Job Info for 6382-60-001

County: POLK Highway: US0059 Date: 05/20/2021 (3 years ago) Engineer's Estimate: $52,875 Control Number: 6382-60-001
Project: MMC - 638260001 District: LUFKIN Time: 120 CALENDAR DAYS Type: FLEXIBLE BASE

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $52,875.00
VULCAN CONSTRUCTION MATERIALS, LLC   $47,925.00 1
-9.36% | -$4,950.00
EAST TEXAS ASPHALT CO., LTD.   $53,625.00 2
1.42% | $750.00
11.89% | $5,700.00

Bid Items

Items: 1, 0 filtered
POLK US0059  |  LUFKIN  |  6382-60-001  |  05/20/2021  |  $52,875  |  MMC - 638260001  |  FLEXIBLE BASE  |  120 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate VULCAN CONSTRUCTION MATERIALS, LLC EAST TEXAS ASPHALT CO., LTD.
8007 6063 FL BS (SITE DEL) (TY E GR 2) (SITE 1) TON 1,500.000 $35.250 $31.950 $35.750
Totals: $52,875.00 $47,925.00 $53,625.00