Bid Cobra

POTTER SH 136 (0379-02-032)

Items: 77

County: POTTER
Length: N/A
Highway: SH 136
District: AMARILLO
Control Number: 0379-02-032
DBE Goal: N/A
Project: STP 2B20(144)HES
Guaranty: N/A
Time: 409 WORKING DAYS
Engineer's Estimate: $8,577,014.95
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$8,577,014.95
$9,215,103.34
Over/Under Est: 7.44% $638,088.39
$9,367,148.17
Over/Under Est: 9.21% $790,133.22
Amt Left: 1.65% $152,044.83
$10,198,442.29
Over/Under Est: 18.9% $1,621,427.34
Amt Left: 10.67% $983,338.95
Delta: -8.87% -$831,294.12
$10,690,912.16
Over/Under Est: 24.65% $2,113,897.21
Amt Left: 16.02% $1,475,808.82
Delta: -4.83% -$492,469.87

Bid Items & Bid Tabulations

77 Total 0 of 77
POTTER  |  SH 136  |  AMARILLO  |  0379-02-032  |  08/06/2020  |  $8,577,014.95  |  STP 2B20(144)HES  |  REHAB EXIST ROADWAY  |  409 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KIEWIT INFRASTRUCTURE SOUTH CO.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
REMOVING CONC (RIPRAP)
CY 62.000 $1.000 $253.840 $100.000 $560.000 $240.960
REMOVING STAB BASE AND ASPH PAV (6")
SY 5,967.000 $5.500 $4.980 $6.850 $12.500 $6.070
REMOVING STAB BASE AND ASPH PAV (10")
SY 245.000 $6.500 $39.220 $14.600 $40.000 $24.280
EXCAVATION (ROADWAY)
CY 44,656.000 $15.000 $11.120 $15.000 $15.000 $15.130
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 9,403.000 $30.000 $10.000 $22.500 $19.000 $14.030
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 25.870 $600.000 $494.990 $415.000 $390.000 $421.200
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 25.870 $500.000 $444.230 $370.000 $350.000 $378.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 95,561.000 $13.000 $18.570 $15.500 $15.000 $19.720
REWORK BS MTL (TY B) (14") (DENS CONT)
SY 53,716.000 $6.000 $11.080 $11.000 $6.000 $13.800
CEMENT
TON 1,034.000 $200.000 $215.130 $160.000 $165.000 $217.160
CEMENT TREAT (SUBGRADE) (8")
SY 95,539.000 $3.500 $1.990 $2.500 $4.000 $4.110
PRIME COAT (MC-30)
GAL 23,884.000 $3.500 $5.130 $3.800 $6.000 $5.630
EMULS ASPH (EROSN CONT)(MS-2)
GAL 12,611.000 $4.000 $5.400 $4.100 $6.000 $4.480
ASPH (MULTI OPTION)
GAL 36,302.000 $4.000 $3.130 $4.400 $3.000 $3.790
AGGR(TY-B GR-4 SAC-B)
CY 870.000 $145.000 $160.360 $165.000 $220.000 $284.960
PLANE ASPH CONC PAV (4")
SY 59,683.000 $2.050 $2.880 $4.000 $3.000 $2.850
CEM STABIL BKFL
CY 39.000 $350.000 $507.690 $435.000 $450.000 $313.810
CUT & RESTORE ASPH PAVING
SY 52.000 $160.000 $120.580 $221.750 $700.000 $169.570
FLOWABLE BACKFILL
CY 5.000 $230.000 $507.690 $620.000 $1,000.000 $300.600
CL C CONC (RAIL FOUNDATION)
CY 11.000 $695.000 $2,221.130 $710.000 $675.000 $725.750
RIPRAP CONC (8 IN)
CY 122.000 $475.000 $698.070 $422.000 $415.000 $388.530
RAIL (TY SSTR)
LF 74.000 $120.000 $253.840 $227.200 $216.000 $232.490
CMP (GAL STL 21 IN)
LF 12.000 $125.000 $101.540 $143.500 $2,000.000 $321.050
CONC BOX CULV (5 FT X 2 FT)
LF 104.000 $300.000 $698.070 $640.000 $1,400.000 $567.060
RC PIPE (CL III)(24 IN)
LF 20.000 $180.000 $152.310 $250.000 $1,300.000 $350.430
RC PIPE (CL III)(36 IN)
LF 8.000 $200.000 $317.300 $365.000 $1,400.000 $594.620
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $6,000.000 $8,884.510 $9,400.000 $8,918.000 $9,631.230
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 7.000 $2,000.000 $1,903.820 $3,675.000 $3,000.000 $2,285.360
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $3,000.000 $4,442.260 $5,400.000 $3,550.000 $3,748.870
REMOV STR (SET)
EA 3.000 $1,050.000 $1,269.220 $1,520.000 $800.000 $1,235.060
REMOV STR (WINGWALL)
EA 1.000 $1,300.000 $1,269.220 $4,500.000 $1,000.000 $1,489.230
REMOV STR (HEADWALL)
EA 3.000 $1,160.000 $1,269.220 $3,000.000 $1,000.000 $1,489.230
REMOV STR (PIPE)
LF 21.000 $27.000 $12.690 $215.000 $200.000 $36.370
MOBILIZATION
LS 1.000 $735,000.000 $922,715.150 $935,000.000 $1,000,000.000 $1,069,091.210
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $23,000.000 $10,000.000 $21,500.000 $30,000.000 $16,805.420
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 3,820.000 $7.150 $4.120 $7.500 $6.000 $3.510
