ORANGE FM 1442 (2562-01-023)

Items: 126

County: ORANGE
Length: N/A
Highway: FM 1442
District: BEAUMONT
Control Number: 2562-01-023
DBE Goal: N/A
Project: STP 2021(466)HES
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $5,792,459.99
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT NEW ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$5,792,459.99
$7,694,479.73
Over/Under Est: 32.84% $1,902,019.74
$8,817,711.44
Over/Under Est: 52.23% $3,025,251.45
Amt Left: 14.6% $1,123,231.71
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 19.87% $1,664,728.25
AMERICAN REMEDIATION OPTIONS, INC. 3.40% $284,855.36
BARRICADES UNLIMITED 1.91% $160,021.69
TRP CONSTRUCTION GROUP, LLC 1.65% $138,238.63
SK CONCRETE SERVICES LLC 0.32% $26,809.92
TEXAS MAINTENANCE AND CONSTRUCTION LLC 0.32% $26,809.92
BAY CITY TRAFFIC 0.32% $26,809.92
PROFESSIONAL TRAFFIC CONTROL LLC 0.11% $9,215.91
PINNACLE GRINDING AND GROOVING LLC 0.08% $6,702.48
Total: 27.98% $2,344,192.08

Bid Items & Bid Tabulations

126 Total 0 of 126
ORANGE  |  FM 1442  |  BEAUMONT  |  2562-01-023  |  08/05/2021  |  $5,792,459.99  |  STP 2021(466)HES  |  CONSTRUCT NEW ROAD  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
MK CONSTRUCTORS
PREPARING ROW
STA 5.000 $5,200.000 $2,756.000 $10,000.000
REMOVING CONC (RIPRAP)
SY 300.000 $7.000 $31.000 $44.000
REMOVING CONC (DRIVEWAYS)
SY 2,236.000 $25.000 $20.000 $18.000
REMOVING CONC (CURB AND GUTTER)
LF 115.000 $4.000 $6.150 $9.000
REMOVING CONCRETE(MOW STRIP)
LF 655.000 $6.000 $8.500 $6.000
EXCAVATION (CHANNEL)
CY 12,964.000 $7.000 $11.500 $9.000
SUBGRADE WIDENING (DENS CONT)
STA 252.000 $550.000 $1,550.000 $1,950.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 28,204.000 $7.000 $9.450 $22.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 29.720 $2,525.000 $1,410.000 $1,500.000
VEGETATIVE WATERING
MG 1,613.700 $15.000 $18.000 $9.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 11,063.000 $50.000 $96.000 $72.000
LIME TRT (EXST MATL) (6")
SY 5,333.000 $2.000 $4.650 $3.000
LIME (HYD, COM, OR QK(SLURRY))
TON 79.000 $170.000 $230.000 $200.000
CEMENT
TON 459.000 $175.000 $220.000 $230.000
CEMENT TREAT (EXIST MATL) (6")
SY 46,371.000 $2.500 $2.650 $2.000
PRIME COAT (AE-P)
GAL 9,603.000 $6.000 $4.200 $6.600
ASPH (AC-10-2TR)
GAL 37,243.000 $9.070 $2.850 $9.000
AGGR(TY-PB GR-4 SAC-A)
CY 796.000 $90.000 $165.000 $237.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 161.000 $1.750 $17.000 $14.000
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 555.000 $3.000 $16.000 $24.000
CEM STABIL BKFL
CY 373.000 $60.000 $128.000 $160.000
CUT & RESTORE ASPH PAVING
SY 159.000 $100.000 $154.000 $220.000
TRENCH EXCAVATION PROTECTION
LF 155.000 $3.000 $20.600 $28.000
CL C CONC (COLLAR)
EA 4.000 $800.000 $1,010.000 $1,650.000
RIPRAP (CONC)(6 IN)
CY 28.000 $480.000 $610.000 $715.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 145.000 $125.000 $230.000 $275.000
RIPRAP (MOW STRIP)(4 IN)
CY 108.000 $400.000 $630.000 $770.000
CONC BOX CULV (5 FT X 5 FT)
LF 74.000 $500.000 $860.000 $1,045.000
CONC BOX CULV (6 FT X 5 FT)
LF 105.000 $470.000 $960.000 $1,320.000
CONC BOX CULV (7 FT X 6 FT)
LF 26.000 $505.000 $770.000 $935.000
CONC BOX CULV (8 FT X 5 FT)
LF 6.000 $450.000 $910.000 $1,100.000
CONC BOX CULV (9 FT X 5 FT)
LF 48.000 $850.000 $950.000 $1,210.000
RC PIPE (CL III)(15 IN)
LF 76.000 $90.000 $49.000 $55.000
RC PIPE (CL III)(18 IN)
LF 108.000 $70.000 $55.000 $62.000
RC PIPE (CL III)(24 IN)
LF 305.000 $90.000 $124.000 $138.000
RC PIPE (CL III)(30 IN)
LF 86.000 $95.000 $167.000 $185.000
RC PIPE (CL III)(36 IN)
LF 147.000 $120.000 $202.000 $250.000
RC PIPE (CL III)(42 IN)
LF 16.000 $140.000 $302.000 $375.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $4,500.000 $4,510.000 $6,000.000
INLET (COMPL)(FG)(3FT X 3FT)(FTW)
EA 1.000 $5,600.000 $4,010.000 $5,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 4.000 $14,500.000 $20,100.000 $27,500.000
WINGWALL (PW - 2) (HW=8 FT)
EA 4.000 $19,000.000 $30,100.000 $38,500.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 14.000 $710.000 $860.000 $1,000.000
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
EA 2.000 $900.000 $960.000 $1,100.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $950.000 $860.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $770.000 $960.000 $1,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,600.000 $1,210.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 37.000 $1,200.000 $1,210.000 $1,200.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 6.000 $1,100.000 $2,010.000 $2,400.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $1,350.000 $2,210.000 $2,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $2,610.000 $3,100.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000 $2,300.000 $3,210.000 $3,900.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 4.000 $3,000.000 $3,510.000 $4,200.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 6.000 $4,000.000 $4,100.000 $5,000.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 2.000 $3,600.000 $4,510.000 $5,300.000
