PREPARING ROW
|
STA
|
389.800
|
$10,000.000
|
$21,607.000
|
$29,000.000
|
$48,000.000
|
$50,800.000
|
$50,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
24,257.000
|
$7.000
|
$7.180
|
$7.500
|
$7.900
|
$9.000
|
$18.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
132.000
|
$15.000
|
$6.200
|
$9.500
|
$11.900
|
$10.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
1,167.000
|
$10.000
|
$6.070
|
$6.000
|
$5.050
|
$7.000
|
$4.000
|
|
|
REMOV STAB BASE AND ASPH PAV (22")
|
SY
|
19,076.000
|
$5.000
|
$10.440
|
$10.000
|
$10.600
|
$11.000
|
$15.000
|
|
|
REMOVE STAB BASE & ASPH PAV (12"-22")
|
SY
|
88,646.000
|
$5.000
|
$8.370
|
$8.250
|
$4.700
|
$8.000
|
$15.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
2,746.000
|
$3.000
|
$5.480
|
$8.000
|
$3.950
|
$4.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
632,311.000
|
$5.000
|
$6.220
|
$7.000
|
$4.000
|
$15.000
|
$9.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,013,154.000
|
$10.000
|
$6.170
|
$9.000
|
$8.000
|
$12.700
|
$17.000
|
|
|
BACKFILL (TY B)
|
STA
|
12.400
|
$400.000
|
$1,470.990
|
$1,100.000
|
$2,530.000
|
$1,000.000
|
$1,000.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
998,928.000
|
$1.000
|
$0.470
|
$1.000
|
$1.050
|
$0.900
|
$3.500
|
|
|
BLOCK SODDING
|
SY
|
1,860.000
|
$5.000
|
$5.240
|
$4.460
|
$4.450
|
$3.450
|
$4.000
|
|
|
ROLL SODDING
|
SY
|
169,391.000
|
$8.000
|
$4.120
|
$3.530
|
$3.550
|
$3.320
|
$3.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
997,068.000
|
$0.150
|
$0.120
|
$0.120
|
$0.100
|
$0.290
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
518,024.000
|
$0.150
|
$0.080
|
$0.080
|
$0.100
|
$0.260
|
$0.100
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
518,024.000
|
$0.150
|
$0.090
|
$0.090
|
$0.100
|
$0.260
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
20,009.000
|
$20.000
|
$36.770
|
$27.720
|
$32.750
|
$22.000
|
$7.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
43,731.000
|
$1.000
|
$0.990
|
$0.990
|
$1.000
|
$1.150
|
$1.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
231.000
|
$900.000
|
$953.490
|
$953.490
|
$953.000
|
$975.000
|
$1,000.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
23,004.000
|
$20.000
|
$30.870
|
$35.000
|
$84.750
|
$20.000
|
$50.000
|
|
|
LIME (QUICKLIME (DRY))
|
TON
|
6,745.000
|
$230.000
|
$234.540
|
$220.000
|
$198.000
|
$250.000
|
$210.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
217,499.000
|
$4.000
|
$3.480
|
$2.850
|
$3.000
|
$3.250
|
$4.500
|
|
|
CEMENT
|
TON
|
3,867.000
|
$160.000
|
$221.400
|
$250.000
|
$291.000
|
$250.000
|
$200.000
|
|
|
CEMENT TREAT (EXIST MATL)(12")
|
SY
|
217,499.000
|
$2.500
|
$1.530
|
$3.000
|
$3.000
|
$2.000
|
$2.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
23,004.000
|
$4.000
|
$2.720
|
$3.500
|
$3.550
|
$1.500
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
108,565.000
|
$4.000
|
$6.250
|
$6.000
|
$5.600
|
$5.410
|
$6.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
212.000
|
$130.000
|
$200.000
|
$210.000
|
$175.000
|
$182.730
|
$300.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
49.430
|
$900.000
|
$1,455.000
|
$150.000
|
$895.000
|
$1,333.050
|
$1,000.000
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
5,383.000
|
$2.000
|
$1.780
|
$6.000
|
$2.700
|
$3.840
|
$7.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
9,635.000
|
$60.000
|
$105.040
|
$77.000
|
$85.000
|
$85.000
|
$85.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
120,007.000
|
$65.000
|
$103.120
|
$82.000
|
$88.000
|
$85.000
|
$95.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
240,796.000
|
$70.000
|
$105.140
|
$90.000
|
$89.000
|
$85.000
|
$100.000
|
|
|
CEM STABIL BKFL
|
CY
|
10,211.000
|
$120.000
|
$166.660
|
$105.000
|
