Job Info for 0090-05-107

County: POTTER Highway: IH 40 Date: 03/05/2024 (8 months ago) Engineer's Estimate: $9,565,794 Control Number: 0090-05-107
Project: BR 2024(779) District: AMARILLO Time: 182 WORKING DAYS Type: BRIDGE REPLACEMENT
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,565,794.00
ALTUS CONSTRUCTION LLC   $10,246,889.59 1
7.12% | $681,095.59
COPPELL CONSTRUCTION CO., INC.   $10,650,047.20 2
11.33% | $1,084,253.20
3.93% | $403,157.61
L A FULLER & SONS CONSTRUCTION, LTD.   $11,565,191.51 3
20.9% | $1,999,397.51
12.87% | $1,318,301.92
8.59% | $915,144.31
GILVIN-TERRILL, LTD.   $11,687,192.95 4
22.18% | $2,121,398.95
14.06% | $1,440,303.36
1.05% | $122,001.44
Subcontractor Percentage Amount
L A FULLER & SONS CONSTRUCTION, LTD. 10.69% $1,095,392.50
SQUARE CONTRACTING INC 8.64% $885,331.26
LINDAMOOD, INC. 1.65% $169,073.68
TORO BRAVO CONSTRUCTION, LLC 0.75% $76,851.67
CROSSBAR LOGISTICS LLC 0.34% $34,839.42
TRP CONSTRUCTION GROUP, LLC 0.31% $31,765.36
DK CONTRACTING, LLC 0.26% $26,641.91
MARRS ELECTRIC LLC 0.17% $17,419.71
Total: 22.81% $2,337,315.51

Bid Items

Items: 112, 0 filtered
POTTER IH 40  |  AMARILLO  |  0090-05-107  |  03/05/2024  |  $9,565,794  |  BR 2024(779)  |  BRIDGE REPL  |  182 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ALTUS CONSTRUCTION LLC COPPELL CONSTRUCTION CO., INC. L A FULLER & SONS CONSTRUCTION, LTD. GILVIN-TERRILL, LTD.
104 6009 REMOVING CONC (RIPRAP) SY 900.000 $32.000 $29.600 $25.000 $27.250 $20.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 1,452.000 $10.000 $21.110 $15.000 $21.850 $10.000
105 6036 REMOVING STAB BASE & ASPH PAV(15"-20") SY 697.000 $18.000 $10.160 $18.500 $40.360 $25.000
110 6001 EXCAVATION (ROADWAY) CY 3,453.000 $10.000 $17.080 $27.000 $43.910 $10.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 15,770.000 $22.000 $9.050 $48.000 $38.590 $75.000
150 6002 BLADING HR 8.000 $250.000 $153.900 $290.000 $146.440 $310.000
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 27,860.000 $0.700 $0.630 $0.600 $0.880 $0.700
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 3,299.000 $4.000 $3.680 $3.500 $1.840 $3.500
247 6258 FL BS (CMP IN PLC)(TY A OR B GR4)(12") SY 2,202.000 $25.000 $35.830 $52.000 $35.040 $60.000
354 6002 PLAN & TEXT ASPH CONC PAV(0" TO 2") SY 6,250.000 $5.000 $7.430 $1.750 $4.820 $5.000
400 6005 CEM STABIL BKFL CY 625.000 $450.000 $177.030 $235.000 $225.800 $500.000
402 6001 TRENCH EXCAVATION PROTECTION LF 218.000 $12.000 $9.870 $30.000 $7.120 $50.000
403 6001 TEMPORARY SPL SHORING SF 6,309.000 $50.000 $65.270 $67.000 $53.490 $60.000
416 6001 DRILL SHAFT (18 IN) LF 250.000 $275.000 $431.850 $102.000 $260.030 $150.000
416 6002 DRILL SHAFT (24 IN) LF 12.000 $300.000 $571.960 $395.000 $410.120 $300.000
416 6004 DRILL SHAFT (36 IN) LF 1,397.000 $500.000 $524.880 $250.000 $310.700 $300.000
416 6006 DRILL SHAFT (48 IN) LF 517.000 $600.000 $699.900 $450.000 $438.020 $500.000
420 6011 CL B CONC (FLUME) CY 19.000 $800.000 $986.540 $650.000 $1,374.160 $900.000
