Job Info for 6454-21-001

County: ORANGE Highway: SH0012 Date: 04/04/2024 (7 months ago) Engineer's Estimate: $1,884,349 Control Number: 6454-21-001
Project: RMC - 645421001 District: BEAUMONT Time: 44 W Type: ASPHALT
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,884,348.60
TEXAS MATERIALS GROUP, INC.   $2,156,544.92 1
14.45% | $272,196.32

Bid Items

Items: 30, 0 filtered
ORANGE SH0012  |  BEAUMONT  |  6454-21-001  |  04/04/2024  |  $1,884,349  |  RMC - 645421001  |  ASPH  |  44 W
Item code Description Unit Quantity Engineer's Estimate TEXAS MATERIALS GROUP, INC.
134 6002 BACKFILL (TY B) STA 91.000 $275.000 $550.000
164 6005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY 12,126.000 $0.250 $0.200
168 6001 VEGETATIVE WATERING MG 203.000 $80.000 $12.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 67.000 $200.000 $550.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 2,688.000 $10.000 $15.000
354 6043 PLANE ASPH CONC PAV (1") SY 6,370.000 $7.500 $4.500
500 6001 MOBILIZATION LS 1.000 $200,000.000 $120,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $5,000.000 $4,500.000
530 6002 INTERSECTIONS (ACP) SY 1,326.000 $62.500 $135.000
530 6005 DRIVEWAYS (ACP) SY 1,318.000 $50.000 $97.990
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 14,322.000 $0.150 $0.750
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 10.000 $1.500 $450.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 153.000 $3.100 $5.500
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 1,510.000 $1.000 $5.000
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 1,044.000 $2.000 $1.800
666 6305 RE PM W/RET REQ TY I (W)6"(BRK)(090MIL) LF 300.000 $1.250 $0.900
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 17,848.000 $0.750 $0.850
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 3,070.000 $0.750 $0.900
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 19,044.000 $0.750 $0.850
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 86.000 $14.000 $21.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 9.000 $325.000 $305.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 1.000 $400.000 $370.000
672 6007 REFL PAV MRKR TY I-C EA 45.000 $8.000 $6.500
672 6009 REFL PAV MRKR TY II-A-A EA 486.000 $8.000 $6.500
3076 6035 D-GR HMA TY-D PG64-22 TON 351.000 $225.000 $250.000
3076 6066 TACK COAT GAL 383.000 $8.000 $18.000
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 6,079.000 $200.000 $222.000
3077 6075 TACK COAT GAL 3,228.000 $8.000 $10.000
6185 6002 TMA (STATIONARY) DAY 24.000 $550.000 $350.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $550.000 $275.000
Totals: $1,884,348.60 $2,156,544.92