$55.250
|
$80.000
|
$55.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
31.000
|
$150.000
|
$128.310
|
$255.000
|
$150.000
|
$169.732
|
$125.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
531.000
|
$60.000
|
$161.780
|
$125.000
|
$50.000
|
$100.282
|
$65.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,376.000
|
$3.000
|
$1.110
|
$1.500
|
$1.300
|
$2.229
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,044.000
|
$20.000
|
$62.150
|
$35.000
|
$25.000
|
$25.000
|
$55.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,136.000
|
$85.000
|
$87.360
|
$80.000
|
$116.000
|
$150.000
|
$85.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
132.000
|
$105.000
|
$194.570
|
$300.000
|
$172.000
|
$172.000
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
18,478.000
|
$310.000
|
$178.670
|
$300.000
|
$218.000
|
$250.000
|
$330.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
16,090.000
|
$300.000
|
$172.500
|
$500.000
|
$365.000
|
$350.000
|
$475.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
80.000
|
$800.000
|
$770.840
|
$550.000
|
$690.000
|
$320.000
|
$1,200.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
80.000
|
$100.000
|
$114.100
|
$147.180
|
$114.000
|
$114.100
|
$120.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
50.000
|
$565.000
|
$622.060
|
$439.170
|
$622.000
|
$622.060
|
$644.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
425.000
|
$800.000
|
$727.980
|
$651.080
|
$728.000
|
$727.980
|
$755.000
|
|
|
CL C CONC (ABUT)
|
CY
|
1,396.000
|
$1,000.000
|
$1,084.200
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
3,346.000
|
$1,250.000
|
$1,220.400
|
$1,000.000
|
$1,200.000
|
$1,400.000
|
$1,400.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
368.600
|
$625.000
|
$681.930
|
$1,000.000
|
$1,200.000
|
$700.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
2,886.300
|
$1,015.000
|
$1,015.330
|
$1,500.000
|
$1,200.000
|
$1,600.000
|
$1,400.000
|
|
|
REINF CONC SLAB
|
SF
|
809,224.000
|
$15.000
|
$20.150
|
$20.000
|
$20.400
|
$21.000
|
$17.000
|
|
|
APPROACH SLAB
|
CY
|
2,263.000
|
$450.000
|
$495.370
|
$530.000
|
$800.000
|
$350.000
|
$595.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
5,508.330
|
$135.000
|
$176.010
|
$175.000
|
$200.000
|
$100.000
|
$180.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
8,913.500
|
$165.000
|
$167.370
|
$165.000
|
$200.000
|
$110.000
|
$170.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
995.140
|
$175.000
|
$192.210
|
$190.000
|
$200.000
|
$125.000
|
$210.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
76,685.300
|
$180.000
|
$191.890
|
$180.000
|
$200.000
|
$156.500
|
$185.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
41.600
|
$500.000
|
$528.920
|
$510.000
|
$585.000
|
$550.000
|
$415.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
424.000
|
$500.000
|
$380.560
|
$450.000
|
$600.000
|
$550.000
|
$434.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
1,338.000
|
$450.000
|
$444.360
|
$575.000
|
$500.000
|
$550.000
|
$425.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
8.000
|
$420.000
|
$610.160
|
$600.000
|
$550.000
|
$550.000
|
$515.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
707.000
|
$160.000
|
$175.910
|
$225.000
|
$120.000
|
$200.000
|
$220.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
16,236.000
|
$100.000
|
$182.840
|
$210.000
|
$140.000
|
$200.000
|
$220.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,760,000.000
|
$2.000
|
$2.320
|
$2.750
|
$2.310
|
$2.500
|
$2.250
|
|
|
RAIL (TY SSTR)
|
LF
|
11,547.600
|
$50.000
|
$52.560
|
$60.000
|
$56.000
|
$40.000
|
$55.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
17,286.900
|
$55.000
|
$51.360
|
$68.000
|
$59.500
|
$40.000
|
$55.000
|
