Bid Cobra

POTTER IH 40 (0275-01-205)

Items: 87

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0275-01-205
DBE Goal: N/A
Project: BR 2020(793)
Guaranty: N/A
Time: 440 WORKING DAYS
Engineer's Estimate: $14,312,032.02
Date: 05/08/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE AND REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$14,312,032.02
$15,820,658.82
Over/Under Est: 10.54% $1,508,626.80
$16,234,820.96
Over/Under Est: 13.43% $1,922,788.94
Amt Left: 2.62% $414,162.14
Over/Under Est: 26.22% $3,753,299.98
Amt Left: 14.19% $2,244,673.18
Delta: -11.28% -$1,830,511.04
Over/Under Est: 93.51% $13,382,957.63
Amt Left: 75.06% $11,874,330.83
Delta: -53.30% -$9,629,657.65

Bid Items & Bid Tabulations

87 Total 0 of 87
POTTER  |  IH 40  |  AMARILLO  |  0275-01-205  |  05/08/2020  |  $14,312,032.02  |  BR 2020(793)  |  BRIDGE MAINT AND REPAIR  |  440 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
GILVIN-TERRILL, LTD.
SOUTHERN ROAD & BRIDGE, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
REMOVING CONC (RIPRAP)
SY 743.000 $30.000 $60.000 $100.000 $15.000 $35.000
REMOVING CONC (CTB)
LF 170.000 $50.000 $85.000 $150.000 $35.000 $70.000
REMOVING CONCRETE(MOW STRIP)
LF 700.000 $14.000 $19.000 $100.000 $15.000 $15.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 2,066.000 $1.000 $1.980 $3.000 $4.000 $2.700
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 2,066.000 $1.000 $1.980 $3.000 $3.000 $2.200
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 2,066.000 $3.000 $1.980 $4.000 $4.000 $3.300
PLANE ASPH CONC PAV(0" TO 3")
SY 8,860.000 $5.000 $7.700 $5.000 $4.000 $25.000
PLANE ASPH CONC PAV (2")
SY 19,500.000 $4.000 $5.120 $7.000 $4.000 $10.000
PLANE ASPH CONC PAV (1.25" TO 6.50")
SY 2,642.000 $20.000 $19.360 $10.000 $6.000 $50.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 160.000 $2,000.000 $6,200.000 $4,000.000 $4.000 $13,000.000
REINF CONC SLAB (HPC)
SF 52,948.000 $27.000 $71.000 $40.000 $30.000 $122.000
APPROACH SLAB (HPC)
CY 560.800 $1,000.000 $2,000.000 $2,000.000 $1,100.000 $1,500.000
SILICONE RESIN PAINT FINISH
SF 6,640.000 $10.000 $7.450 $10.000 $14.000 $7.400
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 1,406.000 $300.000 $42.500 $300.000 $188.000 $160.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 824.000 $500.000 $135.000 $420.000 $300.000 $334.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 5,176.000 $225.000 $190.000 $150.000 $225.000 $180.000
RIPRAP (CONC)(4 IN)
CY 83.000 $475.000 $1,300.000 $700.000 $1,000.000 $1,600.000
RIPRAP (MOW STRIP)(4 IN)
CY 110.000 $475.000 $955.000 $700.000 $1,000.000 $1,600.000
CONCRETE OVERLAY (2.5 IN)
SY 8,860.000 $150.000 $52.000 $100.000 $115.000 $140.000
CL CO CONC OVRLY(STL FBR REIN)(2 1/4IN)
SY 510.000 $180.690 $94.000 $100.000 $200.000 $540.000
CL CO CONC OVRLY(STL FBR REIN)(5 1/2IN)
SY 2,132.000 $180.690 $111.000 $150.000 $200.000 $320.000
STR STEEL (SHEAR CONNECTOR)
LB 20,800.000 $14.000 $2.250 $10.000 $11.000 $33.000
CLEAN & PAINT EXIST STR (SYSTEM I-A)
LS 4.000 $10,000.000 $195,493.100 $150,000.000 $656,000.000 $270,000.000
RAIL (TY T80SS)(HPC)
LF 2,060.000 $85.000 $150.000 $90.000 $44.000 $300.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 464.000 $130.000 $137.500 $150.000 $158.000 $300.000
HYDRO-DEMOLITION (1/2 IN)
SY 10,992.000 $90.000 $53.000 $100.000 $100.000 $42.000
HYDRO-DEMOLITION (1 1/2 IN)
SY 510.000 $90.000 $60.000 $100.000 $125.000 $95.000
REMOV STR (BRIDGE SLAB)
EA 4.000 $300,000.000 $154,500.000 $350,000.000 $220,000.000 $400,000.000
MOBILIZATION
LS 1.000 $1,065,000.000 $1,400,000.000 $1,545,000.000 $1,800,000.000 $2,526,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 21.000 $20,000.000 $20,250.000 $50,000.000 $20,000.000 $40,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 350.000 $9.000 $5.500 $10.000 $8.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 350.000 $1.250 $1.100 $5.000 $2.000 $1.100
CONSTRUCTING DETOURS
SY 19,014.000 $35.000 $32.730 $21.080 $78.000 $68.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 8,320.000 $11.000 $18.500 $10.000 $30.000 $50.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 8,320.000 $5.000 $37.000 $10.000 $21.000 $24.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 8,320.000 $11.000 $18.500 $10.000 $22.000 $13.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 170.000 $200.000 $330.000 $175.000 $65.000 $2,000.000
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
