PALO PINTO IH0020 (6492-28-001)

Items: 38

County: PALO PINTO
Length: 0.0100 MILES
Highway: IH0020
District: FORT WORTH
Control Number: 6492-28-001
DBE Goal: 0.0%
Project: BPM - A00218045
Guaranty: $41,000.00
Time: 103 WORKING DAYS
Engineer's Estimate: $2,032,014.95
Date: 07/01/2026 1:00 PM CDT (17 days ago) Changed
Contract Number: 7264003
Type: BRIDGE PREVENTATIVE MAINTENANCE
Project ID: A00218045
Project Description: 6492-28-001 IS BPM FOR THE FY 2027 IN THE FORT WORTH DISTRICT.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MARIBEL RANGEL
ELIJAH S ZELENOV
MUHAMMAD RIAZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,032,014.95
Over/Under Est: -3.47% -$70,574.95
$2,784,751.50
Over/Under Est: 37.04% $752,736.55
Amt Left: 41.97% $823,311.50
Over/Under Est: 43.65% $886,919.80
Amt Left: 48.82% $957,494.75
Delta: -4.82% -$134,183.25

Bid Items & Bid Tabulations

38 Total 0 of 38
PALO PINTO  |  IH0020  |  FORT WORTH  |  6492-28-001  |  07/01/2026 1:00 PM CDT  |  $2,032,014.95  |  BPM - A00218045  |  BRIDGE PREVENT MAINT  |  103 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
REAR CONTRACTORS LLC
GIBSON & ASSOCIATES, INC.
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 16.000 $396.960 $750.000 $400.000 $1,540.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 4.000 $826.870 $1,750.000 $600.000 $2,530.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 1,385.000 $15.000 $9.000 $30.000 $12.490
EXCAV (SPECIAL)
CY 30.000 $22.000 $125.000 $200.000 $137.500
EMBANK (VEH)(OC)(TY B)
CY 195.000 $32.340 $95.000 $110.000 $165.000
EMBANK (VEH)(DC)(TY B)
CY 50.000 $32.340 $95.000 $200.000 $192.500
FULL - DEPTH REPAIR CRCP (10")
CY 4.000 $2,000.000 $3,500.000 $1,500.000 $3,000.000
FLOWABLE BACKFILL
CY 22.000 $277.700 $510.000 $1,000.000 $825.000
FLOWABLE FILL (EMBANKMENT)
CY 0.250 $315.790 $4,300.000 $430.000 $2,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $99.570 $275.000 $300.000 $310.000
RIPRAP (CONC)(FLUME)
CY 6.000 $510.000 $815.000 $1,200.000 $1,378.300
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 276.000 $215.860 $170.000 $300.000 $313.500
RIPRAP (STONE COMMON)(GROUT)(24 IN)
CY 132.000 $250.000 $250.000 $320.000 $423.500
RIPRAP (STONE PROTECTION)(24 IN)
CY 865.000 $178.740 $175.000 $300.000 $313.500
RIPRAP (STONE PROTECTION)(36 IN)
CY 444.000 $177.680 $200.000 $450.000 $264.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 968.000 $50.000 $18.000 $60.000 $27.500
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 3,082.000 $55.000 $23.000 $55.000 $27.500
CLEANING EXISTING JOINTS
LF 1,523.000 $30.000 $10.000 $40.000 $27.500
RESIZING AND SEALING JOINTS
LF 1,906.000 $75.000 $65.000 $100.000 $100.000
CLEAN AND SEAL JNTS (PAN GIRDERS) (CL3)
LF 136.000 $45.850 $70.000 $65.000 $110.000
LATEX - MODIFIED CONC OVERLAY (2 IN)
SY 3,068.000 $120.000 $142.500 $150.000 $180.000
HEADER TYPE EXPANSION JOINT
CF 175.000 $370.000 $300.000 $500.000 $478.500
MILLING CONCRETE SLAB (1 IN)
SY 3,068.000 $15.000 $10.000 $20.000 $35.200
HYDRO-DEMOLITION (1 IN)
SY 3,068.000 $90.000 $105.000 $135.000 $122.000
MOBILIZATION
LS 1.000 $190,365.390 $190,000.000 $200,000.000 $285,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,000.000 $15,000.000 $5,000.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,500.000 $3,500.000 $1.000 $12,000.000
TMA (STATIONARY)
DAY 103.000 $250.000 $350.000 $1.000 $350.000
TMA (MOBILE OPERATION)
DAY 15.000 $160.710 $580.000 $1.000 $350.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 280.000 $49.000 $55.000 $50.000 $50.600
ROCK FILTER DAMS (REMOVE)
LF 280.000 $13.000 $15.000 $20.000 $24.200
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 800.000 $4.000 $7.500 $10.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 800.000 $1.000 $1.500 $3.000 $1.650
CONC CURB (TY II)
LF 48.000 $29.280 $40.000 $60.000 $150.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 938.000 $2.000 $5.000 $2.000 $7.700
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 118.000 $2.000 $7.500 $2.000 $7.700
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 143.000 $500.000 $255.000 $1,000.000 $610.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 128.000 $492.000 $275.000 $1,000.000 $700.000
Totals: $2,032,014.948 $1,961,440.000 $2,784,751.500 $2,918,934.750