Show Job Controls
Bid Cobra

ORANGE CR (0920-30-077)

Items: 114

County: ORANGE
Length: N/A
Highway: CR
District: BEAUMONT
Control Number: 0920-30-077
DBE Goal: N/A
Project: BR 2014(325)
Guaranty: N/A
Time: 300 WORKING DAYS
Engineer's Estimate: $8,566,747.29
Date: 02/03/2017 (9 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$8,566,747.29
$11,399,710.80
Over/Under Est: 33.07% $2,832,963.51
Over/Under Est: 34.96% $2,994,593.41
Amt Left: 1.42% $161,629.90
Over/Under Est: 35% $2,998,593.57
Amt Left: 1.45% $165,630.06
Delta: -0.03% -$4,000.16
Over/Under Est: 65.4% $5,602,529.01
Amt Left: 24.3% $2,769,565.50
Delta: -22.51% -$2,603,935.44

Bid Items & Bid Tabulations

114 Total 0 of 114
ORANGE  |  CR  |  BEAUMONT  |  0920-30-077  |  02/03/2017  |  $8,566,747.29  |  BR 2014(325)  |  REPLACE BRIDGE AND APPROACHES  |  300 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
JAY-REESE CONTRACTORS, INC.
MCCARTHY BUILDING COMPANIES, INC.
GIBSON & ASSOCIATES, INC.
PREPARING ROW
STA 5.740 $500.000 $50,000.000 $75,000.000 $107,760.000 $2,000.000
EXCAVATION (ROADWAY)
CY 49.000 $30.000 $230.000 $50.000 $33.990 $242.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 17.000 $30.000 $230.000 $100.000 $65.510 $275.000
BLADING
HR 6.000 $75.000 $140.000 $120.000 $139.350 $440.000
COMPOST MANUF TOPSOIL (4")
SY 421.000 $2.000 $5.500 $5.250 $4.750 $7.380
BLOCK SODDING
SY 742.000 $2.910 $6.000 $4.500 $4.000 $10.220
DRILL SEEDING (PERM)(WARM OR COOL)
SY 421.000 $0.250 $1.000 $2.150 $2.000 $3.660
VEGETATIVE WATERING
MG 1.700 $4.000 $750.000 $150.000 $565.580 $546.700
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 778.000 $25.000 $32.000 $48.000 $38.830 $60.500
SALV, HAUL & STKPL RCL APH PV (0-12")
SY 247.000 $15.000 $32.000 $35.000 $23.000 $44.000
PRIME COAT & BLOTTER (AE-P)
GAL 149.000 $4.500 $6.500 $22.000 $22.300 $22.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 6.000 $137.300 $240.000 $850.000 $1,580.000 $770.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 269.000 $3.900 $6.500 $22.000 $9.800 $22.000
D-GR HMA(SQ) TY-C SAC-A PG70-22
TON 83.000 $130.000 $200.000 $450.000 $248.050 $440.000
CEM STABIL BKFL
CY 25.100 $98.460 $140.000 $300.000 $110.150 $500.000
PRESTR CONC PIL (16 IN SQ)
LF 1,560.000 $113.480 $90.000 $88.000 $103.620 $90.200
PRESTR CONC PIL (18 IN SQ)
LF 3,545.000 $96.000 $100.000 $88.000 $125.130 $168.300
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $500.000 $250.000 $280.000 $263.160 $275.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 20.000 $500.000 $550.000 $600.000 $578.950 $605.000
CL C CONC (ABUT)(HPC)
CY 56.300 $828.770 $1,200.000 $1,900.000 $1,089.040 $1,907.400
CL C CONC (CAP)(HPC)
CY 39.600 $1,000.000 $3,200.000 $2,600.000 $2,069.970 $5,255.800
CL C CONC (CAP)(HPC)(MASS)
CY 192.700 $1,300.000 $1,600.000 $1,700.000 $1,514.990 $2,674.100
CL C CONC (FOOTING)(HPC)
CY 17.800 $1,300.000 $750.000 $1,400.000 $896.280 $4,056.800
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 6,740.000 $15.100 $25.000 $30.000 $22.760 $31.130
APPROACH SLAB (HPC)
CY 41.100 $479.420 $450.000 $1,100.000 $728.660 $994.400
PRESTR CONC SLAB BEAM (4SB12)
LF 707.110 $164.130 $200.000 $230.000 $160.930 $181.500
PRESTR CONC SLAB BEAM (5SB12)
LF 732.580 $154.310 $200.000 $230.000 $162.370 $172.700
RIPRAP (STONE PROTECTION)(18 IN)
CY 72.000 $199.370 $150.000 $145.000 $180.290 $75.000
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $500.000 $450.000 $650.000 $673.360 $535.000
RAIL (TY T223)(HPC)
LF 527.000 $88.610 $100.000 $195.000 $157.570 $203.500
RAIL (TY PR1)
LF 174.000 $93.070 $83.000 $120.000 $87.000 $184.800
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $77,000.000 $600,000.000 $45,000.000 $300,000.000 $149,600.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $240,000.000 $850,000.000 $85,000.000 $650,000.000 $258,500.000
