REMOVE CONC (WINGWALL)
|
CY
|
9.200
|
$900.000
|
$2,000.000
|
$800.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
1,044.000
|
$60.000
|
$40.000
|
$80.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
440.000
|
$20.000
|
$20.000
|
$15.000
|
|
|
REMOVE CONC (ABUTMENT BACKWALL)
|
CY
|
35.400
|
$750.000
|
$1,000.000
|
$800.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,181.000
|
$10.000
|
$35.000
|
$10.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
4,978.000
|
$10.000
|
$20.000
|
$15.000
|
|
|
PLANE ASPH CONC PAV (2" TO 6")
|
SY
|
2,795.000
|
$10.000
|
$20.000
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
739.200
|
$240.730
|
$600.000
|
$280.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
340.000
|
$94.420
|
$110.000
|
$45.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
25.400
|
$1,358.210
|
$5,000.000
|
$7,000.000
|
|
|
CL C CONC (WINGWALLS)(HPC)
|
CY
|
10.100
|
$1,358.210
|
$5,000.000
|
$7,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
104.000
|
$750.000
|
$1,000.000
|
$750.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
38,918.000
|
$44.000
|
$41.000
|
$65.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
377.100
|
$1,000.000
|
$1,000.000
|
$950.000
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
912.000
|
$11.000
|
$10.000
|
$30.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
573.000
|
$192.000
|
$200.000
|
$350.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
47.000
|
$225.000
|
$200.000
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$650.000
|
$1,000.000
|
$850.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
928.000
|
$20.000
|
$40.000
|
$65.000
|
|
|
RAIL (TY T80SS)(HPC)
|
LF
|
1,910.000
|
$100.000
|
$150.000
|
$165.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
470.000
|
$203.270
|
$215.000
|
$225.000
|
|
|
WATERPROOFING (TY 10)
|
SY
|
62.000
|
$70.000
|
$50.000
|
$100.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
4.000
|
$150,000.000
|
$120,000.000
|
$300,000.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
1,284.000
|
$50.000
|
$60.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$530,000.000
|
$695,000.000
|
$894,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$25,081.000
|
$50,000.000
|
$32,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,210.000
|
$3.310
|
$3.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,210.000
|
$2.000
|
$1.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
175.000
|
$9.400
|
$5.000
|
$25.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
175.000
|
$2.000
|
$1.000
|
$15.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,836.000
|
$55.000
|
$61.000
|
$50.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,880.000
|
$29.500
|
$10.000
|
$25.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,880.000
|
$12.000
|
$5.000
|
$18.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,880.000
|
$20.000
|
$10.000
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 4) (42 )
|
LF
|
20.000
|
$150.000
|
$200.000
|
$500.000
|
|
|
PERM CTB (TRAN SSCB TO T80SS)(MOD)
|
LF
|
20.000
|
$200.000
|
$200.000
|
$500.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$38.180
|
$33.000
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,900.000
|
$2,475.000
|
$3,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,600.000
|
$1,600.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
700.000
|
$3.200
|
$4.000
|
$33.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$365.000
|
$400.000
|
$330.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$389.330
|
$400.000
|
$330.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,500.000
|
$3,200.000
|
$3,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$400.000
|
$400.000
|
$330.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,640.000
|
$3,200.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,900.000
|
$3,200.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$10,400.000
|
$10,000.000
|
|
|
RELOCATE RD IL ASM (BRIDGE MOUNT)
|
EA
|
2.000
|
$5,000.000
|
$3,600.000
|
$3,500.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
8.000
|
$900.000
|
$1,400.000
|
$2,000.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
310.000
|
$33.990
|
$30.000
|
$25.000
|
|
|
CONDT (RM) (2")
|
LF
|
380.000
|
$69.500
|
$40.000
|
$45.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,125.000
|
$3.000
|
$1.500
|
$4.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,250.000
|
$3.300
|
$3.000
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$2,000.000
|
$2,600.000
|
$2,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
18.000
|
$38.730
|
$38.500
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
6.000
|
$21.490
|
$38.500
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$25.390
|
$41.500
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$47.700
|
$41.500
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
2.000
|
$49.790
|
$41.500
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
60.000
|
$5.150
|
$16.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,126.000
|
$2.100
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,296.000
|
$1.600
|
$0.900
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
724.000
|
$2.090
|
$2.800
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
17,873.000
|
$2.540
|
$0.900
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
65.000
|
$1.500
|
$1.600
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,950.000
|
$1.160
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
187.000
|
$4.070
|
$2.500
|
$3.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
850.000
|
$3.470
|
$5.400
|
$6.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
33,481.000
|
$0.610
|
$0.180
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,950.000
|
$1.150
|
$0.300
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,037.000
|
$0.820
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
6,286.000
|
$1.410
|
$1.100
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
13,809.000
|
$0.700
|
$0.950
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
13,322.000
|
$0.700
|
$0.950
|
$1.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
383.000
|
$4.580
|
$6.000
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
33,481.000
|
$1.430
|
$0.750
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,020.000
|
$2.700
|
$1.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,037.000
|
$1.880
|
$2.350
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
33,481.000
|
$0.100
|
$0.020
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,950.000
|
$0.300
|
$0.100
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,001.000
|
$0.320
|
$0.400
|
$0.500
|
|
|
CRACK CLEANING AND SEALING (JCP)
|
LF
|
2,100.000
|
$33.300
|
$15.000
|
$28.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
4.000
|
$8,000.000
|
$2,000.000
|
$10,000.000
|
|
|
REP STL BRDG MEMB (WELD REPAIR)
|
EA
|
8.000
|
$8,000.000
|
$2,000.000
|
$5,000.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
823.000
|
$215.000
|
$265.000
|
$300.000
|
|
|
TACK COAT
|
GAL
|
747.000
|
$7.480
|
$6.000
|
$10.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
$443.500
|
$500.000
|
$600.000
|
|
|
STEEL BRIDGE ZONE PAINTING (REF NO. 1)
|
EA
|
2.000
|
$150,000.000
|
$158,000.000
|
$175,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$20,000.000
|
$40,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$250.000
|
$950.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$105.000
|
$95.000
|
$100.000
|
|
Totals: |
$6,231,994.941
|
$6,968,414.650
|
$8,944,119.250
|