|
|
RAIL (CLF-RO)
|
LF
|
617.800
|
$200.000
|
$118.000
|
$350.000
|
$120.000
|
$200.000
|
$175.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
265.800
|
$150.000
|
$68.480
|
$125.000
|
$79.500
|
$215.000
|
$165.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
1,494.000
|
$120.000
|
$156.630
|
$100.000
|
$126.000
|
$150.000
|
$160.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,878.500
|
$120.000
|
$157.420
|
$155.000
|
$209.000
|
$150.000
|
$160.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
202.000
|
$400.000
|
$403.640
|
$400.000
|
$334.000
|
$352.633
|
$850.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
760.000
|
$500.000
|
$565.290
|
$950.000
|
$506.000
|
$496.819
|
$1,100.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
84.000
|
$750.000
|
$795.910
|
$850.000
|
$715.000
|
$705.010
|
$1,500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
214.000
|
$60.000
|
$85.980
|
$90.000
|
$76.000
|
$108.103
|
$115.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,808.000
|
$70.000
|
$96.300
|
$75.000
|
$80.000
|
$120.440
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
3,584.000
|
$80.000
|
$124.620
|
$95.000
|
$103.000
|
$145.048
|
$200.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
502.000
|
$110.000
|
$118.080
|
$120.000
|
$91.500
|
$171.735
|
$200.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
764.000
|
$150.000
|
$221.600
|
$245.000
|
$179.000
|
$212.462
|
$300.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$11,000.000
|
$8,440.000
|
$12,000.000
|
$8,600.000
|
$10,125.980
|
$10,000.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
3.000
|
$5,000.000
|
$6,155.940
|
$6,000.000
|
$7,520.000
|
$7,673.993
|
$8,500.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
4.000
|
$7,000.000
|
$4,428.900
|
$4,500.000
|
$5,970.000
|
$6,277.990
|
$8,000.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$13,000.000
|
$9,098.260
|
$20,000.000
|
$9,910.000
|
$11,603.480
|
$11,000.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
1.000
|
$15,000.000
|
$28,423.820
|
$35,000.000
|
$26,650.000
|
$32,711.980
|
$19,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
4.000
|
$5,000.000
|
$8,698.760
|
$5,800.000
|
$7,610.000
|
$7,342.468
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
6.000
|
$7,000.000
|
$5,696.190
|
$5,500.000
|
$6,620.000
|
$6,548.628
|
$8,100.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
5.000
|
$10,000.000
|
$8,009.470
|
$7,500.000
|
$8,060.000
|
$7,988.596
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
|
EA
|
2.000
|
$14,000.000
|
$21,802.730
|
$28,000.000
|
$21,080.000
|
$21,412.690
|
$20,000.000
|
|
|
INLET (RAIL & GRATE) (TY II)
|
EA
|
35.000
|
$5,200.000
|
$6,433.820
|
$6,550.000
|
$5,790.000
|
$4,525.747
|
$6,500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$3,500.000
|
$5,609.450
|
$6,000.000
|
$5,430.000
|
$7,960.350
|
$12,000.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 30 IN)
|
EA
|
4.000
|
$7,000.000
|
$11,872.830
|
$6,000.000
|
$8,090.000
|
$14,807.515
|
$17,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
1.000
|
$7,000.000
|
$13,961.530
|
$7,000.000
|
$8,300.000
|
$16,901.430
|
$15,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$7,500.000
|
$7,543.670
|
$10,500.000
|
$8,690.000
|
$10,650.225
|
$15,000.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
3.000
|
$11,000.000
|
$10,889.350
|
$13,500.000
|
$13,320.000
|
$13,683.600
|
$13,000.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$12,000.000
|
$11,699.380
|
$16,000.000
|
$15,410.000
|
$20,067.870
|
$21,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$25,000.000
|
$11,514.320
|
$16,500.000
|
$15,740.000
|
$22,701.970
|
$22,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$30,000.000
