PANOLA US 59 (0063-03-065)

Items: 122

County: PANOLA
Length: N/A
Highway: US 59
District: ATLANTA
Control Number: 0063-03-065
DBE Goal: N/A
Project: NH 2020(979)
Guaranty: N/A
Time: 503 WORKING DAYS
Engineer's Estimate: $8,869,830.74
Date: 07/09/2020 (5 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING 4 LANE HIGHWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$8,869,830.74
$8,864,785.93
Over/Under Est: -0.06% -$5,044.81
Over/Under Est: 1.35% $120,017.55
Amt Left: 1.41% $125,062.36
Over/Under Est: 23.23% $2,060,063.34
Amt Left: 23.3% $2,065,108.15
Delta: -21.58% -$1,940,045.79
$10,946,482.77
Over/Under Est: 23.41% $2,076,652.03
Amt Left: 23.48% $2,081,696.84
Delta: -0.15% -$16,588.69

Bid Items & Bid Tabulations

122 Total 0 of 122
PANOLA  |  US 59  |  ATLANTA  |  0063-03-065  |  07/09/2020  |  $8,869,830.74  |  NH 2020(979)  |  REHAB EXIST 4 LANE HWY  |  503 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
L. S. EQUIPMENT CO., INC.
A. L. HELMCAMP, INC.
PREPARING ROW
AC 1.240 $7,070.160 $8,000.000 $12,000.000 $10,000.000 $50,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 2.000 $1,600.000 $2,500.000 $1,000.000 $1,000.000 $2,000.000
REMOVING CONC (PAV)
SY 30,213.000 $5.000 $4.000 $4.850 $7.500 $8.000
REMOVING CONC (DRIVEWAYS)
SY 354.000 $16.050 $14.000 $8.000 $15.000 $30.000
REMOVING CONC (CURB AND GUTTER)
LF 1,596.000 $8.640 $8.000 $5.000 $10.000 $20.000
REMOVING CONC (CTB)
LF 165.000 $21.360 $15.000 $30.000 $20.000 $40.000
REMOVING CONC (FLUME)
SY 24.000 $15.000 $25.000 $8.000 $10.000 $90.000
REMOVING CONCRETE(MOW STRIP)
LF 1,485.000 $12.740 $10.000 $8.000 $15.000 $18.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 62,409.000 $4.320 $2.500 $2.000 $10.000 $3.500
BACKFILL (TY A)
STA 139.300 $263.540 $275.000 $225.000 $25.000 $500.000
BLADING
LF 1,530.000 $2.310 $4.000 $2.500 $100.000 $16.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,609.000 $5.000 $2.000 $2.500 $1.500 $6.000
BROADCAST SEED (TEMP) (WARM)
SY 36,499.000 $0.630 $0.110 $0.120 $0.100 $0.270
BROADCAST SEED (TEMP) (COOL)
SY 36,499.000 $0.610 $0.110 $0.090 $0.100 $0.270
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 72,997.000 $0.730 $0.780 $0.650 $0.300 $0.550
VEGETATIVE WATERING
MG 1,168.000 $10.000 $1.000 $10.000 $0.010 $22.000
CEMENT
TON 671.000 $159.450 $165.000 $165.000 $175.000 $180.000
CEMENT TREAT (SUBGRADE) (8")
SY 39,209.000 $3.000 $2.250 $3.000 $3.500 $4.500
PRIME COAT (MC-30)
GAL 9,807.000 $4.410 $4.400 $5.500 $4.000 $5.500
ASPH (TIER I)
GAL 19,580.000 $3.000 $4.000 $4.000 $3.000 $4.000
AGGR (TY-PB GR-4)
CY 509.000 $110.000 $180.000 $175.000 $150.000 $150.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 7,231.000 $135.000 $150.000 $140.000 $149.000 $160.000
TACK COAT
GAL 25,208.000 $3.500 $3.250 $2.500 $2.500 $3.700
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,967.000 $39.240 $62.000 $48.000 $60.000 $50.000
PLANE ASPH CONC PAV(0" TO 2")
SY 26,668.000 $1.380 $1.850 $1.250 $2.500 $1.700
PLANE ASPH CONC PAV (1/2")
SY 30,192.000 $1.110 $1.850 $1.000 $1.250 $1.500
CONC PVMT (JOINTED - CPCD) (13")
SY 32,771.000 $84.000 $70.000 $80.000 $98.000 $100.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 24.000 $125.000 $185.000 $185.000 $150.000 $550.000
CL A CONC (MISC)
CY 4.000 $459.640 $1,200.000 $800.000 $2,000.000 $2,600.000
CL A CONC (CURB OUTLET)(TY I)
EA 11.000 $2,466.670 $1,500.000 $1,500.000 $1,600.000 $1,900.000
RIPRAP (CONC)(4 IN)
CY 6.000 $329.030 $1,350.000 $700.000 $500.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 140.000 $444.940 $520.000 $450.000 $600.000 $680.000
ARMOR JOINT
LF 493.000 $113.310 $60.000 $50.000 $45.000 $65.000
RC PIPE (CL III)(24 IN)
LF 1,847.000 $65.980 $58.000 $60.000 $85.000 $70.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 16.000 $1,299.980 $800.000 $800.000 $1,000.000 $1,100.000
ADJUSTING INLETS
