PANOLA FM 123 (0731-01-058)

Items: 49

County: PANOLA
Length: 2.9660 MILES
Highway: FM 123
District: ATLANTA
Control Number: 0731-01-058
DBE Goal: 0.0%
Project: SSW 731-1-58
Guaranty: $47,000.00
Time: 141 WORKING DAYS
Engineer's Estimate: $1,973,067.92
Date: 07/01/2026 1:00 PM CDT (17 days ago)
Contract Number: 7263017
Type: WIDEN ROAD - ADD SHOULDERS
Project ID: A00206280
Project Description: WIDEN EXISTING 2-LANE ROADWAY TO ADD SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,973,067.92
Over/Under Est: 23.72% $468,083.14
$2,452,219.03
Over/Under Est: 24.28% $479,151.11
Amt Left: 0.45% $11,067.97
Over/Under Est: 36.64% $722,922.27
Amt Left: 10.44% $254,839.13
Delta: -9.94% -$243,771.16
Over/Under Est: 37.07% $731,389.41
Amt Left: 10.79% $263,306.27
Delta: -0.31% -$8,467.14

Bid Items & Bid Tabulations

49 Total 0 of 49
PANOLA  |  FM 123  |  ATLANTA  |  0731-01-058  |  07/01/2026 1:00 PM CDT  |  $1,973,067.92  |  SSW 731-1-58  |  WIDEN ROAD - ADD SHOULDERS  |  141 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
THK CONSTRUCTION LLC
L. S. EQUIPMENT CO., INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 106.500 $1,000.000 $2,470.000 $1,250.000 $3,050.000 $4,000.000
REMOV CONC (DRIVEWAYS)
SY 79.000 $16.000 $24.000 $50.000 $10.000 $30.000
SUBGR WIDEN (OC)
STA 109.520 $300.000 $255.000 $300.000 $425.000 $335.000
EMBANK (VEH)(OC)(TY C)
CY 1,428.000 $28.000 $16.000 $25.000 $25.000 $25.000
BACKFILL (TY B)
STA 153.180 $240.000 $202.000 $220.000 $200.000 $175.000
BLADING
STA 153.180 $150.000 $182.000 $160.000 $125.000 $100.000
FURN & PLACE TOPSOIL (VEH)
CY 1,080.000 $2.000 $19.000 $30.000 $45.000 $35.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 41,022.000 $0.600 $0.480 $0.530 $0.530 $0.520
BOND FBR MTRX SEED (TEMP)(WARM)
SY 20,511.000 $0.600 $0.480 $0.530 $0.510 $0.520
BOND FBR MTRX SEED (TEMP)(COOL)
SY 20,511.000 $0.600 $0.480 $0.530 $0.510 $0.520
VEGETATIVE WATERING
TGL 1,312.700 $0.150 $12.000 $20.000 $0.010 $10.000
FL BS (CMP IN PLC)(TY A GR 1-2) (10")
SY 8,543.000 $25.000 $37.040 $39.040 $52.500 $45.000
PRIME COAT (MC-30)
GAL 1,689.000 $5.500 $7.500 $10.000 $8.000 $6.000
ASPH (AC-20-5TR)
GAL 7,473.000 $3.670 $7.250 $10.000 $5.250 $6.000
AGGR (TY-PB, GR-4)
CY 54.000 $230.000 $500.000 $400.000 $290.000 $375.000
SP MIXES SP-C SAC-A PG76-22
TON 5,548.000 $150.000 $160.000 $183.560 $152.220 $169.000
TACK COAT
GAL 1,014.000 $3.200 $5.000 $7.350 $5.000 $5.000
PLANE ASPH CONC PAV(0" TO 2")
SY 9,403.000 $4.000 $10.000 $2.200 $6.040 $5.000
RIPRAP (CONC)(CL B)
CY 125.000 $300.000 $860.000 $850.000 $875.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 86.000 $400.000 $855.000 $800.000 $950.000 $700.000
RC PIPE (CL III)(18 IN)
LF 216.000 $80.000 $65.000 $65.000 $60.000 $60.000
RC PIPE (CL III)(24 IN)
LF 8.000 $90.000 $125.000 $100.000 $85.000 $150.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $875.000 $885.000 $1,000.000 $900.000 $900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,200.000 $1,510.000 $1,200.000 $1,300.000 $1,325.000
REMOV STR (PIPE)
LF 180.000 $12.000 $17.000 $10.000 $10.000 $15.000
MOBILIZATION
LS 1.000 $205,000.000 $160,000.000 $190,000.000 $250,000.000 $190,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,000.000 $2,600.000 $1,477.720 $5,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 160.000 $45.000 $37.000 $40.700 $34.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $15.000 $8.000 $8.800 $8.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $4.000 $3.500 $7.000 $3.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,000.000 $1.000 $0.350 $0.010 $1.000 $0.500
DRIVEWAYS (CONC)
SY 79.000 $129.000 $135.000 $120.000 $250.000 $135.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 6,236.000 $0.300 $1.250 $1.310 $1.300 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,950.000 $26.500 $23.500 $26.130 $24.500 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,020.000 $3,050.000 $3,355.000 $3,300.000 $3,275.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 4.000 $300.000 $401.000 $441.100 $405.000 $440.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $1,000.000 $1,085.000 $1,193.500 $1,095.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,090.000 $1,243.000 $1,367.300 $1,275.000 $1,350.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 9.000 $525.000 $604.000 $664.400 $655.000 $650.000
REMOVE SM RD SN SUP&AM
EA 1.000 $110.000 $101.000 $111.100 $101.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $30.000 $45.000 $49.500 $33.500 $45.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 14.000 $15.000 $131.000 $144.100 $131.000 $145.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,015.000 $1.500 $1.850 $1.070 $1.750 $0.650
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 31,176.000 $1.000 $0.800 $0.660 $0.850 $1.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 22,911.000 $1.000 $0.800 $0.660 $0.850 $1.000
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 2,055.000 $1.000 $1.000 $0.720 $1.050 $1.100
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 3,118.000 $3.300 $5.000 $3.580 $5.250 $5.500
REFL PAV MRKR TY II-A-A
EA 390.000 $4.250 $6.500 $4.680 $7.000 $6.750
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 4.000 $425.000 $2,000.000 $500.000 $450.000 $1,000.000
Totals: $1,973,067.915 $2,441,151.060 $2,452,219.030 $2,695,990.187 $2,704,457.330
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $29,650.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $14,000.00
Total: $43,650.00