|
$18,400.870
|
$17,000.000
|
$21,970.000
|
$23,034.550
|
$23,000.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
2.000
|
$4,400.000
|
$2,950.230
|
$3,250.000
|
$5,540.000
|
$13,506.735
|
$8,800.000
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
3.000
|
$3,700.000
|
$3,292.410
|
$4,000.000
|
$5,640.000
|
$15,042.520
|
$8,200.000
|
|
|
SET (TY I) (30 IN) (6: 1) (C)
|
EA
|
1.000
|
$4,500.000
|
$3,292.420
|
$4,100.000
|
$6,140.000
|
$15,722.420
|
$8,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$1,491.130
|
$2,400.000
|
$2,830.000
|
$2,112.953
|
$6,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$1,668.890
|
$2,600.000
|
$1,990.000
|
$2,230.140
|
$7,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$2,500.000
|
$1,669.360
|
$2,600.000
|
$2,840.000
|
$1,883.433
|
$7,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$3,000.000
|
$2,066.770
|
$3,200.000
|
$2,040.000
|
$1,925.673
|
$8,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$3,500.000
|
$1,914.390
|
$4,000.000
|
$2,210.000
|
$2,095.603
|
$8,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
7.000
|
$3,500.000
|
$1,914.670
|
$3,800.000
|
$2,210.000
|
$1,871.357
|
$7,800.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$3,000.000
|
$1,914.490
|
$4,800.000
|
$2,210.000
|
$2,100.516
|
$6,600.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
23.000
|
$2,200.000
|
$2,338.200
|
$2,500.000
|
$2,320.000
|
$5,000.000
|
$3,000.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
1,028.000
|
$45.000
|
$150.350
|
$30.000
|
$75.000
|
$50.000
|
$90.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$3,331.860
|
$5,500.000
|
$50,000.000
|
$10,000.000
|
$70,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
45.000
|
$500.000
|
$515.350
|
$2,000.000
|
$2,500.000
|
$838.950
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$14,700,000.000
|
$17,000,000.000
|
$18,275,461.030
|
$18,500,000.000
|
$21,602,879.000
|
$20,320,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
75.000
|
$15,000.000
|
$5,523.190
|
$2,500.000
|
$15,000.000
|
$5,000.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
5,318.000
|
$40.000
|
$31.000
|
$39.890
|
$31.000
|
$39.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,318.000
|
$10.000
|
$8.000
|
$11.180
|
$8.000
|
$9.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,233.000
|
$36.000
|
$25.000
|
$36.130
|
$25.000
|
$39.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,233.000
|
$10.000
|
$8.000
|
$8.650
|
$8.000
|
$9.000
|
$12.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
19,939.000
|
$2.000
|
$4.000
|
$3.650
|
$4.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
30,562.000
|
$4.000
|
$2.950
|
$3.280
|
$2.950
|
$2.750
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
30,562.000
|
$1.000
|
$0.650
|
$0.530
|
$0.650
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,470.000
|
$6.000
|
$4.000
|
$6.560
|
$4.000
|
$2.750
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,470.000
|
$1.000
|
$1.000
|
$0.530
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
26,690.000
|
$85.000
|
$120.690
|
$115.000
|
$123.000
|
$140.160
|
$175.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
17,511.000
|
$50.000
|
$38.610
|
$40.000
|
$30.000
|
$50.000
|
$75.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
34,030.000
|
$8.000
|
$3.800
|
$5.000
|
$5.000
|
$5.000
|
$10.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
17,511.000
|
$10.000
|
$5.000
|
$6.500
|
$10.000
|
$5.000
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
23,368.000
|
$70.000
|
$60.500
|
$76.000
|
$77.250
|
$50.000
|
$95.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
1,502.000
|
$20.000
|
$5.870
|
$5.000
|
$33.000
|
$8.650
|