REMOV STR (APPROACH SLAB)
EA 2.000 $7,200.000 $3,500.000 $1,900.000 $1,648.860 $10,000.000
REMOV STR (BENT)
EA 1.000 $12,000.000 $70,000.000 $57,000.000 $325,000.000 $374,000.000
REMOV STR (DOLPHIN AND FENDER SYS)
EA 2.000 $40,000.000 $350,000.000 $85,000.000 $93,599.250 $201,300.000
REMOV STR (BUILDING)
EA 1.000 $25,000.000 $50,000.000 $10,000.000 $7,500.000 $16,500.000
REMOV STR (TIMBER PILING)
EA 36.000 $150.000 $1,800.000 $170.000 $1,328.550 $616.000
REMOVE STR (BARRIER GATE)
EA 4.000 $1,000.000 $1,250.000 $1,500.000 $1,196.210 $3,500.000
SALV MATRL (CREDIT ITEM)
LS 1.000 $25,000.000 $15,000.000 $2,800.000 $1.000 $1.000
MOBILIZATION
LS 1.000 $776,489.000 $1,100,000.000 $1,150,000.000 $1,146,564.000 $1,225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $5,500.000 $9,500.000 $4,592.960 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 45.000 $22.000 $30.000 $33.000 $42.770 $56.190
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 30.000 $37.000 $18.000 $56.000 $74.120 $56.430
ROCK FILTER DAMS (REMOVE)
LF 75.000 $11.000 $10.000 $9.000 $8.000 $17.360
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $26.000 $20.000 $25.000 $28.850 $52.260
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $9.250 $10.000 $11.000 $10.000 $11.970
TEMP SEDMT CONT FENCE (INSTALL)
LF 645.000 $6.000 $2.500 $3.750 $5.070 $5.620
TEMP SEDMT CONT FENCE (REMOVE)
LF 645.000 $1.000 $1.000 $1.000 $1.000 $4.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 300.000 $4.590 $5.000 $6.200 $5.500 $11.670
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $1.200 $1.000 $1.500 $1.250 $6.250
MTL W-BEAM GD FEN (TIM POST)
LF 645.000 $19.750 $20.000 $24.000 $19.000 $31.680
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $850.000 $965.000 $1,100.000 $906.000 $1,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,300.000 $850.000 $1,350.000 $950.000 $935.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $2.750 $2.000 $3.000 $2.500 $2.860
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $126.000 $150.000 $150.000 $150.000 $321.200
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,200.000 $2,150.000 $2,400.000 $2,050.000 $3,278.000
REMOVE RD IL ASM (U/P)
EA 2.000 $279.170 $500.000 $560.000 $526.320 $550.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000 $3,000.000 $3,973.000 $4,500.000 $4,182.110 $4,370.300
CONDT (PVC) (SCH 80) (2")
LF 585.000 $6.000 $8.000 $9.000 $8.420 $8.800
ELEC CONDR (NO.8) BARE
LF 585.000 $1.220 $1.160 $1.300 $1.220 $1.280
ELEC CONDR (NO.8) INSULATED
LF 1,170.000 $1.100 $1.560 $1.750 $1.640 $1.720
GROUND BOX TY D (162922)W/APRON
EA 3.000 $790.000 $1,040.000 $1,200.000 $1,094.740 $1,144.000
ELC SRV TY A 120/240 060(NS)SS(E)GC(O)
EA 2.000 $6,000.000 $5,678.000 $6,500.000 $5,976.840 $6,245.800
ALUMINUM SIGNS (TY A)
SF 40.000 $30.000 $18.500 $40.000 $31.580 $20.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $450.000 $470.000 $425.000 $684.210 $250.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 2.000 $1,900.000 $2,360.000 $3,500.000 $4,187.370 $2,000.000
REMOVE SM RD SN SUP&AM
EA 1.000 $80.000 $50.000 $120.000 $100.000 $55.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $30.000 $20.000 $30.000 $15.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 14.000 $30.000 $20.000 $30.000 $15.000 $30.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $65.000 $46.000 $100.000 $45.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 1.000 $16.000 $10.000 $15.000 $10.000 $100.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 578.000 $0.150 $0.350 $0.400 $0.350 $0.390
REFL PAV MRK TY II (Y) 4" (SLD)
LF 578.000 $0.150 $0.350 $0.400 $0.350 $0.390
PAVEMENT SEALER 4"
