PARKER IH 20 (0008-03-124)

Items: 76

County: PARKER
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0008-03-124
DBE Goal: N/A
Project: C 8-3-124
Guaranty: N/A
Time: 256 WORKING DAYS
Engineer's Estimate: $23,237,244.35
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
KOREY COBURN
CHADWICK DABBS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$23,237,244.35
$18,575,904.96
Over/Under Est: -20.06% -$4,661,339.39
Over/Under Est: -5.85% -$1,359,719.51
Amt Left: 17.77% $3,301,619.88
Over/Under Est: 8.62% $2,002,622.54
Amt Left: 35.87% $6,663,961.93
Delta: -15.37% -$3,362,342.05
Subcontractor Percentage Amount
O. TREVINO CONSTRUCTION, LLC 10.73% $1,859,978.73
JR WEST TEXAS CONCRETE LLC 6.02% $1,043,529.54
TRP CONSTRUCTION GROUP, LLC 3.59% $622,304.16
FORTSON CONTRACTING, INC. 3.00% $520,031.33
BUYERS BARRICADES, INC. 2.10% $364,021.93
ACT SAW CUTTING & REMOVAL 1.74% $301,618.17
JAY MILLS CONTRACTING, INCORPORATED 0.49% $84,938.45
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.34% $58,936.88
PROFESSIONAL TRAFFIC CONTROL LLC 0.10% $17,334.38
Total: 28.11% $4,872,693.57

