $300.000 $150.000 $150.000 $650.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 56.000 $110.000 $140.000 $180.000 $100.000 $62.500 $100.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 814.000 $35.000 $30.000 $37.000 $40.000 $25.000 $100.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 324.000 $75.000 $50.000 $120.000 $90.000 $12.500 $150.000
6185 6002 TMA (STATIONARY) DAY 100.000 $150.000 $100.000 $100.000 $525.000 $12.500 $350.000
Totals: $4,654,169.30 $3,940,370.90 $3,974,224.00 $4,508,233.40 $5,255,306.77 $5,377,446.00