PREPARING ROW
|
STA
|
20.000
|
$1,000.000
|
$13,700.000
|
$2,500.000
|
$70,083.550
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
8,350.000
|
$20.000
|
$13.300
|
$20.000
|
$21.030
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
974.000
|
$11.000
|
$35.400
|
$50.000
|
$22.430
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
740.000
|
$30.000
|
$42.400
|
$60.000
|
$35.040
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
4,220.000
|
$2.000
|
$1.350
|
$1.500
|
$1.810
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
6,756.000
|
$4.000
|
$6.350
|
$6.650
|
$6.450
|
|
|
CEM STABIL BKFL
|
CY
|
280.000
|
$275.000
|
$280.000
|
$500.000
|
$245.290
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,700.000
|
$350.000
|
$360.000
|
$400.000
|
$481.440
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
144.000
|
$350.000
|
$585.000
|
$560.000
|
$700.840
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
168.800
|
$1,500.000
|
$1,845.000
|
$2,000.000
|
$2,803.340
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
143.000
|
$1,700.000
|
$2,080.000
|
$2,000.000
|
$3,504.180
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
211.000
|
$1,750.000
|
$1,500.000
|
$2,000.000
|
$2,803.340
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
508.000
|
$700.000
|
$580.000
|
$600.000
|
$1,121.340
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
32,360.000
|
$43.000
|
$40.300
|
$50.000
|
$52.300
|
|
|
APPROACH SLAB (HPC)
|
CY
|
244.000
|
$1,100.000
|
$845.000
|
$1,500.000
|
$1,682.010
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,579.070
|
$275.000
|
$240.000
|
$275.000
|
$318.410
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,107.000
|
$700.000
|
$553.000
|
$550.000
|
$770.920
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
898.000
|
$700.000
|
$580.000
|
$550.000
|
$770.920
|
|
|
RAIL (TY SSTR)
|
LF
|
5,108.000
|
$90.000
|
$84.500
|
$85.000
|
$72.890
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
320.000
|
$250.000
|
$170.500
|
$350.000
|
$226.430
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$4,000.000
|
$4,200.000
|
$5,500.000
|
$7,008.360
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$247,750.000
|
$150,000.000
|
$435,000.000
|
$490,584.870
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$1,100,000.000
|
$1,450,000.000
|
$1,948,322.790
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$20,000.000
|
$25,000.000
|
$50,000.000
|
$70,083.550
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$55.000
|
$67.750
|
$25.000
|
$36.440
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$15.000
|
$14.650
|
$10.000
|
$71.520
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,468.000
|
$3.350
|
$6.000
|
$5.000
|
$10.160
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,468.000
|
$1.500
|
$2.000
|
$1.000
|
$2.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
400.000
|
$12.000
|
$7.750
|
$10.000
|
$17.170
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$3.000
|
$2.650
|
$4.000
|
$5.260
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,668.000
|
$125.000
|
$97.150
|
$110.000
|
$140.170
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
4,470.000
|
$25.000
|
$11.900
|
$5.500
|
$35.040
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
4,470.000
|
$15.000
|
$10.000
|
$3.000
|
$28.030
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
4,470.000
|
$25.000
|
$11.750
|
$5.500
|
$35.040
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
200.000
|
$90.000
|
$173.000
|
$165.000
|
$294.350
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
20.000
|
$150.000
|
$210.000
|
$200.000
|
$364.430
|
|
|
CONC SIDEWALKS (4")
|
SY
|
635.000
|
$100.000
|
$57.000
|
$60.000
|
$112.130
|
|
|
CURB RAMPS (TY 5)
|
EA
|
8.000
|
$2,500.000
|
$2,665.000
|
$3,000.000
|
$4,905.850
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
4,800.000
|
$0.500
|
$7.250
|
$3.450
|
$4.840
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,700.000
|
$40.000
|
$35.350
|
$31.000
|
$70.080
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$3,000.000
|
$2,850.000
|
$2,400.000
|
$4,205.010
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,750.000
|
$1,555.000
|
$1,575.000
|
$3,504.180
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,363.000
|
$5.000
|
$2.100
|
$2.000
|
$4.910
|
|
|
REMOVE CABLE BARRIER
|
LF
|
3,412.000
