PREPARING ROW
|
STA
|
5.740
|
$500.000
|
$50,000.000
|
$75,000.000
|
$107,760.000
|
$2,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
49.000
|
$30.000
|
$230.000
|
$50.000
|
$33.990
|
$242.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
17.000
|
$30.000
|
$230.000
|
$100.000
|
$65.510
|
$275.000
|
|
|
BLADING
|
HR
|
6.000
|
$75.000
|
$140.000
|
$120.000
|
$139.350
|
$440.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
421.000
|
$2.000
|
$5.500
|
$5.250
|
$4.750
|
$7.380
|
|
|
BLOCK SODDING
|
SY
|
742.000
|
$2.910
|
$6.000
|
$4.500
|
$4.000
|
$10.220
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
421.000
|
$0.250
|
$1.000
|
$2.150
|
$2.000
|
$3.660
|
|
|
VEGETATIVE WATERING
|
MG
|
1.700
|
$4.000
|
$750.000
|
$150.000
|
$565.580
|
$546.700
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(12")
|
SY
|
778.000
|
$25.000
|
$32.000
|
$48.000
|
$38.830
|
$60.500
|
|
|
SALV, HAUL & STKPL RCL APH PV (0-12")
|
SY
|
247.000
|
$15.000
|
$32.000
|
$35.000
|
$23.000
|
$44.000
|
|
|
PRIME COAT & BLOTTER (AE-P)
|
GAL
|
149.000
|
$4.500
|
$6.500
|
$22.000
|
$22.300
|
$22.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
6.000
|
$137.300
|
$240.000
|
$850.000
|
$1,580.000
|
$770.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
269.000
|
$3.900
|
$6.500
|
$22.000
|
$9.800
|
$22.000
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG70-22
|
TON
|
83.000
|
$130.000
|
$200.000
|
$450.000
|
$248.050
|
$440.000
|
|
|
CEM STABIL BKFL
|
CY
|
25.100
|
$98.460
|
$140.000
|
$300.000
|
$110.150
|
$500.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
1,560.000
|
$113.480
|
$90.000
|
$88.000
|
$103.620
|
$90.200
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
3,545.000
|
$96.000
|
$100.000
|
$88.000
|
$125.130
|
$168.300
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
40.000
|
$500.000
|
$250.000
|
$280.000
|
$263.160
|
$275.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
20.000
|
$500.000
|
$550.000
|
$600.000
|
$578.950
|
$605.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
56.300
|
$828.770
|
$1,200.000
|
$1,900.000
|
$1,089.040
|
$1,907.400
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
39.600
|
$1,000.000
|
$3,200.000
|
$2,600.000
|
$2,069.970
|
$5,255.800
|
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
192.700
|
$1,300.000
|
$1,600.000
|
$1,700.000
|
$1,514.990
|
$2,674.100
|
|
|
CL C CONC (FOOTING)(HPC)
|
CY
|
17.800
|
$1,300.000
|
$750.000
|
$1,400.000
|
$896.280
|
$4,056.800
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
6,740.000
|
$15.100
|
$25.000
|
$30.000
|
$22.760
|
$31.130
|
|
|
APPROACH SLAB (HPC)
|
CY
|
41.100
|
$479.420
|
$450.000
|
$1,100.000
|
$728.660
|
$994.400
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
707.110
|
$164.130
|
$200.000
|
$230.000
|
$160.930
|
$181.500
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
732.580
|
$154.310
|
$200.000
|
$230.000
|
$162.370
|
$172.700
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
72.000
|
$199.370
|
$150.000
|
$145.000
|
$180.290
|
$75.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
43.000
|
$500.000
|
$450.000
|
$650.000
|
$673.360
|
