POTTER US 87 (0041-07-113)

Items: 86

County: POTTER
Length: N/A
Highway: US 87
District: AMARILLO
Control Number: 0041-07-113
DBE Goal: N/A
Project: BR 2023(597)
Guaranty: N/A
Time: 302 WORKING DAYS
Engineer's Estimate: $12,784,388.15
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$12,784,388.15
$11,665,732.35
Over/Under Est: -8.75% -$1,118,655.80
$14,413,606.94
Over/Under Est: 12.74% $1,629,218.79
Amt Left: 23.56% $2,747,874.59
$19,649,292.63
Over/Under Est: 53.7% $6,864,904.48
Amt Left: 68.44% $7,983,560.28
Delta: -36.32% -$5,235,685.69
Subcontractor Percentage Amount
ALAMO BROTHERS CONCRETE INC 19.54% $2,386,885.70
HARDY HOLE DRILLING 3.54% $432,424.53
HJC FARMS, INC. 2.94% $359,132.24
APOLLO CONSTRUCTORS, INC. 2.28% $278,510.72
PRIMATE CONSTRUCTION, LP 0.64% $78,178.45
TRP CONSTRUCTION GROUP, LLC 0.60% $73,292.29
BARRICADES UNLIMITED 0.43% $52,526.14
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.04% $4,886.15
Total: 30.01% $3,665,836.22