$18.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
5,306.000
|
$80.000
|
$68.290
|
$90.000
|
$110.000
|
$100.000
|
$73.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
83,466.000
|
$1.250
|
$0.850
|
$0.600
|
$0.600
|
$1.250
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,225.000
|
$25.000
|
$25.750
|
$25.340
|
$25.800
|
$24.500
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
42.000
|
$2,000.000
|
$1,750.000
|
$2,090.000
|
$1,750.000
|
$2,165.000
|
$2,050.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,500.000
|
$1,375.000
|
$1,580.000
|
$1,380.000
|
$1,550.000
|
$1,530.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
911.000
|
$2.500
|
$3.000
|
$2.450
|
$3.000
|
$2.500
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
40.000
|
$2,500.000
|
$3,050.000
|
$3,340.000
|
$3,050.000
|
$3,090.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$200.000
|
$330.000
|
$200.000
|
$200.000
|
$305.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
20.000
|
$2,000.000
|
$2,000.000
|
$1,850.000
|
$2,000.000
|
$3,250.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
17.000
|
$1,200.000
|
$1,650.000
|
$1,550.000
|
$800.000
|
$900.000
|
$1,650.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$20,000.000
|
$25,300.000
|
$27,250.000
|
$25,300.000
|
$25,850.000
|
$29,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
17.000
|
$20,000.000
|
$9,875.000
|
$8,650.000
|
$9,880.000
|
$10,800.000
|
$9,300.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
15.000
|
$200.000
|
$335.000
|
$284.200
|
$183.000
|
$335.000
|
$200.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
20.000
|
$1,200.000
|
$1,076.000
|
$1,160.290
|
$1,080.000
|
$1,076.000
|
$1,115.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
11.000
|
$2,000.000
|
$1,087.000
|
$1,206.840
|
$1,090.000
|
$1,087.000
|
$1,127.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
16.000
|
$35,000.000
|
$41,264.000
|
$45,860.920
|
$41,260.000
|
$41,264.000
|
$42,783.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
20,346.000
|
$8.000
|
$12.100
|
$7.680
|
$12.100
|
$12.100
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,031.000
|
$20.000
|
$15.550
|
$14.340
|
$15.600
|
$15.550
|
$16.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
2,020.000
|
$18.000
|
$18.510
|
$13.370
|
$18.500
|
$18.510
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
265.000
|
$25.000
|
$17.580
|
$17.270
|
$17.600
|
$17.580
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
105.000
|
$28.000
|
$26.100
|
$22.300
|
$26.100
|
$26.100
|
$27.000
|
|
|
CONDT (RM) (1 1/4")
|
LF
|
1,162.000
|
$25.000
|
$26.840
|
$16.060
|
$26.800
|
$26.840
|
$27.000
|
|
|
CONDT (RM) (2")
|
LF
|
465.000
|
$32.000
|
$29.410
|
$21.690
|
$29.400
|
$29.410
|
$30.000
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,372.000
|
$1.100
|
$1.050
|
$0.750
|
$1.050
|
$1.050
|
$1.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
2,714.000
|
$1.300
|
$1.060
|
$0.900
|
$1.050
|
$1.060
|
$1.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,215.000
|
$1.600
|
$1.430
|
$1.030
|
$1.450
|
$1.430
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
14,741.000
|
$1.650
|
$1.490
|
$1.470
|
$1.500
|
$1.490
|
$1.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
17,080.000
|
$1.700
|
$1.680
|
$1.530
|
$1.700
|
$1.680
|
$1.700
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
35,071.000
|
$1.750
|
$1.820
|
$2.120
|
$1.800
|
$1.820
|
$1.800
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,189.000
|
$1.800
|
$2.850
|
$2.380
|
$2.850
|
$2.850
|
$3.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
2,558.000
|
$2.000
|
$3.120
|
$2.980
|
$3.100
|
$3.120
|
$3.000
|
|
|
ELEC CONDR (NO.2/0) BARE
|
LF
|
2,385.000
|
$4.800
