PARKER IH0020 (6383-10-001)

Items: 31

County: PARKER
Length: N/A
Highway: IH0020
District: FORT WORTH
Control Number: 6383-10-001
DBE Goal: N/A
Project: RMC - 638310001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,196,205.76
Date: 05/05/2022 (4 years ago)
Contract Number: N/A
Type: GUARDRAIL INSTALLATION & REPAIR
Mail/Deliver Bids To: N/A
KLINTON KUNTZ
CLINTON HYATT
TRAVIS EHRLICH
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$1,196,205.76
$1,579,568.00
Over/Under Est: 32.05% $383,362.24
$2,179,920.00
Over/Under Est: 82.24% $983,714.24
Amt Left: 38.01% $600,352.00

Bid Items & Bid Tabulations

31 Total 0 of 31
PARKER  |  IH0020  |  FORT WORTH  |  6383-10-001  |  05/05/2022  |  $1,196,205.76  |  RMC - 638310001  |  GUARDRAIL INSTL & REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SHORT-LINE CORPORATION
VANN/ELLI, INC.
MOBILIZATION (CALLOUT)
EA 48.000 $260.210 $1.000 $450.000
MOBILIZATION (EMERGENCY)
EA 10.000 $655.670 $1,000.000 $2,250.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,946.810 $1,500.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $2,009.350 $1,000.000 $1,620.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,055.560 $2,500.000 $3,780.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 15,000.000 $3.710 $15.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,000.000 $15.940 $35.000 $82.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $52.780 $1.000 $82.000
REALIGN POSTS
EA 250.000 $76.820 $100.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 900.000 $81.460 $1.000 $18.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $11.250 $15.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 75.000 $70.830 $50.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $3,128.950 $3,000.000 $3,780.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,233.330 $1,000.000 $900.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $24.240 $200.000 $180.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $38.380 $100.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $56.620 $1.000 $100.000
REPLACE SGT STRUT
EA 5.000 $52.330 $1.000 $100.000
REPLACE POSTS (TL-3)
EA 2,100.000 $170.530 $200.000 $235.000
REPLACE POSTS (TL-4)
EA 2,500.000 $95.000 $200.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $164.810 $1.000 $450.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $75.000 $1.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 15.000 $1,204.050 $1,500.000 $2,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 15.000 $1,636.360 $1,500.000 $2,000.000
REPLACE CABLE (TL-3)
LF 300.000 $4.740 $1.000 $10.000
CHECK / RE-TENSION CABLE
EA 50.000 $1,035.880 $100.000 $270.000
REPLACE POST HARDWARE (TL-4)
EA 300.000 $21.880 $100.000 $45.000
REPAIR (TRACC)
EA 2.000 $3,181.820 $5,000.000 $5,000.000
REPAIR (WIDE TRACC)
EA 2.000 $3,500.000 $5,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $40.450 $100.000 $135.000
TMA (MOBILE OPERATION)
DAY 150.000 $50.000 $100.000 $180.000
Totals: $1,196,205.760 $1,579,568.000 $2,179,920.000