Show Job Controls
Bid Cobra

ORANGE FM 105 (0710-02-071)

Items: 42

County: ORANGE
Length: N/A
Highway: FM 105
District: BEAUMONT
Control Number: 0710-02-071
DBE Goal: 0.0%
Project: C 710-2-71
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $4,805,779.70
Date: 12/06/2023 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$4,805,779.70
$5,542,611.78
Over/Under Est: 15.33% $736,832.08
Subcontractor Percentage Amount
TRP CONSTRUCTION GROUP, LLC 1.79% $99,212.75
AMERICAN REMEDIATION OPTIONS, INC. 1.46% $80,922.13
BARRICADES UNLIMITED 0.27% $14,965.05
PROFESSIONAL TRAFFIC CONTROL LLC 0.12% $6,651.13
Total: 3.64% $201,751.06

Bid Items & Bid Tabulations

42 Total 0 of 42
ORANGE  |  FM 105  |  BEAUMONT  |  0710-02-071  |  12/06/2023  |  $4,805,779.70  |  C 710-2-71  |  SURF/ROADWAY RESTOR  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY A OR B)
STA 167.000 $300.000 $495.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 18,552.000 $1.000 $0.220
BROADCAST SEED (TEMP) (WARM)
SY 9,276.000 $1.000 $0.220
BROADCAST SEED (TEMP) (COOL)
SY 9,276.000 $1.000 $0.220
VEGETATIVE WATERING
MG 156.000 $60.000 $27.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 3,043.000 $100.000 $180.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,822.000 $10.000 $4.500
PLANE ASPH CONC PAV (1")
SY 22,263.000 $3.000 $3.000
MOBILIZATION
LS 1.000 $608,985.000 $545,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $4,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $5.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.500 $1.700
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 4,657.000 $90.000 $80.000
RUMBLE STRIPS (SHOULDER)
LF 33,394.000 $0.300 $0.550
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 68.000 $255.000 $325.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $400.000 $350.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 13.000 $590.000 $875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 45.000 $550.000 $625.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $780.000 $740.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $820.000 $990.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $1,000.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 50.000 $89.000 $135.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,540.000 $1.000 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,210.000 $1.000 $2.500
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 143.000 $1.500 $1.900
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 172.000 $1.500 $1.150
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 40,742.000 $0.500 $1.200
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
LF 9,920.000 $0.500 $1.050
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 8,090.000 $0.500 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 35,702.000 $0.500 $0.650
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 294.000 $20.000 $17.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $255.000 $270.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $295.000 $360.000
REFL PAV MRKR TY I-C
EA 406.000 $4.000 $7.500
REFL PAV MRKR TY II-A-A
EA 1,355.000 $4.000 $7.500
TACK COAT
GAL 1,336.000 $5.000 $14.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 1,260.000 $160.000 $205.000
SP MIXES SP-C SAC-A PG76-22
TON 17,190.000 $160.000 $185.000
TACK COAT
GAL 15,213.000 $5.000 $9.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,800.000 $13,000.000
TMA (STATIONARY)
DAY 72.000 $360.000 $405.000
TMA (MOBILE OPERATION)
DAY 18.000 $360.000 $155.000
Totals: $4,805,779.700 $5,542,611.780