|
$8.380
|
$5.840
|
$8.400
|
$8.380
|
$8.000
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
8,430.000
|
$5.450
|
$9.090
|
$7.130
|
$9.100
|
$9.090
|
$9.000
|
|
|
ELEC CONDR (NO.3/0) BARE
|
LF
|
8.000
|
$10.000
|
$11.630
|
$12.730
|
$11.600
|
$10.700
|
$12.000
|
|
|
ELEC CONDR (NO.3/0) INSULATED
|
LF
|
12,750.000
|
$14.500
|
$11.630
|
$9.450
|
$11.600
|
$11.630
|
$12.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
16.000
|
$950.000
|
$835.000
|
$673.410
|
$835.000
|
$835.000
|
$866.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
63.000
|
$1,100.000
|
$923.000
|
$862.540
|
$923.000
|
$923.000
|
$956.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
8.000
|
$5,000.000
|
$7,910.000
|
$6,896.490
|
$7,910.000
|
$7,910.000
|
$8,200.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
2.000
|
$5,000.000
|
$7,090.000
|
$6,689.930
|
$7,090.000
|
$7,090.000
|
$7,300.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,198.000
|
$26.000
|
$24.880
|
$30.090
|
$24.900
|
$24.880
|
$25.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,238.000
|
$28.000
|
$22.660
|
$25.390
|
$29.700
|
$22.660
|
$23.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$500.000
|
$530.000
|
$551.150
|
$543.000
|
$530.000
|
$1,034.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
16.000
|
$510.000
|
$645.000
|
$628.290
|
$619.000
|
$645.000
|
$1,080.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
33.000
|
$600.000
|
$625.000
|
$616.110
|
$607.000
|
$625.000
|
$1,260.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$900.000
|
$640.000
|
$711.520
|
$701.000
|
$640.000
|
$1,246.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$600.000
|
$800.000
|
$975.420
|
$961.000
|
$800.000
|
$1,550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$700.000
|
$805.000
|
$1,049.510
|
$1,030.000
|
$805.000
|
$1,560.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$875.000
|
$790.000
|
$980.490
|
$966.000
|
$790.000
|
$1,512.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$905.000
|
$945.000
|
$1,022.110
|
$1,010.000
|
$945.000
|
$1,810.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
6.000
|
$940.000
|
$985.000
|
$1,022.110
|
$1,010.000
|
$985.000
|
$1,695.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
27.000
|
$395.000
|
$315.000
|
$518.670
|
$511.000
|
$315.000
|
$588.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
47.000
|
$485.000
|
$435.000
|
$523.740
|
$516.000
|
$435.000
|
$850.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$1,900.000
|
$2,900.000
|
$2,644.080
|
$2,610.000
|
$1,584.750
|
$1,643.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$1,900.000
|
$3,000.000
|
$2,752.680
|
$2,710.000
|
$1,617.490
|
$1,677.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
6.000
|
$1,000.000
|
$4,750.000
|
$3,796.100
|
$3,740.000
|
$4,750.000
|
$2,750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
67.000
|
$90.000
|
$100.000
|
$76.130
|
$75.000
|
$150.000
|
$90.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
6,184.700
|
$5.000
|
$5.740
|
$7.050
|
$5.750
|
$5.740
|
$8.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
2.000
|
$30,000.000
|
$32,269.740
|
$33,971.530
|
$32,270.000
|
$32,269.750
|
$34,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
4.000
|
$30,000.000
|
$33,166.970
|
$33,313.150
|
$33,170.000
|
$33,166.970
|
$34,388.000
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
2.000
|
$300.000
|
$3,560.000
|
$507.500
|
$3,560.000
|
$3,560.000
|
$3,691.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
222.000
|
$35.000
|
$27.000
|
$22.330
|
$18.000
|
$27.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$15.000
|
$27.000
|
$27.410
|
$18.000
|
$27.000
|
$27.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