$535.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
527.000
|
$88.610
|
$100.000
|
$195.000
|
$157.570
|
$203.500
|
|
|
RAIL (TY PR1)
|
LF
|
174.000
|
$93.070
|
$83.000
|
$120.000
|
$87.000
|
$184.800
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$77,000.000
|
$600,000.000
|
$45,000.000
|
$300,000.000
|
$149,600.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$240,000.000
|
$850,000.000
|
$85,000.000
|
$650,000.000
|
$258,500.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$7,200.000
|
$3,500.000
|
$1,900.000
|
$1,648.860
|
$10,000.000
|
|
|
REMOV STR (BENT)
|
EA
|
1.000
|
$12,000.000
|
$70,000.000
|
$57,000.000
|
$325,000.000
|
$374,000.000
|
|
|
REMOV STR (DOLPHIN AND FENDER SYS)
|
EA
|
2.000
|
$40,000.000
|
$350,000.000
|
$85,000.000
|
$93,599.250
|
$201,300.000
|
|
|
REMOV STR (BUILDING)
|
EA
|
1.000
|
$25,000.000
|
$50,000.000
|
$10,000.000
|
$7,500.000
|
$16,500.000
|
|
|
REMOV STR (TIMBER PILING)
|
EA
|
36.000
|
$150.000
|
$1,800.000
|
$170.000
|
$1,328.550
|
$616.000
|
|
|
REMOVE STR (BARRIER GATE)
|
EA
|
4.000
|
$1,000.000
|
$1,250.000
|
$1,500.000
|
$1,196.210
|
$3,500.000
|
|
|
SALV MATRL (CREDIT ITEM)
|
LS
|
1.000
|
$25,000.000
|
$15,000.000
|
$2,800.000
|
$1.000
|
$1.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$776,489.000
|
$1,100,000.000
|
$1,150,000.000
|
$1,146,564.000
|
$1,225,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$5,000.000
|
$5,500.000
|
$9,500.000
|
$4,592.960
|
$2,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
45.000
|
$22.000
|
$30.000
|
$33.000
|
$42.770
|
$56.190
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
30.000
|
$37.000
|
$18.000
|
$56.000
|
$74.120
|
$56.430
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
75.000
|
$11.000
|
$10.000
|
$9.000
|
$8.000
|
$17.360
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$26.000
|
$20.000
|
$25.000
|
$28.850
|
$52.260
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$9.250
|
$10.000
|
$11.000
|
$10.000
|
$11.970
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
645.000
|
$6.000
|
$2.500
|
$3.750
|
$5.070
|
$5.620
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
645.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$4.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
300.000
|
$4.590
|
$5.000
|
$6.200
|
$5.500
|
$11.670
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$1.200
|
$1.000
|
$1.500
|
$1.250
|
$6.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
645.000
|
$19.750
|
$20.000
|
$24.000
|
$19.000
|
$31.680
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$850.000
|
$965.000
|
$1,100.000
|
$906.000
|
$1,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,300.000
|
$850.000
|
$1,350.000
|
$950.000
|
$935.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$2.750
|
$2.000
|
$3.000
|
$2.500
|
$2.860
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$126.000
|
$150.000
|
$150.000
|
$150.000
|
$321.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,200.000
|
$2,150.000
|
$2,400.000
|
$2,050.000
|
$3,278.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
2.000
|
$279.170
|
$500.000
|
$560.000
|
$526.320
|
