Job Info for 6460-15-001

County: PALO PINTO Highway: IH0020 Date: 05/03/2024 (6 months ago) Changed Engineer's Estimate: $1,486,553 Control Number: 6460-15-001
Project: RMC - 646015001 District: FORT WORTH Time: 365 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,486,553.27
SHORT-LINE CORPORATION   $1,145,494.00 1
-22.94% | -$341,059.27
ROSS SA ENTERPRISE LLC   $1,171,886.00 2
-21.17% | -$314,667.27
2.3% | $26,392.00
T&L CLEANING SERVICES LLC   $1,181,870.00 3
-20.5% | -$304,683.27
3.18% | $36,376.00
0.85% | $9,984.00
MARCOM'S MOWING SERVICE, LLC   $1,725,700.00 4
16.09% | $239,146.73
50.65% | $580,206.00
46.01% | $543,830.00
HAZMAT INTERNATIONAL, INC.   $1,732,400.00 5
16.54% | $245,846.73
51.24% | $586,906.00
0.39% | $6,700.00
Subcontractor Percentage Amount
JUNIOR CONSTRUCTION COMPANY, INC. 0.00% $0.00
Total: 0.00% $0.00

Bid Items

Items: 33, 0 filtered
PALO PINTO IH0020  |  FORT WORTH  |  6460-15-001  |  05/03/2024  |  $1,486,553  |  RMC - 646015001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate SHORT-LINE CORPORATION ROSS SA ENTERPRISE LLC T&L CLEANING SERVICES LLC MARCOM'S MOWING SERVICE, LLC HAZMAT INTERNATIONAL, INC.
500 6033 MOBILIZATION (CALLOUT) EA 24.000 $1,607.830 $1.000 $1.000 $1.000 $250.000 $200.000
500 6034 MOBILIZATION (EMERGENCY) EA 10.000 $628.240 $1.000 $100.000 $1.000 $1,500.000 $200.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 3,500.000 $29.790 $20.000 $19.000 $24.000 $32.500 $20.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 10.000 $2,363.690 $1,500.000 $1,350.000 $1,500.000 $2,000.000 $1,600.000
540 6014 SHORT RADIUS LF 2.000 $158.100 $1,000.000 $326.000 $1.000 $500.000 $26,000.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 25.000 $1,385.190 $1.000 $1,000.000 $1,000.000 $1,480.000 $1,000.000
540 6042 TL-3 31" SHORT RADIUS (END ANCHOR) EA 2.000 $18,127.000 $1,000.000 $500.000 $1.000 $5,000.000 $10,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 3,500.000 $3.300 $15.000 $1.000 $1.000 $5.000 $2.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,400.000 $5,000.000 $4,000.000 $2,000.000 $4,000.000 $2,800.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 10,000.000 $20.000 $15.000 $20.000 $15.000 $25.000 $13.000
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 500.000 $66.720 $25.000 $1.000 $20.000 $60.000 $30.000
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF 2.000 $100.000 $100.000 $1,245.000 $1.000 $200.000 $200.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 400.000 $12.280 $100.000 $50.000 $20.000 $70.000 $40.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 100.000 $14.530 $1.000 $50.000 $20.000 $70.000 $50.000
770 6017 REALIGN POSTS EA 150.000 $18.390 $100.000 $25.000 $1.000 $45.000 $10.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 500.000 $36.360 $1.000 $9.000 $1.000 $20.000 $30.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 500.000 $19.550 $1.000 $20.000 $15.000 $40.000 $35.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 50.000 $97.420 $1.000 $100.000 $30.000 $100.000 $45.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 50.000 $3,691.490 $3,000.000 $4,000.000 $3,500.000 $3,600.000 $3,000.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 20.000 $894.740 $1,000.000 $500.000 $750.000 $1,200.000 $1,200.000
770 6029 REM & RESET SGT IMPACT HEAD EA 20.000 $46.000 $100.000 $1.000 $1.000 $150.000 $500.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 20.000 $39.500 $1.000 $20.000 $1.000 $100.000 $150.000
770 6031 REPLACE SGT CABLE ANCHOR EA 20.000 $38.130 $1.000 $20.000 $1.000 $100.000 $150.000
770 6032 REPLACE SGT STRUT EA 20.000 $34.000 $1.000 $20.000 $1.000 $100.000 $100.000
770 6060 REMOVE AND REPLACE DAT EA 10.000 $1,666.670 $1,000.000 $1,350.000 $1,000.000 $1,280.000 $1,000.000
771 6002 REPLACE POSTS (TL-4) EA 2,500.000 $200.000 $200.000 $100.000 $200.000 $300.000 $325.000
771 6004 CABLE SPLICE / TURNBUCKLE (TL-4) EA 25.000 $369.230 $1.000 $100.000 $1.000 $200.000 $400.000
771 6008 REPR OR REPLC CABLE BARR TERM SEC(TL-4) EA 25.000 $714.290 $1,500.000 $1,500.000 $1,500.000 $1,500.000 $2,500.000
771 6010 REPLACE CABLE (TL-4) LF 3,000.000 $1.450 $1.000 $5.000 $0.500 $3.000 $3.000
771 6011 CHECK / RE-TENSION CABLE EA 50.000 $379.900 $500.000 $200.000 $1.000 $150.000 $500.000
771 6012 REPLACE POST HARDWARE (TL-4) EA 2,500.000 $56.640 $1.000 $1.000 $1.000 $32.000 $30.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 25.000 $104.000 $100.000 $50.000 $1.000 $200.000 $30.000
6185 6002 TMA (STATIONARY) DAY 125.000 $200.000 $100.000 $2,000.000 $1,000.000 $100.000 $1,000.000
Totals: $1,486,553.27 $1,145,494.00 $1,171,886.00 $1,181,870.00 $1,725,700.00 $1,732,400.00