Show Job Controls
Bid Cobra

POTTER IH 40 (0275-01-229)

Items: 37

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0275-01-229
DBE Goal: N/A
Project: BR 2023(596)
Guaranty: N/A
Time: 175 WORKING DAYS
Engineer's Estimate: $11,723,292.00
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$11,723,292.00
$8,159,181.05
Over/Under Est: -30.4% -$3,564,110.95
Over/Under Est: -22.64% -$2,654,223.00
Amt Left: 11.15% $909,887.95
Over/Under Est: -17.29% -$2,027,292.00
Amt Left: 18.84% $1,536,818.95
Delta: -6.91% -$626,931.00
Over/Under Est: -6.54% -$766,939.10
Amt Left: 34.28% $2,797,171.85
Delta: -13.00% -$1,260,352.90
$13,019,988.00
Over/Under Est: 11.06% $1,296,696.00
Amt Left: 59.57% $4,860,806.95
Delta: -18.84% -$2,063,635.10
$13,984,348.00
Over/Under Est: 19.29% $2,261,056.00
Amt Left: 71.39% $5,825,166.95
Delta: -7.41% -$964,360.00
Subcontractor Percentage Amount
MACIAS SPECIALTY CONTRACTING LLC 5.90% $496,689.60
TRP CONSTRUCTION GROUP, LLC 3.40% $286,227.91
A-CORE CONCRETE CUTTING, INC. 2.60% $218,880.16
J.H. PAINTING COMPANY 0.67% $56,403.73
FC TRAFFIC CONTROL, INC. 0.63% $53,036.35
SOUTHEAST GRINDING AND GROOVING LLC 0.51% $42,934.19
ALAMO BROTHERS CONCRETE INC 0.22% $18,520.63
Total: 13.93% $1,172,692.57

