ORANGE FM 105 (0883-02-087)

Items: 51

County: ORANGE
Length: N/A
Highway: FM 105
District: BEAUMONT
Control Number: 0883-02-087
DBE Goal: N/A
Project: STP 2020(146)HES
Guaranty: N/A
Time: 98 WORKING DAYS
Engineer's Estimate: $1,210,852.93
Date: 07/09/2020 (5 years ago)
Contract Number: N/A
Type: SFT - SAFETY IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,210,852.93
$1,226,989.51
Over/Under Est: 1.33% $16,136.58
$1,832,399.35
Over/Under Est: 51.33% $621,546.42
Amt Left: 49.34% $605,409.84

Bid Items & Bid Tabulations

51 Total 0 of 51
ORANGE  |  FM 105  |  BEAUMONT  |  0883-02-087  |  07/09/2020  |  $1,210,852.93  |  STP 2020(146)HES  |  SFT - SAFETY IMPRVS  |  98 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PTSS INVESTMENTS, LLC
REMOVING CONC (RIPRAP)
SY 4.000 $40.000 $115.500 $32.000
REMOVING CONC (DRIVEWAYS)
SY 270.000 $13.370 $46.000 $50.000
SUBGRADE WIDENING (ORD COMP)
STA 71.760 $325.000 $785.000 $1,700.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 14.000 $30.000 $43.000 $100.000
BACKFILL (TY A)
STA 76.070 $200.000 $225.000 $400.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 0.700 $1,870.000 $2,525.000 $2,500.000
VEGETATIVE WATERING
MG 4.800 $25.000 $97.500 $200.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 9,480.000 $4.000 $3.000 $8.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 203.000 $160.000 $222.000 $220.000
D-GR HMA(SQ) TY-A PG64-22
TON 2,900.000 $100.000 $93.000 $120.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 3,028.000 $110.000 $109.000 $140.000
TACK COAT
GAL 1,522.000 $4.250 $4.900 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 110.000 $65.000 $190.000 $120.000
RIPRAP (CONC)(4 IN)
CY 4.000 $400.000 $1,155.000 $900.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 9.000 $600.000 $1,040.000 $1,200.000
RC PIPE (CL III)(15 IN)
LF 78.000 $110.000 $94.500 $115.000
RC PIPE (CL III)(18 IN)
LF 130.000 $100.000 $95.500 $120.000
RC PIPE (CL III)(24 IN)
LF 67.000 $100.000 $111.000 $125.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $2,400.000 $3,825.000 $5,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $8,000.000 $9,450.000 $10,000.000
SET (TY I) (36 IN) (6: 1) (P)
EA 2.000 $6,066.660 $8,950.000 $6,000.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 55.000 $650.000 $745.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 40.000 $750.000 $855.000 $1,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,020.000 $875.000 $1,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 40.000 $1,300.000 $1,160.000 $2,100.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 6.000 $2,000.000 $2,210.000 $3,000.000
REMOV STR (SET)
EA 10.000 $501.000 $255.000 $750.000
REMOV STR (WINGWALL)
EA 1.000 $1,129.040 $1,510.000 $2,500.000
REMOV STR (PIPE)
LF 171.000 $16.170 $21.000 $35.000
MOBILIZATION
LS 1.000 $150,000.000 $97,500.000 $223,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,500.000 $1,500.000 $5,000.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 4.000 $150.000 $170.000 $100.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 375.000 $5.000 $6.050 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 375.000 $1.000 $1.050 $3.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,774.000 $20.000 $26.000 $60.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 8,188.000 $0.200 $0.330 $0.750
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 4,809.000 $0.200 $0.290 $1.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 9.000 $350.000 $245.000 $400.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 3.000 $410.000 $275.000 $400.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,122.000 $1.000 $1.550 $4.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 157.000 $1.000 $1.260 $1.150
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 15,064.000 $0.300 $0.510 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,020.000 $0.300 $0.510 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 9,085.000 $0.300 $0.510 $0.420
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 55.000 $6.000 $6.100 $8.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $200.000 $205.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $250.000 $248.000 $325.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $500.000 $605.000 $700.000
REFL PAV MRKR TY II-A-A
EA 561.000 $3.000 $4.100 $5.000
TMA (STATIONARY)
DAY 98.000 $250.000 $340.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $250.000 $101.000 $350.000
Totals: $1,210,852.930 $1,226,989.510 $1,832,399.350