80.000
|
$24.000
|
$30.000
|
$30.450
|
$18.000
|
$30.000
|
$31.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
146.000
|
$15.000
|
$27.000
|
$22.330
|
$18.000
|
$27.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
177.000
|
$18.000
|
$29.000
|
$24.360
|
$18.000
|
$29.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
53.000
|
$25.000
|
$35.000
|
$30.450
|
$18.000
|
$35.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
49.000
|
$85.000
|
$65.000
|
$135.000
|
$40.000
|
$65.000
|
$80.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
10,437.000
|
$0.500
|
$0.600
|
$0.410
|
$0.400
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
623.000
|
$1.000
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
54,094.000
|
$0.400
|
$0.600
|
$0.410
|
$0.400
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
51,606.000
|
$0.400
|
$0.600
|
$0.410
|
$0.400
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,001.000
|
$4.000
|
$5.000
|
$4.070
|
$4.000
|
$4.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
4,048.000
|
$3.500
|
$3.250
|
$3.050
|
$3.000
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
4,079.000
|
$3.500
|
$3.250
|
$3.050
|
$3.000
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
396.000
|
$1.000
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
162.000
|
$0.800
|
$2.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
11,969.000
|
$0.900
|
$1.500
|
$0.730
|
$0.700
|
$0.720
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
409.000
|
$6.000
|
$10.000
|
$6.110
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
10.000
|
$150.000
|
$150.000
|
$132.340
|
$130.000
|
$130.000
|
$131.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
11.000
|
$170.000
|
$250.000
|
$178.150
|
$175.000
|
$175.000
|
$177.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
|
EA
|
2.000
|
$200.000
|
$250.000
|
$239.230
|
$235.000
|
$235.000
|
$237.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
6.000
|
$140.000
|
$225.000
|
$162.880
|
$160.000
|
$160.000
|
$161.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
21,420.000
|
$0.250
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
396.000
|
$0.500
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
102,474.000
|
$0.250
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
162.000
|
$1.000
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
11,607.000
|
$0.500
|
$0.400
|
$0.360
|
$0.350
|
$0.350
|
$0.350
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
246.000
|
$3.000
|
$2.500
|
$3.050
|
$3.000
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
3.000
|
$60.000
|
$55.000
|
$66.170
|
$65.000
|
$65.000
|
$65.000
|
|
REFL PAV MRK TY II (W) (DBL ARROW)
|
EA
|
8.000
|
$80.000
|
$100.000
|
$86.530
|
$85.000
|
$85.000
|
$85.000
|
|
REFL PAV MRK TY II (W) (UTURN ARROW)
|
EA
|
2.000
|
$105.000
|
$100.000
|
$101.800
|
$100.000
|
$100.000
|
$101.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
6.000
|
$75.000
|
$125.000
|
$76.350
|
$75.000
|
$75.000
|
$76.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
102,474.000
|
$0.110
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
21,600.000
|
$0.600
|
$0.600
|
$0.510
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
109,994.000
|
$0.600
|
$0.600
|
$0.490
|
$0.500
|
$0.480
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
790.000
|
$0.600
|
$1.000
|
$1.020
|
$1.000
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
110,766.000
|
$0.600
|
$0.600
|
$0.490
|
$0.500
|
$0.480
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
56.000
|
$3.000
|
$7.000
|
$4.070
|
$4.000
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
394.000
|
$3.000
|
$6.500
|
$3.360
|
$3.300
|
$3.300
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,531.000