|
$2.000
|
$2.100
|
$5.000
|
$7.010
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
4.000
|
$600.000
|
$1,320.000
|
$500.000
|
$1,051.250
|
|
|
INSTALL SALVAGE CABLE BARRIER
|
LF
|
2,302.000
|
$6.000
|
$5.300
|
$10.000
|
$14.020
|
|
|
INSTALL SALVAGE CABLE BAR TERM SECTION
|
EA
|
4.000
|
$1,000.000
|
$3,165.000
|
$2,500.000
|
$2,803.340
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$3,515.000
|
$3,125.000
|
$5,606.680
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,500.000
|
$2,640.000
|
$695.630
|
$2,102.510
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,320.000
|
$695.630
|
$1,401.670
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$13,000.000
|
$8,975.000
|
$7,695.630
|
$10,933.030
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
18.000
|
$3,300.000
|
$3,620.000
|
$3,430.000
|
$3,511.970
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
36.000
|
$500.000
|
$1,040.000
|
$985.000
|
$741.540
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,510.000
|
$18.000
|
$17.650
|
$16.750
|
$20.370
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
400.000
|
$55.000
|
$56.740
|
$53.750
|
$58.690
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
835.000
|
$1.900
|
$1.450
|
$1.350
|
$2.270
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,670.000
|
$2.000
|
$3.000
|
$2.850
|
$2.590
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
2,050.000
|
$3.400
|
$1.800
|
$1.700
|
$2.940
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
4,100.000
|
$3.750
|
$3.400
|
$3.200
|
$3.240
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,140.000
|
$3.800
|
$2.550
|
$2.400
|
$3.810
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
2,280.000
|
$4.000
|
$4.450
|
$4.200
|
$5.370
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
10.000
|
$2,000.000
|
$2,740.000
|
$2,592.000
|
$1,650.690
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,100.000
|
$1,100.000
|
$1,480.000
|
$2,074.470
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$1,500.000
|
$1,820.000
|
$2,134.000
|
$2,991.170
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$3,500.000
|
$4,225.000
|
$2,646.000
|
$3,708.820
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
8.000
|
$160.000
|
$160.000
|
$166.000
|
$232.680
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
480.000
|
$0.600
|
$2.100
|
$2.000
|
$2.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
12,440.000
|
$0.600
|
$1.150
|
$1.100
|
$1.540
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
19,680.000
|
$0.600
|
$1.150
|
$1.100
|
$1.540
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
1,448.000
|
$4.250
|
$2.650
|
$2.500
|
$3.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
1,600.000
|
$3.500
|
$2.650
|
$2.500
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
368.000
|
$7.000
|
$6.350
|
$6.000
|
$8.410
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,000.000
|
$1.000
|
$2.100
|
$2.000
|
$2.800
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
1,488.000
|
$202.000
|
$200.000
|
$155.410
|
$294.350
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
4.000
|
$350.000
|
$775.000
|
$500.000
|
$700.840
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$11,800.000
|
$18,500.000
|
$14,016.710
|
|
|
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
|
LF
|
2,800.000
|
$0.600
|
$1.000
|
$0.940
|
$1.320
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
|
LF
|
6,480.000
|
$0.660
|
$1.000
|
$0.940
|
$1.320
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(100MIL)
|
LF
|
1,472.000
|
$0.650
|
$1.000
|
$0.940
|
$1.320
|
|
|
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
|
LF
|
11,200.000
|
$0.660
|
$1.000
|
$0.940
|
$1.320
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
4,470.000
|
$30.000
|
$22.000
|
$35.000
|
$42.050
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
4,470.000
|
$3.000
|
$1.150
|
$10.000
|
$4.210
|
|
|
MODULAR GLARE SCREENS (MOVE)
|
LF
|
4,470.000
|
$7.000
|
$1.500
|
$20.000
|
$7.010
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$15,000.000
|
$6,900.000
|
$15,000.000
|
$12,615.040
|
|
|
TMA (STATIONARY)
|
DAY
|
35.000
|
$150.000
|
$575.000
|
$1,250.000
|
$350.420
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$100.000
|
$94.000
|
$95.000
|
$175.210
|
|
Totals: |
$12,784,388.150
|
$11,665,732.350
|
$14,413,606.940
|
$19,649,292.641
|