Items: 63

County: POLK
Length: N/A
Highway: CR
District: LUFKIN
Control Number: 0911-04-087
DBE Goal: N/A
Project: BR 2B20(099)
Guaranty: N/A
Time: 148 WORKING DAYS
Engineer's Estimate: $1,639,123.50
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$1,639,123.50
$1,594,106.99
Over/Under Est: -2.75% -$45,016.51
Over/Under Est: 11.8% $193,358.30
Amt Left: 14.95% $238,374.81
$1,878,271.82
Over/Under Est: 14.59% $239,148.32
Amt Left: 17.83% $284,164.83
Delta: -2.50% -$45,790.02
Over/Under Est: 17.36% $284,547.55
Amt Left: 20.67% $329,564.06
Delta: -2.42% -$45,399.23
Over/Under Est: 20.26% $332,042.30
Amt Left: 23.65% $377,058.81
Delta: -2.47% -$47,494.75
$2,341,316.00
Over/Under Est: 42.84% $702,192.50
Amt Left: 46.87% $747,209.01
Delta: -18.78% -$370,150.20

Bid Items & Bid Tabulations

63 Total 0 of 63
POLK  |  CR  |  LUFKIN  |  0911-04-087  |  07/01/2021  |  $1,639,123.50  |  BR 2B20(099)  |  BRIDGE REPL  |  148 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
A. L. HELMCAMP, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 15.900 $1,800.000 $1,287.000 $4,000.000 $2,000.000 $5,000.000 $5,000.000 $15,000.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 758.000 $5.000 $5.000 $8.000 $10.000 $11.000 $7.000 $15.000
REMOVING UNTREATED BASE (4")
SY 15.000 $10.000 $197.000 $100.000 $75.000 $24.000 $36.000 $15.000
OBLITERATING ABANDONED ROAD
SY 920.000 $5.000 $11.700 $20.000 $8.000 $6.000 $12.000 $25.000
EXCAVATION (ROADWAY)
CY 1,456.000 $8.000 $13.000 $20.000 $20.000 $15.500 $25.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,759.000 $15.000 $9.000 $20.000 $20.000 $26.750 $30.000 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,240.000 $2.500 $3.000 $5.000 $4.000 $4.010 $6.500 $2.000
BLOCK SODDING
SY 600.000 $5.000 $11.680 $10.000 $6.330 $6.000 $6.000 $8.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 6,240.000 $0.750 $0.450 $0.750 $0.390 $0.350 $0.400 $0.600
CELL FBR MLCH SEED(TEMP)(WARM)
SY 3,120.000 $0.500 $0.450 $0.500 $0.390 $0.350 $0.400 $0.600
CELL FBR MLCH SEED(TEMP)(COOL)
SY 3,120.000 $0.500 $0.450 $0.500 $0.390 $0.350 $0.400 $0.600
VEGETATIVE WATERING
MG 261.800 $15.000 $5.000 $1.000 $20.000 $45.000 $30.000 $65.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 2,084.000 $1.500 $3.350 $2.500 $1.200 $1.150 $1.200 $3.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 2,692.000 $25.000 $26.420 $15.000 $35.000 $31.500 $20.000 $20.000
CEM STABIL BKFL
CY 195.800 $225.000 $192.430 $200.000 $200.000 $194.000 $190.000 $200.000
TEMPORARY SPL SHORING
SF 262.000 $20.000 $75.000 $50.000 $40.000 $40.800 $65.000 $35.000
DRILL SHAFT (30 IN)
LF 750.000 $300.000 $201.610 $190.000 $190.000 $283.000 $320.000 $300.000
CL C CONC (ABUT)
CY 88.800 $1,125.000 $975.000 $1,200.000 $1,400.000 $900.000 $1,100.000 $1,500.000
CL E CONC (SEAL SLAB)(NON-REINF)
CY 11.000 $200.000 $1,064.000 $300.000 $600.000 $400.000 $460.000 $400.000
REINF CONC SLAB (BOX BEAM)
SF 5,626.000 $20.000 $15.000 $20.000 $20.000 $20.000 $19.000 $24.000
SHEAR KEY
CY 40.700 $365.000 $539.000 $550.000 $500.000 $408.000 $560.000 $400.000
PRESTR CONC BOX BEAM (4B20)
LF 496.000 $200.000 $221.060 $250.000 $270.000 $240.000 $240.000 $250.000
PRESTR CONC BOX BEAM (5B20)
LF 248.000 $220.000 $244.970 $250.000 $290.000 $245.000 $240.000 $250.000
PRESTR CONC BOX BEAM (4B34)
LF 358.000 $230.000 $223.760 $275.000 $230.000 $216.000 $370.000 $250.000
PRESTR CONC BOX BEAM (5B34)
LF 179.000 $250.000 $259.430 $275.000 $260.000 $216.000 $370.000 $250.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,021.000 $135.000 $114.750 $150.000 $130.000 $190.000 $180.000 $160.000
RAIL (TY T223)
LF 224.000 $100.000 $111.790 $120.000 $100.000 $100.000 $125.000 $135.000
RAIL (TY T631LS)
LF 438.000 $65.000 $66.410 $80.000 $60.000 $60.000 $63.000 $100.000
CONC BOX CULV (8 FT X 8 FT)