|
$3.300
|
$6.000
|
$3.360
|
$3.300
|
$3.300
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
191,623.000
|
$0.250
|
$0.240
|
$0.180
|
$0.200
|
$0.500
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
224,633.000
|
$1.300
|
$0.200
|
$0.030
|
$0.050
|
$0.030
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
11,607.000
|
$0.300
|
$0.400
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
409.000
|
$1.250
|
$2.000
|
$2.040
|
$2.000
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$44.000
|
$55.000
|
$50.900
|
$50.000
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
9.000
|
$50.000
|
$75.000
|
$50.900
|
$50.000
|
$50.000
|
$51.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$60.000
|
$75.000
|
$50.900
|
$50.000
|
$50.000
|
$51.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$46.000
|
$100.000
|
$50.900
|
$50.000
|
$50.000
|
$51.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
89,920.000
|
$105.000
|
$116.800
|
$110.000
|
$123.000
|
$119.230
|
$140.000
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
444.000
|
$110.000
|
$183.540
|
$125.000
|
$198.000
|
$192.040
|
$205.000
|
|
|
TACK COAT
|
GAL
|
16,682.000
|
$4.000
|
$5.000
|
$6.000
|
$5.600
|
$5.450
|
$6.000
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
892.000
|
$200.000
|
$222.040
|
$130.000
|
$241.000
|
$234.040
|
$300.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
2,915.000
|
$110.000
|
$154.400
|
$150.000
|
$165.000
|
$160.250
|
$200.000
|
|
|
TACK COAT
|
GAL
|
1,116.000
|
$4.000
|
$5.000
|
$6.000
|
$5.600
|
$5.450
|
$6.000
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
18,850.000
|
$4.000
|
$7.750
|
$7.500
|
$8.700
|
$11.770
|
$9.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$20,000.000
|
$11,142.150
|
$18,943.750
|
$15,700.000
|
$1,000.000
|
$15,000.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
4.000
|
$10,000.000
|
$6,770.000
|
$6,988.690
|
$6,770.000
|
$6,770.000
|
$7,000.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
2.000
|
$30,000.000
|
$29,085.000
|
$6,882.620
|
$29,090.000
|
$29,085.000
|
$30,000.000
|
|
|
ITS POLE (20 FT)(90 MPH)
|
EA
|
4.000
|
$8,000.000
|
$8,938.000
|
$8,552.260
|
$8,940.000
|
$8,938.000
|
$10,000.000
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
4.000
|
$7,000.000
|
$5,770.000
|
$5,742.420
|
$5,770.000
|
$5,770.000
|
$6,000.000
|
|
|
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
|
EA
|
1.000
|
$25,000.000
|
$29,219.750
|
$32,655.990
|
$29,220.000
|
$29,219.750
|
$30,000.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
15.000
|
$20,000.000
|
$28,901.750
|
$33,060.260
|
$28,920.000
|
$28,919.750
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
153.000
|
$160.000
|
$1,162.460
|
$250.000
|
$162.000
|
$365.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
62.000
|
$100.000
|
$1,162.460
|
$250.000
|
$271.000
|
$517.000
|
$250.000
|
|
|
NEW WATER SERVICE (3/4")
|
EA
|
1.000
|
$300.000
|
$2,440.680
|
$1,600.000
|
$5,000.000
|
$1,406.000
|
$2,000.000
|
|
|
WATER MAIN (PVC)(SDR 21 D2241RJ)(3")
|
LF
|
780.000
|
$50.000
|
$47.720
|
$38.000
|
$50.000
|
$73.100
|
$110.000
|
|
|
CONNECT TO EXISTING MAIN (3")
|
EA
|
2.000
|
$1,000.000
|
$1,928.420
|
$3,800.000
|
$1,500.000
|
$2,111.000
|
$8,000.000
|
|
|
REMOVE EXIST WATER PIPE (3")
|
LF
|
676.000
|
$15.000
|
$4.880
|
$8.000
|
$25.000
|
$23.800
|
$22.000
|
|
|
GATE VALVE & BOX (3")
|
EA
|
2.000
|
$900.000
|
$3,041.710
|
$2,200.000
|
$2,500.000
|
$1,967.000
|
$1,500.000
|
|
|
CASING (STEEL)(BY DRY BORE)(10")
|
LF
|
40.000
|
$300.000
|
$136.630
|
$500.000
|
$250.000
|
$857.850
|
$2,500.000
|
|
Totals: |
$150,506,214.090
|
$172,799,108.072
|
$182,816,096.995
|
$187,266,075.725
|
$197,961,185.542
|
$215,777,432.190
|