EA 3.000 $2,190.460 $3,600.000 $2,500.000 $1,000.000 $2,600.000
REMOV STR (SET)
EA 10.000 $571.540 $250.000 $250.000 $500.000 $500.000
REMOV STR (PIPE)
EA 44.000 $428.320 $300.000 $350.000 $1,000.000 $900.000
MOBILIZATION
LS 1.000 $780,000.000 $800,000.000 $800,000.000 $850,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $4,724.720 $8,500.000 $10,000.000 $6,000.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 375.000 $39.400 $44.000 $37.000 $50.000 $34.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 375.000 $48.000 $50.000 $64.000 $75.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 750.000 $10.280 $11.000 $14.000 $10.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,050.000 $2.890 $3.100 $2.650 $3.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,050.000 $0.930 $1.100 $1.050 $1.000 $2.000
CONSTRUCTING DETOURS
SY 2,890.000 $47.160 $70.000 $70.000 $85.000 $75.000
PERM CTB (SSCB)(TY 1)(MOD)
LF 20.000 $150.000 $140.000 $175.000 $250.000 $350.000
PERM CTB (SSCB)(TY 3)(MOD)
LF 165.000 $260.000 $95.000 $250.000 $200.000 $150.000
CONC CURB & GUTTER (TY II)
LF 4,220.000 $36.850 $28.000 $38.000 $35.000 $41.000
DRIVEWAYS (ACP)
SY 3,092.000 $41.260 $34.000 $40.000 $50.000 $45.000
DRIVEWAYS (CONC)(TYPE 1)
SY 507.000 $80.000 $75.000 $110.000 $95.000 $130.000
DRIVEWAYS (CONC)(TYPE 2)
SY 354.000 $85.000 $105.000 $110.000 $95.000 $140.000
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 1,351.000 $0.320 $4.000 $12.000 $15.000 $15.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,675.000 $18.790 $21.500 $22.000 $24.000 $17.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,794.290 $1,550.000 $1,435.000 $1,600.000 $1,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,250.000 $1,200.000 $1,250.000 $1,000.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,050.000 $2.670 $2.750 $2.500 $5.000 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $227.650 $275.000 $220.000 $150.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,591.910 $2,700.000 $2,675.000 $2,700.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $237.220 $275.000 $165.000 $300.000 $220.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,300.000 $990.000 $1,100.000 $1,000.000 $950.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 2.000 $23,000.000 $24,000.000 $23,500.000 $25,000.000 $18,000.000
PIPE UNDERDRAINS (TY 9) (6")
LF 1,059.000 $40.000 $46.000 $40.000 $100.000 $41.000
MAILBOX INSTALL-S (TWW-POST) TY 1
EA 8.000 $300.000 $325.000 $275.000 $350.000 $310.000
ALUMINUM SIGNS (TY G)
SF 299.500 $28.000 $35.000 $35.000 $35.000 $38.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $451.690 $585.000 $790.000 $750.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-EXAL)
EA 3.000 $840.000 $850.000 $1,135.000 $1,500.000 $810.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $749.770 $605.000 $850.000 $950.000 $580.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $760.000 $820.000 $1,240.000 $950.000 $780.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $707.840 $680.000 $730.000 $850.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 9.000 $818.920 $785.000 $1,010.000 $1,000.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $925.000 $1,650.000 $1,075.000 $1,000.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $885.490 $1,375.000 $1,135.000 $1,500.000 $1,300.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,600.000 $1,750.000 $1,755.000 $1,800.000 $1,700.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 30.000 $366.860 $325.000 $475.000 $500.000 $310.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 5.000 $505.000 $410.000 $515.000 $750.000 $400.000
REMOVE SM RD SN SUP&AM
EA 25.000 $70.000 $80.000 $100.000 $150.000 $80.000
INSTALL LRSS (STRUCT STEEL)
LB 1,290.000 $5.440 $6.600 $6.500 $20.000 $10.000
REMOVE LRSA