Bid Items & Bid Tabulations

76 Total 0 of 76
PARKER  |  IH 20  |  FORT WORTH  |  0008-03-124  |  02/02/2023  |  $23,237,244.35  |  C 8-3-124  |  RESURF ROADWAY  |  256 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NORTHEASTERN PAVERS, LLC
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
REMOVING CONCRETE(MOW STRIP)
LF 17,209.000 $10.000 $10.500 $10.500 $15.000
BACKFILL (TY A)
STA 773.290 $165.000 $100.000 $159.460 $240.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 10,976.000 $1.000 $0.560 $0.640 $0.520
VEGETATIVE WATERING
MG 384.000 $400.000 $25.000 $50.000 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,250.000 $80.000 $55.000 $108.060 $115.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 562,885.000 $2.000 $2.150 $2.000 $2.700
PAV JT UNDERSEAL (24")
LF 1,944.000 $25.000 $18.000 $30.000 $35.000
FULL-DEPTH REPAIR CRCP (6"-7")
SY 50.000 $290.000 $400.000 $350.000 $425.000
FULL-DEPTH REPAIR CRCP (8"-10")
SY 6,350.000 $320.000 $295.000 $261.000 $315.000
CEM STABIL BKFL
CY 50.000 $200.000 $600.000 $700.000 $755.000
FLOWABLE BACKFILL
CY 50.000 $200.000 $600.000 $700.000 $755.000
CL C CONC (RAIL FOUNDATION)
CY 108.000 $550.000 $1,350.000 $1,300.000 $775.000
RIPRAP (MOW STRIP)(4 IN)
CY 898.000 $550.000 $625.000 $653.660 $755.000
CLEANING AND SEALING EXISTING JOINTS
LF 154,800.000 $5.000 $2.250 $1.800 $6.500
CLEANING EXISTING JOINTS
LF 1,944.000 $40.000 $12.000 $25.000 $30.000
RAIL (TY T80PP)
LF 600.000 $200.000 $180.000 $180.000 $300.000
MOBILIZATION
LS 1.000 $2,112,477.000 $1,520,000.000 $2,187,752.480 $2,419,036.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $25,000.000 $5,000.000 $40,000.000 $30,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 200.000 $36.000 $62.000 $62.000 $78.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $15.000 $20.000 $19.000 $18.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,650.000 $5.000 $3.000 $3.750 $3.400
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,650.000 $1.000 $1.000 $1.000 $1.000
RUMBLE STRIPS (SHOULDER)
LF 144,199.000 $0.500 $0.200 $0.080 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 13,450.000 $26.000 $22.000 $19.500 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 30.000 $2,100.000 $2,000.000 $1,775.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 36.000 $1,310.000 $1,150.000 $1,000.000 $1,150.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 21.000 $900.000 $800.000 $700.000 $795.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 1.000 $900.000 $800.000 $700.000 $795.000
REMOVE METAL BEAM GUARD FENCE
LF 12,900.000 $2.500 $3.000 $1.750 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 23.000 $200.000 $125.000 $125.000 $145.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $210.000 $125.000 $125.000 $145.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 15.000 $230.000 $200.000 $200.000 $235.000
GUARDRAIL END TREATMENT (INSTALL)
EA 41.000 $3,100.000 $3,000.000 $2,700.000 $3,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 36.000 $260.000 $225.000 $200.000 $235.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $650.000 $975.000 $862.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 32.000 $850.000 $1,225.000 $1,088.000 $1,450.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 4.000 $2,600.000 $2,650.000 $2,355.000 $3,100.000
REMOVE SM RD SN SUP&AM
EA 28.000 $120.000 $175.000 $157.000 $210.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 196.000 $30.000 $22.000 $20.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 116.000 $25.000 $22.000 $20.000 $22.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 38,686.000 $0.500 $0.750 $0.750 $0.820
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 2,511.000 $1.000 $1.000 $1.000 $1.100
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 85,151.000 $0.500 $0.750 $0.750 $0.830
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 18,712.000 $1.000 $0.920 $0.920 $1.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 11,304.000 $3.000 $3.000 $3.000 $3.300
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 16.000 $85.000 $100.000 $100.000 $108.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 16.000 $110.000 $125.000 $125.000 $135.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 86,507.000 $0.500 $0.750 $0.750 $0.830
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 38,686.000 $0.500 $0.600 $0.600 $0.670
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 2,511.000 $1.000 $1.000 $1.000 $1.100
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 85,151.000 $0.500 $0.600 $0.600 $0.670
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 18,712.000 $1.500 $0.800 $0.800 $0.880
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 11,304.000 $4.000 $2.000 $2.000 $2.200
WK ZN PAV MRK REMOV (W)(ARROW)
EA 16.000 $150.000 $85.000 $100.000 $110.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 16.000 $150.000 $85.000 $125.000 $136.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 86,507.000 $0.500 $0.600 $0.600 $0.670
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 340.000 $2.000 $1.650 $1.650 $1.770
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 18,712.000 $1.000 $0.920 $0.920 $1.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 2,171.000 $3.000 $2.250 $2.250 $2.450
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 11,304.000 $4.000 $3.750 $3.750 $4.250
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $135.000 $125.000 $125.000 $135.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 8.000 $200.000 $130.000 $130.000 $138.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $160.000 $150.000 $150.000 $170.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 38,686.000 $0.500 $0.630 $0.700 $0.780
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 85,151.000 $0.500 $0.630 $0.700 $0.780
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 86,507.000 $0.500 $0.630 $0.700 $0.780
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 5.000 $3,000.000 $2,600.000 $3,250.000 $3,600.000
REFL PAV MRKR TY II-C-R
EA 5,418.000 $4.000 $4.000 $5.000 $5.550
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 6,350.000 $115.000 $85.000 $140.970 $156.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 64,733.000 $185.000 $151.250 $175.340 $191.500
UNDERSEAL COURSE
GAL 112,577.000 $5.000 $0.010 $4.690 $4.300
PORTABLE CHANGEABLE MESSAGE SIGN
EA 15.000 $9,500.000 $1,500.000 $162.000 $22,000.000
TMA (STATIONARY)
DAY 393.000 $250.000 $225.000 $399.000 $380.000
TMA (MOBILE OPERATION)
DAY 78.000 $150.000 $0.010 $100.000 $380.000
TEMP Q-DETECT SYS
EA 5.000 $80,000.000 $60,000.000 $38,750.000 $14,000.000
TEMP Q-DETECT SYS (RELOCATE)
EA 109.000 $400.000 $1,100.000 $292.980 $450.000
Totals: $23,237,244.350 $18,575,904.960 $21,877,524.843 $25,239,866.890