420 6013 CL C CONC (ABUT) CY 92.700 $2,000.000 $1,186.590 $1,300.000 $2,705.320 $2,000.000
420 6029 CL C CONC (CAP) CY 51.800 $2,500.000 $3,057.220 $1,400.000 $3,531.450 $2,000.000
420 6037 CL C CONC (COLUMN) CY 84.300 $2,500.000 $1,296.360 $2,300.000 $2,169.960 $2,000.000
420 6066 CL C CONC (RAIL FOUNDATION) CY 150.000 $600.000 $1,718.570 $865.000 $651.590 $650.000
422 6001 REINF CONC SLAB SF 19,994.000 $48.000 $30.540 $32.000 $50.000 $55.000
422 6011 BRIDGE MEDIAN SF 1,251.000 $33.000 $9.570 $25.000 $15.150 $12.000
422 6013 BRIDGE SIDEWALK SF 3,253.000 $33.000 $37.600 $25.000 $12.160 $36.000
422 6015 APPROACH SLAB CY 330.500 $1,800.000 $730.480 $775.000 $632.380 $2,000.000
423 6001 RETAINING WALL (MSE) SF 13,071.000 $94.000 $112.640 $100.000 $175.010 $75.000
425 6024 PRESTR CONC BOX BEAM (5XB34) LF 2,157.690 $400.000 $576.050 $505.000 $474.980 $480.000
427 6007 EPOXY WATERPROOF FINISH (TY X) SF 991.000 $21.000 $5.260 $15.000 $20.060 $30.000
432 6001 RIPRAP (CONC)(4 IN) CY 5.000 $1,200.000 $749.770 $730.000 $1,042.980 $700.000
432 6044 RIPRAP (CONC)(FLUME) CY 81.000 $800.000 $429.270 $650.000 $656.540 $670.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 51.000 $650.000 $914.850 $650.000 $660.980 $670.000
442 6007 STR STEEL (MISC NON - BRIDGE) LB 341.000 $32.000 $22.160 $42.000 $35.210 $20.000
450 6023 RAIL (TY SSTR) LF 1,111.600 $135.000 $301.380 $220.000 $449.980 $125.000
450 6030 RAIL (TY C221) LF 381.000 $200.000 $113.550 $275.000 $544.980 $140.000
454 6007 HEADER TYPE EXPANSION JOINT LF 232.000 $225.000 $107.000 $160.000 $304.310 $150.000
460 6003 CMP (GAL STL 24 IN) LF 90.000 $135.000 $65.700 $106.000 $71.570 $50.000
460 6006 CMP (GAL STL 42 IN) LF 155.000 $170.000 $146.810 $162.000 $135.530 $70.000
462 6045 CONC BOX CULV (3 FT X 2 FT)(EXTEND) LF 9.000 $600.000 $690.580 $2,370.000 $751.620 $2,500.000
464 6005 RC PIPE (CL III)(24 IN) LF 194.000 $150.000 $124.700 $275.000 $134.480 $200.000
464 6007 RC PIPE (CL III)(30 IN) LF 8.000 $200.000 $170.470 $575.000 $437.010 $250.000
465 6562 INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT) EA 3.000 $8,000.000 $12,141.540 $22,000.000 $12,950.510 $12,000.000
467 6580 SET (REMOV & REINSTALL) EA 1.000 $2,000.000 $493.270 $3,000.000 $12,109.420 $5,200.000
480 6001 CLEAN EXIST CULVERTS EA 2.000 $2,000.000 $2,565.000 $7,700.000 $2,015.970 $2,600.000
496 6002 REMOV STR (INLET) EA 2.000 $1,000.000 $1,085.190 $5,000.000 $4,658.360 $1,300.000
496 6007 REMOV STR (PIPE) LF 97.000 $50.000 $24.660 $70.000 $48.020 $30.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $260,000.000 $253,993.110 $275,000.000 $301,050.600 $1,000,000.000
500 6001 MOBILIZATION LS 1.000 $800,000.000 $1,004,192.410 $1,000,000.000 $1,048,675.000 $1,100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 9.000 $19,000.000 $2,776.780 $40,000.000 $32,440.000 $50,000.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 156.000 $50.000 $31.570 $80.000 $44.820 $72.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 156.000 $18.000 $10.850 $25.000 $32.910 $25.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 140.000 $9.000 $4.100 $11.000 $3.580 $12.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 140.000 $2.000 $0.990 $1.300 $1.450 $2.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 140.000 $12.000 $6.810 $12.000 $3.710 $12.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 140.000 $2.000 $1.640 $1.300 $1.630 $2.000
