Job Info for 2701-02-025

County: ORANGE Highway: FM 3247 Date: 12/02/2022 (1 year ago) Engineer's Estimate: $1,103,499 Control Number: 2701-02-025
Project: F 2023(285) District: BEAUMONT Time: 26 WORKING DAYS Type: SURFACING/ROADWAY RESTORATION
HCS
Pay Estimate
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,103,499.00
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.   $1,011,890.95 1
-8.3% | -$91,608.05
TEXAS MATERIALS GROUP, INC.   $1,191,053.80 2
7.93% | $87,554.80
17.71% | $179,162.85

Bid Items

Items: 37, 0 filtered
ORANGE FM 3247  |  BEAUMONT  |  2701-02-025  |  12/02/2022  |  $1,103,499  |  F 2023(285)  |  SURF/ROADWAY RESTOR  |  26 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. TEXAS MATERIALS GROUP, INC.
134 6004 BACKFILL (TY A OR B) STA 67.910 $325.000 $383.000 $1,000.000
164 6025 CELL FBR MLCH SEED(PERM)(URBAN)(SANDY) SY 3,049.000 $0.700 $2.000 $7.000
168 6001 VEGETATIVE WATERING MG 25.660 $50.000 $20.000 $160.000
351 6004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 1,603.000 $155.000 $92.450 $120.000
354 6130 PLANE ASPH CONC PAV (0"-1.75") SY 2,458.000 $4.000 $6.500 $5.000
500 6001 MOBILIZATION LS 1.000 $165,358.000 $70,000.000 $118,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $3,500.000 $5,000.000 $5,500.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 120.000 $6.040 $25.000 $14.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 120.000 $1.240 $5.000 $11.000
530 6011 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 337.000 $60.000 $120.500 $100.000
530 6016 DRIVEWAYS (BASE) SY 19.000 $52.000 $160.000 $290.000
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 6,041.000 $0.200 $5.000 $2.400
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 49.000 $1.050 $1.000 $20.500
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 688.000 $1.300 $1.000 $3.450
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 398.000 $1.020 $1.800 $1.200
666 6224 PAVEMENT SEALER 4" LF 68.000 $0.650 $0.240 $0.550
666 6225 PAVEMENT SEALER 6" LF 50.000 $0.650 $0.300 $0.750
666 6226 PAVEMENT SEALER 8" LF 100.000 $0.650 $0.500 $1.050
666 6230 PAVEMENT SEALER 24" LF 42.000 $1.800 $1.500 $2.100
666 6231 PAVEMENT SEALER (ARROW) EA 2.000 $32.000 $10.000 $21.000
666 6285 REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) LF 13,501.000 $1.300 $1.450 $1.750
666 6299 RE PM W/RET REQ TY I (W)4"(BRK)(090MIL) LF 30.000 $0.600 $2.000 $0.850
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 1,150.000 $0.500 $0.750 $0.850
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 6,895.000 $0.500 $0.700 $0.850
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 54.000 $16.000 $22.150 $26.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 4.000 $245.000 $279.180 $450.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 $270.000 $312.220 $590.000
672 6007 REFL PAV MRKR TY I-C EA 22.000 $6.270 $6.000 $8.700
672 6009 REFL PAV MRKR TY II-A-A EA 688.000 $6.000 $6.000 $6.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 68.000 $1.700 $1.000 $2.100
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 100.000 $1.250 $1.100 $4.200
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 42.000 $4.350 $2.250 $11.000
677 6008 ELIM EXT PAV MRK & MRKS (ARROW) EA 2.000 $72.000 $45.000 $82.000
3077 6065 SP MIXES SP-D SAC-A PG76-22 TON 3,272.000 $175.000 $185.000 $190.000
3077 6075 TACK COAT GAL 2,039.000 $6.000 $5.000 $9.700
6185 6002 TMA (STATIONARY) DAY 26.000 $250.000 $250.000 $650.000
6185 6005 TMA (MOBILE OPERATION) DAY 5.000 $350.000 $100.000 $650.000
Totals: $1,103,499.00 $1,011,890.95 $1,191,053.80