Show Job Controls
Bid Cobra

POLK US0059 (6429-94-001)

Items: 34

County: POLK
Length: N/A
Highway: US0059
District: LUFKIN
Control Number: 6429-94-001
DBE Goal: N/A
Project: RMC - 642994001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $250,056.90
Date: 03/22/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$250,056.90
$216,537.00
Over/Under Est: -13.4% -$33,519.90
Over/Under Est: 21.59% $53,993.10
Amt Left: 40.41% $87,513.00
Over/Under Est: 50.53% $126,353.10
Amt Left: 73.83% $159,873.00
Delta: -23.80% -$72,360.00

Bid Items & Bid Tabulations

34 Total 0 of 34
POLK  |  US0059  |  LUFKIN  |  6429-94-001  |  03/22/2023  |  $250,056.90  |  RMC - 642994001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY LEE WALKER
ABOVE ALL CONSTRUCTION
GARRET SHIELDS INFRASTRUCTURE
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 5.000 $231.500 $100.000 $200.000 $200.000
MOBILIZATION (CALLOUT)
EA 12.000 $1,400.000 $1,500.000 $500.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $28.000 $28.000 $30.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,300.000 $400.000 $2,500.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,400.000 $1,900.000 $2,000.000 $1,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $1,500.000 $600.000 $2,000.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $5.000 $2.000 $5.000 $5.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 10.000 $17.470 $1.000 $50.000 $25.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $37.820 $1.000 $50.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 10.000 $16.030 $1.000 $50.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $42.190 $1.000 $50.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $42.120 $1.000 $50.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 10.000 $24.010 $1.000 $50.000 $25.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $14.000 $18.000 $30.000 $40.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 76.000 $20.000 $30.000 $50.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 8.000 $31.000 $40.000 $50.000 $3,000.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 450.000 $50.000 $65.000 $50.000 $70.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 5.000 $102.000 $65.000 $100.000 $100.000
REALIGN POSTS
EA 75.000 $23.000 $25.000 $50.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 125.000 $204.000 $25.000 $100.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $40.000 $35.000 $35.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $120.000 $65.000 $100.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $3,500.000 $3,900.000 $4,000.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 5.000 $1,000.000 $1,500.000 $1,000.000 $2,000.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $170.000 $100.000 $250.000 $500.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $70.000 $80.000 $100.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $70.000 $80.000 $100.000 $100.000
REPLACE SGT STRUT
EA 5.000 $60.000 $80.000 $100.000 $60.000
REPLACE SGT OBJECT MARKER
EA 2.000 $25.000 $1.000 $50.000 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $150.000 $100.000 $300.000 $300.000
REPAIR (NARROW QUAD)
EA 2.000 $100.000 $100.000 $8,000.000 $5,000.000
REPAIR TAU II (N)
LF 50.000 $320.000 $400.000 $500.000 $500.000
REPAIR (W-BEAM - T101 RAIL)
LF 75.000 $18.000 $30.000 $150.000 $100.000
TMA (STATIONARY)
DAY 12.000 $250.000 $100.000 $500.000 $1,000.000
Totals: $250,056.900 $216,537.000 $304,050.000 $376,410.000