508 6004 CONSTRUCTING DETOURS (TY 2) SY 32,789.000 $19.500 $32.530 $39.000 $19.680 $22.000
512 6017 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) LF 600.000 $30.000 $35.190 $29.000 $27.410 $12.000
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 600.000 $30.000 $38.000 $31.000 $23.610 $12.000
514 6003 PERM CTB (SGL SLOPE) (TY 3) (42 ) LF 370.000 $200.000 $382.420 $470.000 $457.480 $275.000
529 6008 CONC CURB & GUTTER (TY II) LF 270.000 $35.000 $53.520 $80.000 $39.420 $50.000
531 6003 CONC SIDEWALKS (6") SY 69.000 $99.000 $126.520 $95.000 $69.480 $125.000
531 6015 CURB RAMPS (TY 20) EA 2.000 $2,000.000 $3,896.830 $5,500.000 $2,478.720 $1,800.000
536 6002 CONC MEDIAN SY 58.000 $140.000 $147.980 $90.000 $64.910 $120.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 50.000 $45.000 $52.430 $40.000 $69.160 $37.250
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $3,000.000 $4,327.950 $3,500.000 $4,464.010 $3,075.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,275.000 $5.000 $4.220 $3.500 $4.090 $3.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $500.000 $562.990 $450.000 $1,112.860 $400.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 4.000 $500.000 $197.310 $450.000 $465.260 $400.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 2.000 $220.000 $562.990 $450.000 $465.260 $400.000
543 6001 CABLE BARRIER SYSTEM (TL-3) LF 856.000 $25.000 $28.150 $23.000 $31.910 $20.000
543 6022 REMOVE CABLE BARRIER TERMINAL SECTION EA 1.000 $500.000 $3,518.660 $2,500.000 $1,921.400 $2,500.000
543 6024 INSTALL SALVAGE CABLE BAR TERM SECTION EA 1.000 $3,000.000 $6,333.580 $4,500.000 $3,842.710 $4,500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $3,500.000 $4,961.310 $4,100.000 $4,904.120 $3,525.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 1.000 $1,500.000 $3,518.660 $3,000.000 $2,420.360 $3,500.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 3.000 $10,000.000 $8,436.880 $8,700.000 $12,444.380 $10,500.000
610 6106 IN RD IL (U/P) (TY 2) (150W EQ) LED EA 4.000 $1,850.000 $1,269.810 $5,700.000 $2,209.370 $3,650.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 220.000 $23.000 $18.600 $75.000 $31.440 $24.000
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 80.000 $40.000 $31.570 $190.000 $47.780 $38.000
618 6062 CONDT (RM) (3/4") LF 220.000 $29.000 $29.770 $140.000 $62.870 $21.000
620 6003 ELEC CONDR (NO.12) BARE LF 240.000 $1.800 $1.180 $16.000 $1.260 $2.500
620 6004 ELEC CONDR (NO.12) INSULATED LF 480.000 $2.000 $1.460 $16.000 $1.320 $2.500
620 6007 ELEC CONDR (NO.8) BARE LF 325.000 $2.500 $1.970 $16.000 $2.010 $3.500
