Job Info for 0365-01-051

County: PARKER Highway: SH 171 Date: 06/04/2020 (4 years ago) Engineer's Estimate: $360,037 Control Number: 0365-01-051
Project: C 365-1-51 District: FORT WORTH Time: 85 WORKING DAYS Type: LANDSCAPE DEVELOPMENT

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $360,037.40
CENTRAL NORTH CONSTRUCTION, LLC   $321,472.00 1
-10.71% | -$38,565.40
C. GREEN SCAPING, L.P.   $352,706.00 2
-2.04% | -$7,331.40
9.72% | $31,234.00

Bid Items

Items: 24, 0 filtered
PARKER SH 171  |  FORT WORTH  |  0365-01-051  |  06/04/2020  |  $360,037  |  C 365-1-51  |  LANDSCAPE DEVELOPMENT  |  85 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CENTRAL NORTH CONSTRUCTION, LLC C. GREEN SCAPING, L.P.
100 6001 PREPARING ROW AC 0.370 $20,000.000 $150,000.000 $108,078.380
104 6021 REMOVING CONC (CURB) LF 657.000 $20.000 $10.000 $10.000
104 6040 REMOVING CONC (PAVERS) SY 1,423.000 $15.000 $15.000 $13.500
161 6017 COMPOST MANUF TOPSOIL (4") SY 1,725.000 $5.000 $4.250 $13.400
170 6001 IRRIGATION SYSTEM LS 1.000 $55,000.000 $65,000.000 $60,000.000
192 6002 PLANT MATERIAL (1-GAL) EA 846.000 $15.000 $9.000 $6.000
192 6013 MULCH SY 370.000 $5.000 $4.000 $4.500
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA 9.000 $350.000 $220.000 $200.000
192 6068 LANDSCAPE EDGE (TYPE II) LF 1,225.000 $25.000 $21.000 $26.000
192 6097 CONC LNDSCP EDG (12 IN WIDTH) LF 301.000 $22.000 $21.000 $21.000
193 6001 PLANT MAINTENANCE MO 12.000 $2,000.000 $1,600.000 $1,480.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 12.000 $750.000 $1,000.000 $320.000
500 6001 MOBILIZATION LS 1.000 $33,000.000 $13,000.000 $13,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $10,000.000 $1,500.000 $3,600.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 4,279.000 $4.500 $0.200 $3.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 4,279.000 $1.100 $0.050 $1.500
529 6005 CONC CURB (MONO) (TY II) LF 657.000 $20.000 $28.000 $29.000
531 6001 CONC SIDEWALKS (4") SY 9.000 $100.000 $225.000 $72.000
618 6024 CONDT (PVC) (SCH 40) (2") (BORE) LF 322.000 $26.000 $25.000 $27.000
618 6034 CONDT (PVC) (SCH 40) (4") (BORE) LF 322.000 $28.000 $25.000 $29.000
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 51.000 $200.000 $300.000 $165.000
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 39.000 $300.000 $85.000 $474.000
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 40.000 $250.000 $300.000 $525.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 28.000 $225.000 $150.000 $115.000
Totals: $360,037.40 $321,472.00 $352,706.00