$550.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
4.000
|
$3,000.000
|
$3,973.000
|
$4,500.000
|
$4,182.110
|
$4,370.300
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
585.000
|
$6.000
|
$8.000
|
$9.000
|
$8.420
|
$8.800
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
585.000
|
$1.220
|
$1.160
|
$1.300
|
$1.220
|
$1.280
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,170.000
|
$1.100
|
$1.560
|
$1.750
|
$1.640
|
$1.720
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$790.000
|
$1,040.000
|
$1,200.000
|
$1,094.740
|
$1,144.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)GC(O)
|
EA
|
2.000
|
$6,000.000
|
$5,678.000
|
$6,500.000
|
$5,976.840
|
$6,245.800
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
40.000
|
$30.000
|
$18.500
|
$40.000
|
$31.580
|
$20.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$450.000
|
$470.000
|
$425.000
|
$684.210
|
$250.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
2.000
|
$1,900.000
|
$2,360.000
|
$3,500.000
|
$4,187.370
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$80.000
|
$50.000
|
$120.000
|
$100.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$30.000
|
$20.000
|
$30.000
|
$15.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
14.000
|
$30.000
|
$20.000
|
$30.000
|
$15.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$65.000
|
$46.000
|
$100.000
|
$45.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
1.000
|
$16.000
|
$10.000
|
$15.000
|
$10.000
|
$100.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
578.000
|
$0.150
|
$0.350
|
$0.400
|
$0.350
|
$0.390
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
578.000
|
$0.150
|
$0.350
|
$0.400
|
$0.350
|
$0.390
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,385.000
|
$0.150
|
$0.250
|
$0.300
|
$0.250
|
$0.280
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,098.000
|
$0.350
|
$1.400
|
$1.500
|
$1.400
|
$1.540
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
1,443.000
|
$0.350
|
$1.400
|
$1.500
|
$1.400
|
$1.540
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
20.000
|
$12.400
|
$20.000
|
$23.000
|
$20.000
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,385.000
|
$0.360
|
$0.150
|
$0.170
|
$0.150
|
$0.170
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
2.000
|
$220.000
|
$173.000
|
$200.000
|
$182.110
|
$190.300
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
6.000
|
$220.000
|
$173.000
|
$200.000
|
$182.110
|
$190.300
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
2.000
|
$220.000
|
$173.000
|
$200.000
|
$182.110
|
$190.300
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$4,000.000
|
$4,576.000
|
$5,200.000
|
$4,816.840
|
$5,033.600
|
|
|
TEMPORARY CONSTRUCTION MATTING
|
SY
|
192.000
|
$50.000
|
$125.000
|
$90.000
|
$175.380
|
$120.000
|
|
|
FLOATING TURBIDITY BARRIER
|
LF
|
1,095.000
|
$60.000
|
$65.000
|
$35.000
|
$30.660
|
$93.500
|
|
|
SWING BRIDGE CONTROL HOUSE
|
LS
|
1.000
|
$100,000.000
|
$65,000.000
|
$78,000.000
|
$44,245.030
|
$90,000.000
|
|
|
ELECTRIC UTILITY FEEDER
|
EA
|
1.000
|
$8,050.000
|
$16,056.000
|
$18,000.000
|
$16,901.050
|
$17,661.600
|
|
|
GENERAL ELECTRICAL MATERIALS & CONTROLS