620 6008 ELEC CONDR (NO.8) INSULATED LF 650.000 $3.000 $1.970 $16.000 $5.030 $4.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 2.000 $1,900.000 $1,312.950 $7,000.000 $3,017.920 $2,000.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 1.000 $900.000 $1,383.790 $1,135.000 $1,322.850 $1,100.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $1,150.000 $1,220.680 $1,100.000 $1,166.930 $1,000.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $1,300.000 $1,632.390 $1,135.000 $1,560.520 $1,300.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 5.000 $1,150.000 $1,273.290 $1,125.000 $1,217.230 $1,000.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 5.000 $1,400.000 $1,585.040 $1,340.000 $1,515.250 $1,250.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 $1,500.000 $1,783.660 $1,550.000 $1,705.120 $1,400.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 2.000 $1,200.000 $4,618.320 $3,800.000 $4,414.960 $4,000.000
644 6076 REMOVE SM RD SN SUP&AM EA 6.000 $200.000 $140.750 $100.000 $157.180 $100.000
647 6002 RELOCATE LRSA EA 1.000 $5,500.000 $2,312.450 $5,000.000 $2,210.620 $1,800.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 6.000 $42.000 $60.420 $43.000 $188.620 $45.000
658 6071 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA 15.000 $46.000 $87.260 $62.000 $188.620 $65.000
666 6006 REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF 54.000 $1.500 $3.950 $3.000 $3.770 $3.000
666 6063 REFL PAV MRK TY I(W)(UTURN ARW)(100MIL) EA 2.000 $300.000 $526.150 $400.000 $502.990 $400.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 2.000 $300.000 $460.390 $350.000 $440.120 $350.000
668 6033 PREFAB PAV MRK TY B (W)(18")(YLD TRI) EA 8.000 $57.000 $98.650 $75.000 $94.310 $75.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 62.000 $20.000 $26.310 $20.000 $25.150 $20.000
672 6010 REFL PAV MRKR TY II-C-R EA 146.000 $7.000 $9.210 $7.000 $8.800 $7.000
678 6002 PAV SURF PREP FOR MRK (6") LF 1,500.000 $0.250 $1.320 $1.000 $1.260 $1.000
678 6004 PAV SURF PREP FOR MRK (8") LF 676.000 $0.250 $2.300 $1.750 $2.200 $1.750
3077 6058 SP MIXES SP-D SAC-A PG70-28 TON 865.000 $160.000 $341.380 $250.000 $215.000 $185.000
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 2.000 $1,100.000 $2,111.190 $1,500.000 $952.460 $2,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $18,000.000 $24,860.790 $25,000.000 $29,755.410 $18,500.000
6024 6008 HPPM W/RET REQ TY I(W)6"(BRK)(090MIL) LF 1,640.000 $1.000 $1.640 $1.250 $1.570 $1.250
6024 6011 HPPM W/RET REQ TY I(W)6"(SLD)(090MIL) LF 10,350.000 $1.000 $0.760 $1.000 $1.260 $1.000
6024 6012 HPPM W/RET REQ TY I(W)6"(SLD)(100MIL) LF 1,777.000 $1.000 $1.640 $1.250 $1.570 $1.250
6024 6023 HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL) LF 10,405.000 $1.000 $1.320 $1.000 $1.260 $1.000
6185 6002 TMA (STATIONARY) DAY 8.000 $400.000 $281.490 $400.000 $1,327.300 $1,500.000
6185 6003 TMA (MOBILE OPERATION) HR 40.000 $100.000 $73.990 $275.000 $160.670 $95.000
Totals: $9,565,794.00 $10,246,889.62 $10,650,047.20 $11,565,191.54 $11,687,192.95