SET (REMOV & REINSTALL)
EA 20.000 $200.000 $860.000 $1,600.000
REMOV & RE - LAY PIPE (18 IN)
LF 80.000 $33.000 $50.000 $60.000
REMOV & RE - LAY PIPE (36 IN)
LF 63.000 $72.000 $88.000 $110.000
ADJUSTING MANHOLES (SANITARY)
EA 5.000 $915.000 $1,510.000 $2,750.000
REMOV STR (SET)
EA 20.000 $330.000 $760.000 $1,375.000
REMOV STR (WINGWALL)
EA 2.000 $1,170.000 $1,210.000 $2,200.000
REMOV STR (HEADWALL)
EA 11.000 $350.000 $1,210.000 $2,200.000
REMOV STR (BOX CULVERT)
LF 39.000 $44.000 $260.000 $330.000
REMOV STR (PIPE)
EA 4.000 $450.000 $1,510.000 $2,000.000
MOBILIZATION
LS 1.000 $350,000.000 $509,000.000 $850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $2,300.000 $8,900.000
ROCK FILTER DAMS (REMOVE)
LF 1,060.000 $9.200 $12.100 $13.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,860.000 $6.000 $5.600 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,860.000 $1.100 $1.020 $1.000
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 1,060.000 $31.000 $64.750 $70.000
DRIVEWAYS (CONC)
SY 2,443.000 $70.000 $126.000 $83.000
DRIVEWAYS (ACP)
SY 4,496.000 $35.000 $37.000 $34.000
DRIVEWAYS (BASE)
SY 1,916.000 $20.000 $34.000 $34.000
RUMBLE STRIPS (SHOULDER)
LF 44,946.000 $0.250 $0.080 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 1,680.000 $22.000 $24.650 $27.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 9.000 $1,200.000 $1,210.000 $1,320.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 54.000 $55.000 $68.000 $72.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 3.000 $700.000 $28.000 $28.000
REMOVE METAL BEAM GUARD FENCE
LF 655.000 $2.500 $2.550 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,650.000 $2,560.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $320.000 $255.000 $275.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $15,000.000 $25,550.000 $28,000.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 6.000 $200.000 $248.000 $270.000
RELOCATE EXISTING MAILBOX
EA 38.000 $100.000 $495.000 $540.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $500.000 $560.000 $600.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 43.000 $400.000 $398.000 $435.000
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $76.000 $83.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 41.000 $26.000 $28.000 $31.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $50.000 $28.000 $83.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 44,946.000 $0.300 $0.320 $0.440
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 149.000 $2.500 $10.300 $11.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 97,994.000 $0.250 $0.320 $0.400
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,130.000 $4.000 $3.600 $3.850
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,457.000 $1.000 $1.750 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,719.000 $1.000 $1.030 $1.100
PAVEMENT SEALER 4"
LF 42.000 $0.150 $0.260 $1.100
PAVEMENT SEALER 8"
LF 30.000 $0.350 $0.520 $1.100
PAVEMENT SEALER 24"
LF 106.000 $1.000 $1.030 $2.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 60.000 $0.400 $1.030 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 49,146.000 $0.400 $0.400 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,360.000 $0.300 $0.440 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 48,983.000 $0.400 $0.400 $0.500
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 86.000 $30.000 $14.420 $19.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 583.000 $27.000 $20.600 $39.000
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
EA 10.000 $55.000 $51.500 $55.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 20.000 $200.000 $206.000 $248.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $250.000 $278.100 $330.000
REFL PAV MRKR TY I-C
EA 87.000 $3.500 $4.120 $5.000
REFL PAV MRKR TY II-A-A
EA 1,382.000 $3.100 $3.090 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 18,885.000 $0.350 $0.460 $0.700
ELIM EXT PAV MRK & MRKS (8")
LF 1,141.000 $0.600 $0.820 $1.500
ELIM EXT PAV MRK & MRKS (24")
LF 39.000 $2.500 $5.150 $5.500
ELIM EXT PAV MRK & MRKS (ARROW)
EA 5.000 $50.000 $51.500 $55.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 5.000 $50.000 $77.250 $83.000
PAV SURF PREP FOR MRK (4")
LF 42.000 $0.040 $1.030 $1.100
PAV SURF PREP FOR MRK (8")
LF 30.000 $0.110 $1.030 $1.100
PAV SURF PREP FOR MRK (24")
LF 106.000 $1.000 $2.060 $2.200
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 18,215.000 $0.500 $4.040 $2.500
DITCH CLEANING AND RESHAPING (FOOT)
LF 1,000.000 $7.000 $12.360 $11.000
D-GR HMA TY-D PG64-22
TON 17,031.000 $75.000 $92.000 $93.500
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 4,091.000 $80.000 $95.000 $93.500
TACK COAT
GAL 16,180.000 $3.000 $3.500 $5.500
SP MIXES SP-D SAC-A PG76-22
TON 5,134.000 $95.000 $100.000 $97.000
TACK COAT
GAL 3,748.000 $2.000 $4.250 $5.500
TMA (STATIONARY)
DAY 137.000 $175.000 $320.000 $353.000
TMA (MOBILE OPERATION)
DAY 56.000 $100.000 $103.000 $220.000
Totals: $5,792,459.990 $7,694,479.730 $8,817,711.440