LF 249.000 $200.000 $150.000 $100.000 $125.000 $2,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,050.000 $30.000 $27.500 $30.000 $44.000 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $1,760.000 $2,800.000 $3,800.000 $3,060.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,200.000 $1,650.000 $2,000.000 $3,000.000 $2,190.000
MTL BM GD FEN TRANS (NON - SYM)
EA 5.000 $1,500.000 $1,430.000 $1,000.000 $2,500.000 $1,090.000
REMOVE METAL BEAM GUARD FENCE
LF 2,175.000 $4.000 $3.300 $4.000 $6.000 $15.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $500.000 $330.000 $400.000 $650.000 $2,000.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $250.000 $330.000 $500.000 $650.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,000.000 $3,520.000 $4,000.000 $6,500.000 $4,375.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $350.000 $330.000 $550.000 $800.000 $2,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 12.000 $2,000.000 $2,200.000 $5,050.000 $3,800.000 $3,060.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,200.000 $1,650.000 $1,750.000 $2,500.000 $1,640.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $15,000.000 $10,000.000 $16,475.000 $9,500.000 $11,000.000
RELOCATE RD IL ASM (CTB MOUNT)
EA 6.000 $5,000.000 $3,025.000 $2,750.000 $3,800.000 $3,000.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 12.000 $1,000.000 $1,320.000 $1,200.000 $2,200.000 $1,300.000
CONDT (PVC) (SCH 40) (2")
LF 1,730.000 $10.000 $16.500 $15.000 $22.000 $16.400
ELEC CONDR (NO.8) BARE
LF 2,505.000 $2.000 $2.750 $2.500 $4.000 $2.750
ELEC CONDR (NO.8) INSULATED
LF 5,010.000 $3.000 $3.300 $3.000 $5.000 $3.300
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,500.000 $500.000 $2,000.000 $3,200.000 $2,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $1,500.000 $500.000 $2,000.000 $3,200.000 $2,200.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $250.000 $500.000 $1,000.000 $550.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 32.000 $35.000 $22.000 $20.000 $50.000 $12.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 32.000 $20.000 $22.000 $20.000 $50.000 $12.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 59.000 $40.000 $41.250 $150.000 $225.000 $15.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 7,850.000 $0.800 $1.650 $1.500 $3.000 $1.600
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 34,890.000 $0.800 $0.940 $0.850 $2.000 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 40,740.000 $1.000 $0.940 $0.850 $2.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 5,330.000 $1.500 $1.290 $1.170 $2.000 $1.300
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 420.000 $2.500 $1.930 $1.750 $3.000 $1.900
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 21,310.000 $0.750 $0.650 $0.590 $1.000 $0.650
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 10,310.000 $1.100 $0.970 $0.880 $2.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 21,250.000 $0.750 $0.650 $0.590 $1.000 $0.650
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 314.000 $2.500 $1.940 $1.760 $3.000 $2.000
REFL PAV MRKR TY II-C-R
EA 1,148.000 $5.000 $3.850 $3.500 $5.000 $3.800
ELIM EXT PAV MRK & MRKS (4")
LF 53,510.000 $1.250 $0.720 $0.650 $1.100 $0.700
ELIM EXT PAV MRK & MRKS (8")
LF 4,430.000 $2.500 $1.430 $1.300 $2.000 $1.400
PAV SURF PREP FOR MRK (4")
LF 42,560.000 $0.500 $0.300 $0.270 $1.000 $0.300
PAV SURF PREP FOR MRK (6")
LF 10,310.000 $0.750 $0.440 $0.400 $1.000 $0.440
PAV SURF PREP FOR MRK (8")
LF 5,330.000 $1.000 $0.590 $0.540 $1.000 $0.600
PAV SURF PREP FOR MRK (12")
LF 734.000 $2.000 $1.100 $1.000 $2.000 $1.100
CONCRETE RAIL REPAIR (TYPE 501)
LF 26.000 $200.000 $260.000 $250.000 $500.000 $1,400.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 200.000 $200.000 $120.000 $55.000 $222.000 $165.000
BRIDGE JOINT REPLACEMENT (HEADER)
LF 1,322.000 $291.070 $200.000 $150.000 $222.000 $160.000
CONCRETE BEAM REPAIR
EA 97.000 $5,000.000 $1,100.000 $1,500.000 $5,650.000 $12,000.000
SP MIXES SP-C PG70-28
TON 2,688.000 $220.000 $164.560 $245.000 $244.000 $110.000
TACK COAT
GAL 2,925.000 $4.000 $5.940 $6.000 $10.000 $3.300
REPLACE ELASTOMERIC BEARING PADS
EA 34.000 $3,000.000 $5,450.000 $610.000 $10,000.000 $5,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $16,000.000 $25,000.000 $12,500.000 $1,000.000 $30,000.000
TMA (STATIONARY)
DAY 240.000 $600.000 $250.000 $950.000 $100.000 $11.000
TMA (MOBILE OPERATION)
HR 1,600.000 $100.000 $105.000 $95.000 $1.000 $105.000
Totals: $14,312,032.020 $15,820,658.820 $16,234,820.960 $18,065,332.000 $27,694,989.650