LF 60.000 $700.000 $1,242.450 $1,800.000 $1,200.000 $918.000 $1,250.000 $2,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $40,000.000 $36,323.500 $38,000.000 $40,000.000 $35,700.000 $33,000.000 $35,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $800.000 $2,782.250 $1,200.000 $800.000 $675.000 $825.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,200.000 $4,525.000 $1,500.000 $1,400.000 $1,100.000 $1,495.000 $3,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 4.000 $18,000.000 $3,216.000 $15,000.000 $20,000.000 $8,160.000 $10,000.000 $25,000.000
REMOV STR (PIPE)
EA 3.000 $350.000 $200.000 $500.000 $1,000.000 $306.000 $900.000 $3,500.000
MOBILIZATION
LS 1.000 $150,000.000 $120,000.000 $160,000.000 $150,000.000 $250,000.000 $150,000.000 $230,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $1,800.000 $1,270.820 $2,000.000 $7,500.000 $2,300.000 $2,450.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $35.000 $32.000 $5.000 $41.250 $40.000 $41.250 $50.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $10.000 $9.000 $5.000 $1.100 $9.000 $9.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,668.000 $3.000 $4.050 $1.000 $3.140 $3.000 $3.150 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,668.000 $1.000 $1.000 $1.000 $1.100 $1.000 $1.100 $1.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 180.000 $25.000 $100.220 $75.000 $80.000 $80.000 $75.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $100.000 $202.030 $75.000 $75.000 $103.000 $100.000 $85.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 180.000 $10.000 $34.940 $30.000 $45.000 $23.000 $25.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $10.000 $20.000 $30.000 $60.000 $47.000 $26.000 $15.000
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
LF 20.000 $100.000 $636.950 $70.000 $275.000 $218.120 $225.000 $300.000
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 20.000 $20.000 $274.050 $30.000 $100.000 $94.000 $52.000 $25.000
DRIVEWAYS (BASE)
SY 109.000 $35.000 $105.860 $50.000 $85.000 $65.000 $52.000 $35.000
MTL W-BEAM GD FEN (TIM POST)
LF 62.000 $25.000 $75.290 $35.000 $30.000 $29.000 $30.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,500.000 $1,500.000 $1,500.000 $1,800.000 $1,700.000 $1,775.000 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,350.000 $1,601.140 $1,500.000 $1,200.000 $1,150.000 $1,205.000 $1,400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $3,151.000 $3,000.000 $2,800.000 $2,650.000 $2,778.000 $3,200.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 1.000 $15,000.000 $19,558.000 $18,000.000 $20,000.000 $21,000.000 $17,875.000 $18,000.000
WIRE FENCE (TY C)
LF 45.000 $15.000 $92.400 $20.000 $80.000 $26.000 $55.000 $25.000
GATE (TY 1)
EA 1.000 $1,500.000 $3,500.000 $1,000.000 $1,400.000 $1,530.000 $1,100.000 $2,500.000
REMOVE SM RD SN SUP&AM
EA 9.000 $100.000 $200.000 $500.000 $250.000 $140.000 $105.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 3.000 $30.000 $15.000 $30.000 $25.000 $16.000 $16.500 $15.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 21.000 $30.000 $25.000 $30.000 $16.500 $16.000 $16.500 $50.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 7.000 $200.000 $350.000 $400.000 $220.000 $260.000 $270.000 $100.000
D-GR HMA TY-D PG64-22
TON 208.000 $85.000 $186.500 $220.000 $150.000 $205.000 $155.000 $250.000
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 104.000 $60.000 $100.390 $0.000 $0.000 $0.000 $0.000 $120.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 52.000 $50.000 $126.040 $0.000 $0.000 $0.000 $0.000 $85.000
1
RC PIPE (CL III)(18 IN)
LF 52.000 $50.000 $0.000 $60.000 $55.000 $47.000 $55.000 $0.000
2
RC PIPE (CL III)(24 IN)
LF 104.000 $60.000 $0.000 $60.000 $70.000 $67.500 $71.000 $0.000
Totals: $1,647,963.500 $1,594,106.994 $1,832,481.800 $1,878,271.820 $1,923,671.050 $1,971,165.800 $2,341,316.000