PREPARING ROW
|
STA
|
3.000
|
$3,000.000
|
$3,500.000
|
$1,500.000
|
$17,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
63.000
|
$15.000
|
$20.000
|
$22.000
|
$45.000
|
|
|
EMBANKMENT (VEHICLE)(DENS CONT)(TY C)
|
CY
|
1,230.000
|
$17.500
|
$10.000
|
$14.250
|
$22.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY D)
|
CY
|
300.000
|
$12.000
|
$10.000
|
$12.000
|
$22.000
|
|
|
BACKFILL (TY A)
|
STA
|
12.700
|
$1,500.000
|
$600.000
|
$450.000
|
$2,000.000
|
|
|
BACKFILL (TY B)
|
STA
|
15.200
|
$300.000
|
$350.000
|
$375.000
|
$270.000
|
|
|
BLADING
|
STA
|
12.000
|
$300.000
|
$300.000
|
$720.000
|
$300.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
22.900
|
$500.000
|
$400.000
|
$800.000
|
$500.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
4,244.000
|
$0.100
|
$0.120
|
$0.180
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
4,244.000
|
$0.100
|
$0.120
|
$0.150
|
$0.300
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
8,487.000
|
$1.250
|
$0.850
|
$1.000
|
$1.500
|
|
|
VEGETATIVE WATERING
|
MG
|
136.000
|
$15.000
|
$12.000
|
$2.000
|
$19.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
1,000.000
|
$2.000
|
$2.000
|
$1.700
|
$2.680
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
500.000
|
$4.000
|
$3.500
|
$2.300
|
$3.850
|
|
|
CEMENT
|
TON
|
110.000
|
$175.000
|
$165.000
|
$190.000
|
$178.720
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
7,039.000
|
$3.000
|
$3.000
|
$2.250
|
$6.610
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,761.000
|
$4.500
|
$6.000
|
$4.400
|
$8.580
|
|
|
D-GR HMA(SQ) TY-F SAC-A PG64-22
|
TON
|
306.000
|
$120.000
|
$185.000
|
$125.000
|
$240.350
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
882.000
|
$110.000
|
$134.000
|
$105.000
|
$138.990
|
|
|
CONC PVMT (JOINTED - CPCD) (9")
|
SY
|
5,323.000
|
$80.000
|
$68.000
|
$85.000
|
$90.740
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$225.000
|
$300.000
|
$270.000
|
$371.000
|
|
|
CL A CONC (CURB OUTLET)(TY I)
|
EA
|
2.000
|
$2,700.000
|
$1,500.000
|
$1,550.000
|
$1,191.470
|
|
|
CL A CONC (CURB OUTLET)(TY II)
|
EA
|
2.000
|
$2,300.000
|
$1,500.000
|
$1,350.000
|
$1,105.710
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
43.000
|
$600.000
|
$450.000
|
$475.000
|
$535.410
|
|
|
ARMOR JOINT
|
LF
|
60.000
|
$60.000
|
$250.000
|
$55.000
|
$58.730
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
84.000
|
$45.000
|
$45.000
|
$45.000
|
$61.830
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
44.000
|
$65.000
|
$60.000
|
$55.000
|
$71.390
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$85.000
|
$150.000
|
$90.000
|
$94.420
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$800.000
|
$600.000
|
$625.000
|
$680.670
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$800.000
|
$750.000
|
$661.170
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,700.000
|
$1,200.000
|
$1,000.000
|
$966.750
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
2.000
|
$800.000
|
$800.000
|
$375.000
|
$850.340
|
|
|
REMOV STR (PIPE)
|
LF
|
104.000
|
$15.000
|
$11.000
|
$12.000
|
$22.560
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$107,174.310
|
$120,000.000
|
$100,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,000.000
|
$7,000.000
|
$2,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
90.000
|
$35.000
|
$33.000
|
$37.500
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
90.000
|
$10.000
|
$2.000
|
$19.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,410.000
|
$3.000
|
$3.000
|
$3.050
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,410.000
|
$1.000
|
$1.000
|
$1.200
|
$1.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,694.000
|
$45.000
|
$35.000
|
$38.000
|
$47.530
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
872.000
|
$5.000
|
$15.000
|
$22.000
|
$27.210
|
|
|
DRIVEWAYS (CONC)
|
SY
|
89.000
|
$80.000
|
$90.000
|
$86.000
|
$126.740
|
|
|
DRIVEWAYS (ACP)
|
SY
|
153.000
|
$60.000
|
$55.000
|
$50.000
|
$51.420
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$2,500.000
|
$3,500.000
|
$3,250.000
|
$5,830.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
10.000
|
$15.000
|
$30.000
|
$27.500
|
$53.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
48.000
|
$30.000
|
$30.000
|
$44.000
|
$47.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$500.000
|
$800.000
|
$820.000
|
$583.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
4.000
|
$700.000
|
$900.000
|
$910.000
|
$689.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$950.000
|
$1,200.000
|
$1,175.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$450.000
|
$550.000
|
$545.000
|
$901.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$80.000
|
$100.000
|
$88.000
|
$68.900
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
97.000
|
$4.000
|
$4.500
|
$5.500
|
$4.510
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,420.000
|
$1.000
|
$1.000
|
$1.650
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
88.000
|
$7.000
|
$9.000
|
$8.250
|
$8.690
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
221.000
|
$3.000
|
$3.000
|
$5.500
|
$2.860
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,244.000
|
$1.500
|
$1.000
|
$1.650
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
215.000
|
$2.000
|
$3.000
|
$1.200
|
$0.480
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,235.000
|
$0.400
|
$0.200
|
$0.550
|
$0.170
|
|
|
PAVEMENT SEALER 8"
|
LF
|
532.000
|
$0.500
|
$0.330
|
$0.550
|
$0.320
|
|
|
PAVEMENT SEALER 24"
|
LF
|
60.000
|
$3.000
|
$1.100
|
$5.500
|
$1.060
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
20.000
|
$15.000
|
$8.000
|
$22.000
|
$7.420
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
532.000
|
$7.000
|
$6.000
|
$4.400
|
$5.880
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
60.000
|
$12.000
|
$22.000
|
$14.850
|
$21.190
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
20.000
|
$40.000
|
$33.000
|
$60.000
|
$31.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
58.000
|
$4.000
|
$5.800
|
$5.500
|
$5.620
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,220.000
|
$0.500
|
$0.330
|
$0.550
|
$0.320
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
54.000
|
$6.000
|
$5.500
|
$2.200
|
$5.300
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,235.000
|
$0.200
|
$0.220
|
$0.060
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
532.000
|
$0.250
|
$0.660
|
$0.220
|
$0.640
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
60.000
|
$3.000
|
$2.200
|
$2.200
|
$2.120
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
20.000
|
$10.000
|
$15.000
|
$22.000
|
$13.090
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$9,000.000
|
$16,000.000
|
$10,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$20.000
|
$18.000
|
$13.750
|
$16.960
|
|
|
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
|
LF
|
4,631.000
|
$0.600
|
$0.600
|
$1.100
|
$0.580
|
|
|
REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)
|
LF
|
3,264.000
|
$0.600
|
$0.600
|
$1.100
|
$0.580
|
|
|
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
|
LF
|
90.000
|
$0.600
|
$1.100
|
$1.100
|
$1.060
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$4,400.000
|
$15,000.000
|
$22,000.000
|
$12,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$75.000
|
$1.000
|
$22.000
|
$40.000
|
|
Totals: |
$1,214,917.360
|
$1,204,986.390
|
$1,242,646.360
|
$1,592,008.160
|