|
LS
|
1.000
|
$12,500.000
|
$246,171.000
|
$275,000.000
|
$259,127.370
|
$270,788.100
|
|
|
BRIDGE CONTROL SYSTEM AND MCC
|
LS
|
1.000
|
$102,200.000
|
$160,282.000
|
$190,000.000
|
$168,717.890
|
$176,310.200
|
|
|
BRIDGE CCTV
|
LS
|
1.000
|
$68,000.000
|
$47,087.000
|
$54,000.000
|
$49,565.260
|
$51,795.700
|
|
|
OPERATOR HOUSE ELECTRICAL SYSTEMS
|
LS
|
1.000
|
$67,000.000
|
$243,028.000
|
$280,000.000
|
$264,006.310
|
$267,330.800
|
|
|
SWING SPAN DRIVE MOTOR
|
EA
|
1.000
|
$23,000.000
|
$20,673.000
|
$23,000.000
|
$37,550.530
|
$40,000.000
|
|
|
THRUSTER BRAKE
|
EA
|
1.000
|
$12,500.000
|
$25,718.000
|
$16,000.000
|
$11,282.110
|
$15,000.000
|
|
|
WEDGE DRIVE MOTOR
|
EA
|
4.000
|
$7,000.000
|
$9,534.000
|
$13,950.000
|
$10,035.790
|
$15,000.000
|
|
|
SPAN SEATED LIMIT SWITCH
|
EA
|
2.000
|
$7,600.000
|
$4,927.000
|
$6,000.000
|
$5,186.320
|
$5,419.700
|
|
|
SPAN POSITION LIMIT SWITCHES
|
EA
|
4.000
|
$2,050.000
|
$12,524.000
|
$14,000.000
|
$13,183.160
|
$13,776.400
|
|
|
WEDGE ROTARY CAM LIMIT SWITCHES
|
EA
|
4.000
|
$4,500.000
|
$7,373.000
|
$8,300.000
|
$7,761.050
|
$8,110.300
|
|
|
WEDGE PROXIMITY LIMIT SWITCH
|
EA
|
8.000
|
$750.000
|
$778.000
|
$900.000
|
$818.950
|
$855.800
|
|
|
MOTOR DISCONNECT SWITCHES
|
EA
|
6.000
|
$1,450.000
|
$4,800.000
|
$6,000.000
|
$5,052.630
|
$5,280.000
|
|
|
TRAFFIC GATE ASSEMBLIES
|
EA
|
2.000
|
$29,500.000
|
$25,730.000
|
$32,000.000
|
$27,084.210
|
$28,303.000
|
|
|
RESISTANCE BARRIERS
|
EA
|
2.000
|
$98,000.000
|
$52,055.000
|
$66,000.000
|
$54,794.740
|
$57,260.500
|
|
|
NAVIGATION LIGHTING
|
LS
|
1.000
|
$29,500.000
|
$34,620.000
|
$40,000.000
|
$36,442.110
|
$38,082.000
|
|
|
FIXED MOVEABLE STR CABLE TRANS SYST
|
LS
|
1.000
|
$24,500.000
|
$16,056.000
|
$32,000.000
|
$16,901.050
|
$17,661.600
|
|
|
FUNCTIONAL TESTING
|
LS
|
1.000
|
$80,000.000
|
$44,200.000
|
$85,000.000
|
$46,526.320
|
$98,620.000
|
|
|
CENTER BEARING
|
LS
|
1.000
|
$111,000.000
|
$100,000.000
|
$125,000.000
|
$153,877.090
|
$194,000.000
|
|
|
SPAN DRIVE AND TRACK
|
LS
|
1.000
|
$402,000.000
|
$250,000.000
|
$420,000.000
|
$415,441.960
|
$355,000.000
|
|
|
BALANCE WHEELS
|
LS
|
1.000
|
$100,000.000
|
$60,000.000
|
$100,000.000
|
$110,253.970
|
$97,000.000
|
|
|
END WEDGES
|
LS
|
1.000
|
$533,000.000
|
$670,000.000
|
$740,000.000
|
$672,521.990
|
$600,000.000
|
|
|
CENTER PIER LIVE LOAD SUPPORTS
|
LS
|
1.000
|
$67,000.000
|
$50,000.000
|
$60,000.000
|
$85,991.420
|
$66,000.000
|
|
|
OPEN AND CLOSED BUMPERS
|
LS
|
1.000
|
$36,000.000
|
$20,000.000
|
$30,000.000
|
$33,036.840
|
$42,000.000
|
|
|
SPAN BALANCING
|
LS
|
1.000
|
$50,000.000
|
$50,000.000
|
$75,000.000
|
$57,026.770
|
$150,000.000
|
|
|
FENDER AND DOLPHIN INSTALLATION
|
LS
|
1.000
|
$1,350,000.000
|
$970,000.000
|
$1,290,000.000
|
$1,270,072.860
|
$2,196,700.000
|
|
|
SWING BRIDGE REHABILITATION
|
LS
|
1.000
|
$2,000,000.000
|
$2,000,000.000
|
$2,650,000.000
|
$1,749,862.170
|
$3,261,000.000
|
|
|
SUBMARINE CABLE REPLACEMENT
|
LS
|
1.000
|
$138,000.000
|
$274,000.000
|
$400,000.000
|
$465,543.820
|
$476,400.000
|
|
Totals: |
$8,566,747.293
|
$11,399,710.800
|
$11,561,340.700
|
$11,565,340.895
|
$14,169,276.311
|