ORANGE BU 90-Y (0028-15-059)

Items: 49

County: ORANGE
Length: N/A
Highway: BU 90-Y
District: BEAUMONT
Control Number: 0028-15-059
DBE Goal: N/A
Project: C 28-15-59
Guaranty: N/A
Time: 69 WORKING DAYS
Engineer's Estimate: $2,516,929.62
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$2,516,929.62
$2,977,919.30
Over/Under Est: 18.32% $460,989.68

Bid Items & Bid Tabulations

49 Total 0 of 49
ORANGE  |  BU 90-Y  |  BEAUMONT  |  0028-15-059  |  02/02/2023  |  $2,516,929.62  |  C 28-15-59  |  SURF/ROADWAY RESTOR  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 243.000 $155.000 $650.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 10,365.000 $9.000 $8.500
PLANE ASPH CONC PAV(2" TO 4")
SY 34,549.000 $8.000 $4.000
PLANE CONC PAV(0" TO 1")
SY 5,635.000 $3.680 $12.000
FULL - DEPTH REPAIR CPCD (9")
SY 214.000 $214.000 $700.000
CLEANING AND SEALING EXISTING JOINTS
LF 35,642.000 $8.000 $4.000
ADJUSTING MANHOLES & INLETS
EA 22.000 $3,000.000 $700.000
MOBILIZATION
LS 1.000 $340,487.770 $294,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $6,500.000 $14,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 80.000 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 80.000 $1.250 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 390.000 $8.000 $6.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 390.000 $2.000 $2.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 80.000 $9.000 $12.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 33.000 $820.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $1,020.000 $1,350.000
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
EA 1.000 $1,620.000 $1,600.000
IN SM RD SN SUP&AM TYS80(1)SB(U-2EXT)
EA 1.000 $1,700.000 $1,650.000
REMOVE SM RD SN SUP&AM
EA 37.000 $117.000 $120.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 17,070.000 $0.560 $0.600
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 11,062.000 $0.410 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 1,671.000 $0.700 $6.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,442.000 $0.700 $3.500
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 4,141.000 $5.000 $11.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 826.000 $1.570 $4.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,241.000 $1.570 $4.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,442.000 $1.480 $1.000
REFL PAV MRK TY II (W) 8" (DOT)
LF 1,671.000 $0.660 $1.300
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 134.000 $0.580 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 3,010.000 $0.600 $1.250
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 11,214.000 $0.600 $1.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 4,141.000 $13.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 7.000 $255.000 $450.000
PREFAB PAV MRK TY C (W) (TPL ARROW)
EA 2.000 $300.000 $750.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $325.000 $460.000
PREFAB PAV MRK TY C (W) (ISLAND)
EA 1.000 $750.000 $1,350.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 4.000 $670.000 $1,100.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $27.000 $90.000
REFL PAV MRKR TY I-C
EA 166.000 $6.000 $11.500
REFL PAV MRKR TY II-A-A
EA 350.000 $5.000 $11.500
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 150.000 $400.000 $275.000
D-GR HMA TY-D SAC-A PG64-22
TON 361.000 $212.000 $400.000
SP MIXES SP-C PG64-22 (LEVEL-UP)
TON 1,337.000 $120.000 $250.000
SP MIXES SP-C SAC-B PG76-22
TON 3,973.000 $130.000 $235.000
TACK COAT
GAL 2,073.000 $136.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $22,000.000 $25,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $8.000 $17.000
TMA (STATIONARY)
DAY 68.000 $275.000 $550.000
TMA (MOBILE OPERATION)
DAY 3.000 $350.000 $5,500.000
Totals: $2,516,929.620 $2,977,919.300