Job Info for 0063-04-061

County: PANOLA Highway: US 59 Date: 11/06/2019 (5 years ago) Engineer's Estimate: $130,055 Control Number: 0063-04-061
Project: BR 2020(285) District: ATLANTA Time: 36 WORKING DAYS Type: METAL BEAM GUARD FENCE AND MOWSTRIP

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $130,055.00
EAST TEXAS BRIDGE, INC.   $134,765.00 1
3.62% | $4,710.00
CDM HOLDINGS, LLC   $148,303.50 2
14.03% | $18,248.50
10.05% | $13,538.50
STATELINE CONSTRUCTION, LLC   $172,825.00 3
32.89% | $42,770.00
28.24% | $38,060.00
16.53% | $24,521.50
FNH CONSTRUCTION, LLC   $204,350.00 4
57.13% | $74,295.00
51.63% | $69,585.00
18.24% | $31,525.00

Bid Items

Items: 15, 0 filtered
PANOLA US 59  |  ATLANTA  |  0063-04-061  |  11/06/2019  |  $130,055  |  BR 2020(285)  |  METAL BEAM GUARD FENCE AND MOWSTRIP  |  36 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate EAST TEXAS BRIDGE, INC. CDM HOLDINGS, LLC STATELINE CONSTRUCTION, LLC FNH CONSTRUCTION, LLC
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 24.000 $50.000 $30.000 $0.000 $300.000 $50.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 200.000 $1.000 $4.500 $0.000 $6.000 $3.000
168 6001 VEGETATIVE WATERING MG 4.000 $20.000 $25.000 $0.000 $500.000 $1,000.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 58.000 $525.000 $500.000 $0.000 $800.000 $650.000
500 6001 MOBILIZATION LS 1.000 $9,500.000 $13,000.000 $0.000 $17,000.000 $20,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $2,500.000 $10,000.000 $0.000 $2,500.000 $8,500.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 850.000 $30.000 $21.500 $0.000 $22.500 $25.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,000.000 $1,250.000 $0.000 $1,500.000 $1,850.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 850.000 $4.000 $3.000 $0.000 $5.000 $5.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $300.000 $250.000 $0.000 $275.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,000.000 $2,700.000 $0.000 $3,000.000 $2,850.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $325.000 $250.000 $0.000 $500.000 $1,500.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 16.000 $50.000 $45.000 $0.000 $75.000 $100.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $7,500.000 $2,500.000 $0.000 $10,000.000 $10,000.000
6185 6002 TMA (STATIONARY) DAY 39.000 $75.000 $300.000 $0.000 $150.000 $550.000
Totals: $130,055.00 $134,765.00 $0.00 $172,825.00 $204,350.00