LF 1,385.000 $0.150 $0.250 $0.300 $0.250 $0.280
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,098.000 $0.350 $1.400 $1.500 $1.400 $1.540
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 1,443.000 $0.350 $1.400 $1.500 $1.400 $1.540
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 20.000 $12.400 $20.000 $23.000 $20.000 $22.000
PAV SURF PREP FOR MRK (4")
LF 1,385.000 $0.360 $0.150 $0.170 $0.150 $0.170
VEH SIG SEC (12")LED(GRN)
EA 2.000 $220.000 $173.000 $200.000 $182.110 $190.300
VEH SIG SEC (12")LED(YEL)
EA 6.000 $220.000 $173.000 $200.000 $182.110 $190.300
VEH SIG SEC (12")LED(RED)
EA 2.000 $220.000 $173.000 $200.000 $182.110 $190.300
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 4.000 $4,000.000 $4,576.000 $5,200.000 $4,816.840 $5,033.600
TEMPORARY CONSTRUCTION MATTING
SY 192.000 $50.000 $125.000 $90.000 $175.380 $120.000
FLOATING TURBIDITY BARRIER
LF 1,095.000 $60.000 $65.000 $35.000 $30.660 $93.500
SWING BRIDGE CONTROL HOUSE
LS 1.000 $100,000.000 $65,000.000 $78,000.000 $44,245.030 $90,000.000
ELECTRIC UTILITY FEEDER
EA 1.000 $8,050.000 $16,056.000 $18,000.000 $16,901.050 $17,661.600
GENERAL ELECTRICAL MATERIALS & CONTROLS
LS 1.000 $12,500.000 $246,171.000 $275,000.000 $259,127.370 $270,788.100
BRIDGE CONTROL SYSTEM AND MCC
LS 1.000 $102,200.000 $160,282.000 $190,000.000 $168,717.890 $176,310.200
BRIDGE CCTV
LS 1.000 $68,000.000 $47,087.000 $54,000.000 $49,565.260 $51,795.700
OPERATOR HOUSE ELECTRICAL SYSTEMS
LS 1.000 $67,000.000 $243,028.000 $280,000.000 $264,006.310 $267,330.800
SWING SPAN DRIVE MOTOR
EA 1.000 $23,000.000 $20,673.000 $23,000.000 $37,550.530 $40,000.000
THRUSTER BRAKE
EA 1.000 $12,500.000 $25,718.000 $16,000.000 $11,282.110 $15,000.000
WEDGE DRIVE MOTOR
EA 4.000 $7,000.000 $9,534.000 $13,950.000 $10,035.790 $15,000.000
SPAN SEATED LIMIT SWITCH
EA 2.000 $7,600.000 $4,927.000 $6,000.000 $5,186.320 $5,419.700
SPAN POSITION LIMIT SWITCHES
EA 4.000 $2,050.000 $12,524.000 $14,000.000 $13,183.160 $13,776.400
WEDGE ROTARY CAM LIMIT SWITCHES
EA 4.000 $4,500.000 $7,373.000 $8,300.000 $7,761.050 $8,110.300
WEDGE PROXIMITY LIMIT SWITCH
EA 8.000 $750.000 $778.000 $900.000 $818.950 $855.800
MOTOR DISCONNECT SWITCHES
EA 6.000 $1,450.000 $4,800.000 $6,000.000 $5,052.630 $5,280.000
TRAFFIC GATE ASSEMBLIES
EA 2.000 $29,500.000 $25,730.000 $32,000.000 $27,084.210 $28,303.000
RESISTANCE BARRIERS
EA 2.000 $98,000.000 $52,055.000 $66,000.000 $54,794.740 $57,260.500
NAVIGATION LIGHTING
LS 1.000 $29,500.000 $34,620.000 $40,000.000 $36,442.110 $38,082.000
FIXED MOVEABLE STR CABLE TRANS SYST
LS 1.000 $24,500.000 $16,056.000 $32,000.000 $16,901.050 $17,661.600
FUNCTIONAL TESTING
LS 1.000 $80,000.000 $44,200.000 $85,000.000 $46,526.320 $98,620.000
CENTER BEARING
LS 1.000 $111,000.000 $100,000.000 $125,000.000 $153,877.090 $194,000.000
SPAN DRIVE AND TRACK
LS 1.000 $402,000.000 $250,000.000 $420,000.000 $415,441.960 $355,000.000
BALANCE WHEELS
LS 1.000 $100,000.000 $60,000.000 $100,000.000 $110,253.970 $97,000.000
END WEDGES
LS 1.000 $533,000.000 $670,000.000 $740,000.000 $672,521.990 $600,000.000
CENTER PIER LIVE LOAD SUPPORTS
LS 1.000 $67,000.000 $50,000.000 $60,000.000 $85,991.420 $66,000.000
OPEN AND CLOSED BUMPERS
LS 1.000 $36,000.000 $20,000.000 $30,000.000 $33,036.840 $42,000.000
SPAN BALANCING
LS 1.000 $50,000.000 $50,000.000 $75,000.000 $57,026.770 $150,000.000
FENDER AND DOLPHIN INSTALLATION
LS 1.000 $1,350,000.000 $970,000.000 $1,290,000.000 $1,270,072.860 $2,196,700.000
SWING BRIDGE REHABILITATION
LS 1.000 $2,000,000.000 $2,000,000.000 $2,650,000.000 $1,749,862.170 $3,261,000.000
SUBMARINE CABLE REPLACEMENT
LS 1.000 $138,000.000 $274,000.000 $400,000.000 $465,543.820 $476,400.000
Totals: $8,566,747.293 $11,399,710.800 $11,561,340.700 $11,565,340.895 $14,169,276.311