Bid Items & Bid Tabulations

37 Total 0 of 37
POTTER  |  IH 40  |  AMARILLO  |  0275-01-229  |  04/04/2023  |  $11,723,292.00  |  BR 2023(596)  |  BRIDGE MAINT  |  175 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
THE TRUESDELL CORPORATION
AMERICAN CIVIL CONSTRUCTORS WEST COAST LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
FNH CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOVE CONC (RAIL)
LF 23.000 $150.000 $400.000 $500.000 $1,600.000 $1,000.000 $150.000 $300.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 19.000 $425.000 $750.000 $2,000.000 $2,100.000 $5,000.000 $5,000.000 $1,000.000
EPOXY WATERPROOF FINISH (TY X)
SF 25,060.000 $12.000 $5.000 $9.500 $7.750 $10.000 $15.000 $30.000
CONC STR REPAIR (EPOXY MORTAR)
SF 284.000 $160.000 $200.000 $191.000 $250.000 $500.000 $500.000 $300.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 76.000 $240.000 $400.000 $215.000 $400.000 $500.000 $500.000 $300.000
CNC STR REP(ULTR RPD DCK REP)(TYB)(P D)
SF 144.000 $240.000 $90.000 $175.000 $200.000 $500.000 $500.000 $300.000
CLEANING AND SEALING EXISTING JOINTS
LF 2,656.000 $105.000 $98.000 $103.000 $67.000 $100.000 $100.000 $100.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,905.000 $75.000 $65.000 $47.000 $50.000 $100.000 $100.000 $100.000
CLEANING EXISTING JOINTS
LF 158.000 $15.000 $5.000 $63.000 $25.000 $100.000 $100.000 $90.000
RESIZING AND SEALING JOINTS
LF 70.000 $200.000 $100.000 $141.000 $150.000 $100.000 $100.000 $100.000
RAIL (TY SSTR)
LF 13.000 $500.000 $640.000 $250.000 $900.000 $5,000.000 $250.000 $1,500.000
RAIL (TY SSTR)(MOD)
LF 10.000 $500.000 $640.000 $250.000 $925.000 $5,000.000 $250.000 $1,500.000
MOBILIZATION
LS 1.000 $1,050,000.000 $382,000.000 $809,221.000 $900,000.000 $1,000,000.000 $1,300,000.000 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $44,000.000 $7,500.000 $11,800.000 $30,000.000 $40,000.000 $15,000.000 $150,000.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,925.000 $2.000 $2.500 $5.250 $2.000 $2.000 $6.000 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 465.000 $2.000 $2.500 $4.350 $2.000 $2.000 $6.000 $1.500
PREFAB PAV MRK TY B (W)(8")(SLD)
LF 360.000 $18.000 $12.100 $11.700 $12.000 $12.000 $6.000 $11.000
PREFAB PAV MRK TY B (W)(12")(LNDP)
LF 586.000 $18.000 $20.900 $20.250 $20.000 $20.000 $20.000 $19.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 2,061.000 $18.000 $17.600 $17.000 $17.000 $18.000 $6.000 $16.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 48.000 $24.000 $44.000 $45.000 $42.000 $34.000 $20.000 $40.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $400.000 $880.000 $1,000.000 $850.000 $725.000 $250.000 $800.000
PREFAB PAV MRK TY B (W)(WORD)
EA 2.000 $400.000 $1,100.000 $1,500.000 $1,400.000 $1,250.000 $250.000 $1,000.000
DRAIN INLET CLEANING
EA 74.000 $1,200.000 $250.000 $160.000 $260.000 $5,000.000 $2,500.000 $1,000.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 8.000 $500.000 $500.000 $2,100.000 $2,500.000 $5,000.000 $500.000 $1,000.000
BRIDGE JOINT REPAIR (SEJ)
LF 48.000 $500.000 $900.000 $530.000 $900.000 $1,000.000 $2,500.000 $1,000.000
CONCRETE BEAM REPAIR
EA 42.000 $3,200.000 $2,200.000 $950.000 $3,500.000 $5,000.000 $20,000.000 $4,000.000
CONTINUOUS DIAMOND GRINDING CONC PVMT
SY 4,345.000 $12.000 $12.800 $16.500 $17.500 $15.000 $50.000 $75.000
POLYESTER POLYMER CONC OVERLAY (1")
SY 55,253.000 $126.000 $95.750 $112.000 $108.000 $108.800 $130.000 $125.000
POLYESTER POLYMER CONC OVERLAY
CY 285.000 $5,100.000 $3,675.000 $1,863.000 $3,740.000 $3,851.700 $5,000.000 $5,400.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $14,000.000 $18,000.000 $12,000.000 $15,000.000 $18,500.000 $20,000.000
PREFB PV MK W/WNTY TY B (W)(6")(BRK)
LF 900.000 $6.000 $11.000 $11.000 $11.500 $12.000 $6.000 $10.000
PREFB PV MK W/WNTY TY B (W)(6")(SLD)
LF 8,637.000 $18.000 $9.900 $9.500 $10.000 $11.000 $6.000 $9.000
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 4,450.000 $24.000 $15.400 $14.750 $15.500 $15.000 $6.000 $14.000
PREFB PV MK W/WNTY TY B (Y)(6")(SLD)
LF 9,280.000 $18.000 $9.900 $9.500 $10.000 $12.000 $6.000 $9.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $14,000.000 $7,000.000 $9,000.000 $8,106.750 $15,000.000 $35,000.000 $15,000.000
TMA (STATIONARY)
DAY 170.000 $330.000 $525.000 $425.000 $250.000 $300.000 $250.000 $950.000
TMA (MOBILE OPERATION)
HR 120.000 $100.000 $105.000 $10.000 $150.000 $75.000 $85.000 $95.000
Totals: $11,723,292.000 $8,159,181.050 $9,069,069.000 $9,696,000.000 $10,956,352.900 $13,019,988.000 $13,984,348.000