Show Job Controls
Bid Cobra

POTTER IH 40 (0275-01-215)

Items: 49

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0275-01-215
DBE Goal: N/A
Project: C 275-1-215
Guaranty: N/A
Time: 383 WORKING DAYS
Engineer's Estimate: $4,447,234.00
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,447,234.00
$4,539,711.25
Over/Under Est: 2.08% $92,477.25
$5,693,333.00
Over/Under Est: 28.02% $1,246,099.00
Amt Left: 25.41% $1,153,621.75
$6,383,014.73
Over/Under Est: 43.53% $1,935,780.73
Amt Left: 40.6% $1,843,303.48
Delta: -12.11% -$689,681.73

Bid Items & Bid Tabulations

49 Total 0 of 49
POTTER  |  IH 40  |  AMARILLO  |  0275-01-215  |  07/08/2020  |  $4,447,234.00  |  C 275-1-215  |  HAZARD ELIM & SAFETY  |  383 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
WEBBER, LLC
ALTUS CONSTRUCTION LLC
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 17.000 $1,000.000 $1,000.000 $2,595.000 $2,570.730
REMOVING CONC (CURB)
LF 3,412.000 $10.000 $30.000 $22.750 $6.750
REMOVING CONC (CTB)
LF 50.000 $40.000 $1,055.000 $55.500 $33.570
DRILL SEEDING (PERM) (URBAN) (CLAY)
AC 1.380 $1,200.000 $1,500.000 $2,800.000 $690.510
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 1.380 $700.000 $1,500.000 $2,800.000 $492.450
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 6,680.000 $5.000 $1.500 $3.000 $2.400
CL C CONC (RAIL FOUNDATION)
CY 73.000 $600.000 $1,200.000 $935.000 $613.780
CONCRETE PAINT FINISH
SF 121,405.000 $0.600 $0.470 $2.000 $0.830
RIPRAP (CONC)(4 IN)
CY 936.000 $500.000 $475.000 $585.000 $767.230
RIPRAP (MOW STRIP)(4 IN)
CY 184.000 $500.000 $645.000 $725.000 $767.230
RAIL (TY T80SS)
LF 136.000 $200.000 $300.000 $225.000 $186.020
REMOV STR (DRILL SHAFT)
EA 4.000 $2,000.000 $8,500.000 $1,980.000 $2,427.900
MOBILIZATION
LS 1.000 $315,000.000 $450,000.000 $560,000.000 $636,799.340
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $18,500.000 $15,750.000 $27,725.000 $30,689.120
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 700.000 $5.000 $10.000 $7.750 $7.650
BIODEG EROSN CONT LOGS (REMOVE)
LF 700.000 $2.000 $6.000 $1.250 $2.100
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 14,624.000 $100.000 $75.000 $122.750 $149.470
PERM CTB (F-SHAPE) (TY 1)
LF 30.000 $200.000 $400.000 $450.000 $383.610
PERM CTB (F-SHAPE)(SPL)
LF 20.000 $200.000 $400.000 $635.000 $383.610
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
LF 490.000 $200.000 $200.000 $495.000 $383.610
PERM CTB (TRAN CTB TO SSTR)(MOD)
LF 14.000 $200.000 $400.000 $540.000 $383.610
MTL W-BEAM GD FEN (STEEL POST)
LF 675.000 $28.000 $160.000 $28.000 $39.130
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 24.000 $2,000.000 $2,600.000 $3,000.000 $3,222.360
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,300.000 $3,500.000 $1,750.000 $2,109.880
REMOVE METAL BEAM GUARD FENCE
LF 14,995.000 $4.000 $16.000 $4.000 $4.600
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $400.000 $2,000.000 $500.000 $460.340
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,000.000 $4,000.000 $3,500.000 $3,775.680
GUARDRAIL END TREATMENT (REMOVE)
EA 27.000 $350.000 $1,370.000 $400.000 $405.960
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $2,000.000 $4,000.000 $2,467.000 $1,202.290
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $50,000.000 $34,000.000 $18,355.000 $34,317.200
REPLACE LUMINAIRE W/LED (150W EQ)
EA 99.000 $500.000 $1,023.000 $600.000 $688.600
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 39.000 $30.000 $15.000 $25.000 $30.690
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 39.000 $30.000 $15.000 $27.000 $30.690
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 63.000 $40.000 $30.000 $35.000 $53.710
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 54.000 $40.000 $30.000 $37.000 $53.710
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,500.000 $2.000 $1.400 $2.000 $2.150
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 1,536.000 $5.000 $2.250 $3.000 $3.450
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 7,270.000 $3.500 $2.250 $3.000 $3.450
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 9,740.000 $1.000 $0.310 $0.500 $0.480
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 930.000 $2.000 $1.000 $1.250 $1.530
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 9,580.000 $1.000 $0.310 $0.500 $0.480
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,000.000 $15,000.000 $15,700.000 $13,344.940
PREFB PV MK W/WNTY TY B(W)4"(SLD)CNTST
LF 39,650.000 $7.000 $5.090 $5.500 $7.810
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 16,470.000 $7.000 $6.400 $6.500 $9.820
PREFB PV MK W/WNTY TY B(Y)4"(SLD)CNTST
LF 39,310.000 $7.000 $5.090 $5.650 $7.810
PREFB PV MK W/WNTY TY B(W)6"(DOT)CNTST
LF 312.000 $7.000 $6.400 $8.000 $9.820
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
EA 11.000 $10,000.000 $12,840.000 $22,125.000 $13,505.620
TMA (STATIONARY)
DAY 300.000 $500.000 $400.000 $265.000 $537.060
TMA (MOBILE OPERATION)
HR 150.000 $60.000 $30.000 $80.000 $191.810
Totals: $4,447,234.000 $4,539,711.250 $5,693,333.000 $6,383,014.735