Job Info for 0911-04-055

County: POLK Highway: VA Date: 08/06/2019 (5 years ago) Engineer's Estimate: $1,549,868 Control Number: 0911-04-055
Project: C 911-4-55 District: LUFKIN Time: 96 WORKING DAYS Type: REPAIR AND RESURFACE PAVED AREAS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,549,868.00
DREWERY CONSTRUCTION COMPANY, INCORPORATED   $1,899,423.50 1
22.55% | $349,555.50

Bid Items

Items: 41, 0 filtered
POLK VA  |  LUFKIN  |  0911-04-055  |  08/06/2019  |  $1,549,868  |  C 911-4-55  |  REPAIR AND RESURF PAVED AREAS  |  96 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DREWERY CONSTRUCTION COMPANY, INCORPORATED
100 6002 PREPARING ROW STA 28.000 $5,000.000 $1,500.000
104 6028 REMOVING CONC (MISC) SY 419.000 $20.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 4,522.000 $15.000 $26.000
110 6003 EXCAVATION (SPECIAL) CY 1,836.000 $30.000 $32.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 334.000 $30.000 $50.250
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 6,683.000 $3.000 $5.000
162 6002 BLOCK SODDING SY 6,859.000 $10.000 $6.000
168 6001 VEGETATIVE WATERING MG 137.100 $30.000 $100.000
247 6061 FL BS (CMP IN PLC)(TYA GR1-2) (6") SY 5,991.000 $30.000 $40.000
260 6004 LIME (QUICKLIME (DRY)) TON 96.000 $160.000 $205.000
260 6027 LIME TRT (EXST MATL)(8") SY 5,991.000 $6.000 $13.500
310 6009 PRIME COAT (MC-30) GAL 1,798.000 $5.000 $10.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 2,516.000 $5.000 $4.000
316 6433 AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B) CY 55.000 $250.000 $350.000
340 6106 D-GR HMA(SQ) TY-D PG64-22 TON 494.000 $200.000 $200.000
420 6002 CL A CONC (MISC) CY 821.300 $500.000 $625.000
464 6003 RC PIPE (CL III)(18 IN) LF 1,505.000 $60.000 $72.000
464 6016 RC PIPE (CL IV)(12 IN) LF 30.000 $85.000 $210.000
464 6017 RC PIPE (CL IV)(18 IN) LF 877.000 $100.000 $105.000
496 6016 REMOV STR (PIPE) EA 77.000 $350.000 $550.000
500 6001 MOBILIZATION LS 1.000 $115,000.000 $200,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $6,500.000 $12,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 30.000 $30.000 $43.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 30.000 $10.000 $25.500
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 234.000 $25.000 $15.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 234.000 $10.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 100.000 $3.000 $6.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 100.000 $1.000 $1.500
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 720.000 $5.000 $8.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 720.000 $1.000 $1.100
531 6001 CONC SIDEWALKS (4") SY 29.000 $60.000 $300.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 1.000 $360.000 $1,500.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 3.000 $460.000 $550.000
644 6076 REMOVE SM RD SN SUP&AM EA 4.000 $90.000 $600.000
658 6074 INSTL DEL ASSN (OM-2Z)(FLX)(WAP) EA 10.000 $110.000 $200.000
666 6166 RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY) EA 1.000 $200.000 $1,500.000
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 250.000 $3.000 $2.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 2.000 $400.000 $1,000.000
752 6006 TREE REMOVAL (12" - 18" DIA) EA 10.000 $500.000 $750.000
752 6007 TREE REMOVAL (18" - 24" DIA) EA 2.000 $600.000 $1,500.000
5008 6001 WHEEL STOPS EA 60.000 $300.000 $175.000
Totals: $1,549,868.00 $1,899,423.50