EA 2.000 $900.000 $1,300.000 $1,300.000 $3,500.000 $2,200.000
RELOCATE LRSS (SIGN ONLY)
EA 2.000 $1,350.000 $2,200.000 $2,150.000 $2,500.000 $2,600.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 20.000 $30.000 $30.000 $25.000 $50.000 $30.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,264.000 $0.330 $0.770 $0.750 $1.000 $0.740
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 36.000 $1.250 $4.400 $4.350 $4.000 $4.200
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 17,968.000 $0.680 $0.780 $0.750 $1.000 $0.740
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 43,339.000 $0.670 $0.770 $0.750 $0.900 $0.740
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,206.000 $11.000 $1.000 $1.000 $1.000 $0.950
PAVEMENT SEALER 6"
LF 58,372.000 $0.270 $0.200 $0.200 $0.250 $0.190
PAVEMENT SEALER 8"
LF 3,206.000 $0.270 $0.330 $0.320 $0.300 $0.320
PAVEMENT SEALER 12"
LF 1,316.000 $1.310 $1.900 $1.800 $1.750 $1.790
PAVEMENT SEALER 24"
LF 1,294.000 $3.230 $2.500 $2.400 $3.000 $2.360
PAVEMENT SEALER (ARROW)
EA 6.000 $49.180 $44.000 $43.000 $50.000 $42.000
PAVEMENT SEALER (WORD)
EA 4.000 $53.920 $66.000 $65.000 $75.000 $63.000
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 2,586.000 $5.380 $8.250 $8.100 $8.000 $7.880
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 576.000 $13.020 $7.400 $7.250 $7.000 $7.040
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,294.000 $14.910 $13.500 $13.250 $13.000 $12.920
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $301.470 $190.000 $190.000 $50.000 $183.750
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $500.000 $260.000 $255.000 $100.000 $246.750
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 23.000 $34.360 $60.000 $60.000 $75.000 $57.750
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 740.000 $10.000 $7.400 $7.250 $7.000 $7.040
REFL PAV MRKR TY I-C
EA 364.000 $3.400 $4.000 $3.900 $4.000 $3.780
REFL PAV MRKR TY II-A-A
EA 12.000 $2.930 $5.500 $5.400 $5.000 $5.250
ELIM EXT PAV MRK & MRKS (4")
LF 25,347.000 $0.360 $0.500 $0.490 $0.500 $0.470
PAV SURF PREP FOR MRK (6")
LF 58,372.000 $0.110 $0.660 $0.650 $0.750 $0.630
PAV SURF PREP FOR MRK (8")
LF 3,206.000 $0.220 $0.700 $0.700 $0.750 $0.680
PAV SURF PREP FOR MRK (12")
LF 1,316.000 $0.430 $1.650 $1.650 $2.000 $1.580
PAV SURF PREP FOR MRK (24")
LF 1,294.000 $1.080 $3.300 $3.250 $3.000 $3.150
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $32.000 $60.000 $60.000 $75.000 $57.750
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $54.000 $90.000 $92.000 $100.000 $89.250
SP MIXES SP-C SAC-A PG76-22
TON 2,702.000 $103.300 $125.000 $113.000 $130.000 $120.000
SP MIXES SP-D PG64-22
TON 7,572.000 $100.000 $120.000 $106.000 $125.000 $110.000
SP MIXES SP-D SAC-B PG76-22
TON 1,600.000 $95.700 $128.000 $112.000 $127.000 $120.000
TACK COAT
GAL 9,973.000 $3.250 $3.250 $2.500 $2.500 $3.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $7,373.240 $12,000.000 $16,000.000 $18,000.000 $15,000.000
PREFB PV MK W/WNTY TY B (W)(6")(SLD)
LF 7,216.000 $7.500 $5.750 $5.600 $6.000 $5.500
PREFB PV MK W/WNTY TY B(Y)6"(SLD)CNTST
LF 5,584.000 $7.500 $8.250 $8.100 $8.000 $8.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 22,148.000 $3.120 $3.850 $3.750 $4.000 $3.700
PREFORMED CENTERLINE RUMBLE STRIP
LF 22,148.000 $3.120 $3.850 $3.750 $4.000 $3.700
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 19,409.000 $0.470 $0.640 $0.650 $0.600 $0.610
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 4,860.000 $0.550 $0.820 $0.800 $0.750 $0.790
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 18,717.000 $0.490 $0.640 $0.650 $0.600 $0.610
TMA (STATIONARY)
DAY 160.000 $158.570 $125.000 $125.000 $300.000 $300.000
TMA (MOBILE OPERATION)
DAY 4.000 $478.060 $125.000 $200.000 $60.000 $500.000
Totals: $8,869,830.740 $8,864,785.930 $8,989,848.290 $10,929,894.080 $10,946,482.770