Bid Items & Bid Tabulations

86 Total 0 of 86
POTTER  |  US 87  |  AMARILLO  |  0041-07-113  |  04/05/2023  |  $12,784,388.15  |  BR 2023(597)  |  BRIDGE REPL  |  302 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 20.000 $1,000.000 $13,700.000 $2,500.000 $70,083.550
REMOVING CONC (RIPRAP)
SY 8,350.000 $20.000 $13.300 $20.000 $21.030
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 974.000 $11.000 $35.400 $50.000 $22.430
EXCAVATION (ROADWAY)
CY 740.000 $30.000 $42.400 $60.000 $35.040
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 4,220.000 $2.000 $1.350 $1.500 $1.810
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 6,756.000 $4.000 $6.350 $6.650 $6.450
CEM STABIL BKFL
CY 280.000 $275.000 $280.000 $500.000 $245.290
DRILL SHAFT (36 IN)
LF 1,700.000 $350.000 $360.000 $400.000 $481.440
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 144.000 $350.000 $585.000 $560.000 $700.840
CL C CONC (ABUT)(HPC)
CY 168.800 $1,500.000 $1,845.000 $2,000.000 $2,803.340
CL C CONC (CAP)(HPC)
CY 143.000 $1,700.000 $2,080.000 $2,000.000 $3,504.180
CL C CONC (COLUMN)(HPC)
CY 211.000 $1,750.000 $1,500.000 $2,000.000 $2,803.340
CL C CONC (RAIL FOUNDATION)
CY 508.000 $700.000 $580.000 $600.000 $1,121.340
REINF CONC SLAB (HPC)
SF 32,360.000 $43.000 $40.300 $50.000 $52.300
APPROACH SLAB (HPC)
CY 244.000 $1,100.000 $845.000 $1,500.000 $1,682.010
PRESTR CONC GIRDER (TX28)
LF 4,579.070 $275.000 $240.000 $275.000 $318.410
RIPRAP (CONC)(4 IN)
CY 2,107.000 $700.000 $553.000 $550.000 $770.920
RIPRAP (MOW STRIP)(4 IN)
CY 898.000 $700.000 $580.000 $550.000 $770.920
RAIL (TY SSTR)
LF 5,108.000 $90.000 $84.500 $85.000 $72.890
HEADER TYPE EXPANSION JOINT
LF 320.000 $250.000 $170.500 $350.000 $226.430
ADJUSTING INLET (CAP)
EA 2.000 $4,000.000 $4,200.000 $5,500.000 $7,008.360
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $247,750.000 $150,000.000 $435,000.000 $490,584.870
MOBILIZATION
LS 1.000 $1,000,000.000 $1,100,000.000 $1,450,000.000 $1,948,322.790
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $20,000.000 $25,000.000 $50,000.000 $70,083.550
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $55.000 $67.750 $25.000 $36.440
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $15.000 $14.650 $10.000 $71.520
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,468.000 $3.350 $6.000 $5.000 $10.160
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,468.000 $1.500 $2.000 $1.000 $2.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 400.000 $12.000 $7.750 $10.000 $17.170
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $3.000 $2.650 $4.000 $5.260
CONSTRUCTING DETOURS
SY 8,668.000 $125.000 $97.150 $110.000 $140.170
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 4,470.000 $25.000 $11.900 $5.500 $35.040
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 4,470.000 $15.000 $10.000 $3.000 $28.030
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 4,470.000 $25.000 $11.750 $5.500 $35.040
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 200.000 $90.000 $173.000 $165.000 $294.350
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 20.000 $150.000 $210.000 $200.000 $364.430
CONC SIDEWALKS (4")
SY 635.000 $100.000 $57.000 $60.000 $112.130
CURB RAMPS (TY 5)
EA 8.000 $2,500.000 $2,665.000 $3,000.000 $4,905.850
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 4,800.000 $0.500 $7.250 $3.450 $4.840
MTL W-BEAM GD FEN (STEEL POST)
LF 2,700.000 $40.000 $35.350 $31.000 $70.080
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $3,000.000 $2,850.000 $2,400.000 $4,205.010
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,750.000 $1,555.000 $1,575.000 $3,504.180
REMOVE METAL BEAM GUARD FENCE
LF 5,363.000 $5.000 $2.100 $2.000 $4.910
REMOVE CABLE BARRIER
LF 3,412.000 $2.000 $2.100 $5.000 $7.010
REMOVE CABLE BARRIER TERMINAL SECTION
EA 4.000 $600.000 $1,320.000 $500.000 $1,051.250
INSTALL SALVAGE CABLE BARRIER
LF 2,302.000 $6.000 $5.300 $10.000 $14.020
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 4.000 $1,000.000 $3,165.000 $2,500.000 $2,803.340
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,515.000 $3,125.000 $5,606.680
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,500.000 $2,640.000 $695.630 $2,102.510
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $1,320.000 $695.630 $1,401.670
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $13,000.000 $8,975.000 $7,695.630 $10,933.030
RELOCATE RD IL ASM (TRANS-BASE)
EA 18.000 $3,300.000 $3,620.000 $3,430.000 $3,511.970
REPLACE LUMINAIRE W/LED (250W EQ)
EA 36.000 $500.000 $1,040.000 $985.000 $741.540
CONDT (PVC) (SCH 40) (2")
LF 3,510.000 $18.000 $17.650 $16.750 $20.370
CONDT (PVC) (SCH 80) (3") (BORE)
LF 400.000 $55.000 $56.740 $53.750 $58.690
ELEC CONDR (NO.8) BARE
LF 835.000 $1.900 $1.450 $1.350 $2.270
ELEC CONDR (NO.8) INSULATED
LF 1,670.000 $2.000 $3.000 $2.850 $2.590
ELEC CONDR (NO.6) BARE
LF 2,050.000 $3.400 $1.800 $1.700 $2.940
ELEC CONDR (NO.6) INSULATED
LF 4,100.000 $3.750 $3.400 $3.200 $3.240
ELEC CONDR (NO.4) BARE
LF 1,140.000 $3.800 $2.550 $2.400 $3.810
ELEC CONDR (NO.4) INSULATED
LF 2,280.000 $4.000 $4.450 $4.200 $5.370
GROUND BOX TY A (122311)W/APRON
EA 10.000 $2,000.000 $2,740.000 $2,592.000 $1,650.690
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $1,100.000 $1,100.000 $1,480.000 $2,074.470
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,500.000 $1,820.000 $2,134.000 $2,991.170
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 8.000 $3,500.000 $4,225.000 $2,646.000 $3,708.820
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $160.000 $160.000 $166.000 $232.680
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 480.000 $0.600 $2.100 $2.000 $2.800
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 12,440.000 $0.600 $1.150 $1.100 $1.540
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 19,680.000 $0.600 $1.150 $1.100 $1.540
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 1,448.000 $4.250 $2.650 $2.500 $3.500
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,600.000 $3.500 $2.650 $2.500 $3.500
REFL PAV MRKR TY II-C-R
EA 368.000 $7.000 $6.350 $6.000 $8.410
ELIM EXT PAV MRK & MRKS (4")
LF 3,000.000 $1.000 $2.100 $2.000 $2.800
SP MIXES SP-D SAC-A PG70-28
TON 1,488.000 $202.000 $200.000 $155.410 $294.350
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $350.000 $775.000 $500.000 $700.840
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $11,800.000 $18,500.000 $14,016.710
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 2,800.000 $0.600 $1.000 $0.940 $1.320
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 6,480.000 $0.660 $1.000 $0.940 $1.320
HPPM W/RET REQ TY I(W)6"(SLD)(100MIL)
LF 1,472.000 $0.650 $1.000 $0.940 $1.320
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 11,200.000 $0.660 $1.000 $0.940 $1.320
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 4,470.000 $30.000 $22.000 $35.000 $42.050
MODULAR GLARE SCREENS (REMOVE)
LF 4,470.000 $3.000 $1.150 $10.000 $4.210
MODULAR GLARE SCREENS (MOVE)
LF 4,470.000 $7.000 $1.500 $20.000 $7.010
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $15,000.000 $6,900.000 $15,000.000 $12,615.040
TMA (STATIONARY)
DAY 35.000 $150.000 $575.000 $1,250.000 $350.420
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $94.000 $95.000 $175.210
Totals: $12,784,388.150 $11,665,732.350 $14,413,606.940 $19,649,292.641