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,820.000 $2.100 $0.760 $3.350 $1.000 $0.650
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 41,920.000 $0.120 $0.220 $0.500 $0.210 $0.240
MTL W-BEAM GD FEN (STEEL POST)
LF 1,655.000 $27.000 $30.460 $23.500 $24.000 $25.920
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,062.480 $1,960.000 $1,625.000 $1,755.000
REMOVE METAL BEAM GUARD FENCE
LF 1,427.000 $2.700 $5.080 $3.450 $4.000 $4.320
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,700.000 $3,395.150 $2,800.000 $2,675.000 $2,889.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $345.000 $507.690 $290.000 $400.000 $432.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $297.000 $367.840 $380.000 $321.000 $341.280
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $550.000 $786.960 $675.000 $670.000 $604.800
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 89.000 $806.000 $736.150 $585.000 $360.000 $802.440
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 25.000 $920.000 $850.370 $675.000 $462.000 $924.480
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 20.000 $1,350.000 $1,312.890 $885.000 $695.000 $1,010.880
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,360.000 $1,396.140 $1,015.000 $1,100.000 $1,242.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 21.000 $760.000 $285.570 $560.000 $225.000 $156.600
REMOVE SM RD SN SUP&AM
EA 110.000 $140.000 $139.610 $150.000 $110.000 $118.800
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 50.000 $135.000 $174.820 $215.000 $129.000 $127.440
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 15.000 $35.000 $36.810 $100.000 $29.000 $31.320
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 197.000 $40.000 $38.080 $45.000 $30.000 $32.400
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,197.000 $0.400 $0.510 $0.340 $0.400 $0.430
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 1,211.000 $0.390 $0.510 $0.340 $0.400 $0.430
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 70,753.000 $0.370 $0.510 $0.340 $0.400 $0.430
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 14,300.000 $0.390 $0.490 $0.400 $0.390 $0.420
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 6,117.000 $0.750 $0.990 $0.790 $0.780 $0.840
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 72.000 $8.000 $12.690 $9.500 $10.000 $10.800
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 41.000 $150.000 $165.000 $105.550 $130.000 $140.400
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
EA 8.000 $205.000 $475.960 $316.650 $375.000 $405.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 13.000 $190.000 $266.540 $211.100 $210.000 $226.800
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 3,224.000 $6.100 $9.520 $6.850 $7.500 $8.100
REFL PAV MRKR TY I-C
EA 368.000 $3.850 $5.080 $3.950 $4.000 $4.320
REFL PAV MRKR TY II-A-A
EA 3,391.000 $3.850 $5.080 $3.950 $4.000 $4.320
ELIM EXT PAV MRK & MRKS (4")
LF 70,753.000 $2.000 $0.950 $0.750 $0.750 $0.810
D-GR HMA TY-B SAC-B PG64-22
TON 15,768.000 $92.000 $97.870 $98.000 $125.000 $118.550
SP MIXES SP-D SAC-A PG70-28
TON 10,598.000 $112.000 $111.300 $112.000 $140.000 $131.770
TACK COAT
GAL 9,670.000 $4.000 $5.850 $5.000 $5.000 $8.120
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,757.000 $25,777.380 $23,500.000 $15,000.000 $5,365.040
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
LF 67,872.000 $0.350 $0.490 $0.400 $0.390 $0.420
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 210,142.000 $0.300 $0.490 $0.400 $0.390 $0.420
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
LF 51,536.000 $0.350 $0.490 $0.400 $0.390 $0.420
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 155,992.000 $0.300 $0.490 $0.400 $0.390 $0.420
TMA (STATIONARY)
DAY 390.000 $375.000 $412.420 $375.000 $250.000 $437.650
TMA (MOBILE OPERATION)
HR 90.000 $90.000 $98.200 $75.000 $95.000 $116.930
Totals: $8,577,014.950 $9,215,103.341 $9,367,148.170 $10,198,442.290 $10,690,912.164