Show Job Controls
Bid Cobra

OLDHAM US 385 (0226-02-038)

Items: 98

County: OLDHAM
Length: N/A
Highway: US 385
District: AMARILLO
Control Number: 0226-02-038
DBE Goal: N/A
Project: F 2022(282)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $9,360,610.94
Date: 12/01/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$9,360,610.94
$9,766,079.71
Over/Under Est: 4.33% $405,468.77
$10,257,239.90
Over/Under Est: 9.58% $896,628.96
Amt Left: 5.03% $491,160.19
$12,615,845.89
Over/Under Est: 34.78% $3,255,234.95
Amt Left: 29.18% $2,849,766.18
Delta: -22.99% -$2,358,605.99

Bid Items & Bid Tabulations

98 Total 0 of 98
OLDHAM  |  US 385  |  AMARILLO  |  0226-02-038  |  12/01/2021  |  $9,360,610.94  |  F 2022(282)  |  REHAB EXIST ROADWAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 3.000 $225.000 $282.760 $1,500.000 $1,308.600
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 13.000 $1,000.000 $1,000.000 $2,000.000 $1,975.230
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 1.000 $3,000.000 $3,000.000 $2,500.000 $4,631.870
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 1.000 $4,000.000 $5,600.000 $3,000.000 $6,361.480
REMOVING CONC (CURB)
LF 9,610.000 $5.800 $6.400 $3.000 $17.250
REMOVING CONC (FLUME)
SY 316.000 $18.000 $21.500 $30.000 $46.000
EXCAVATION (ROADWAY)
CY 1,411.000 $12.000 $87.500 $25.000 $32.020
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 31,395.000 $16.000 $19.310 $20.000 $31.310
BACKFILL (TY A OR B)
STA 481.320 $200.000 $273.000 $200.000 $314.300
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 13.180 $490.000 $550.000 $550.000 $598.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 13.180 $370.000 $450.000 $450.000 $477.250
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 183.000 $3.750 $4.250 $5.000 $4.600
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 12,372.000 $16.000 $14.800 $25.000 $26.410
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
SY 10,339.000 $20.000 $16.400 $30.000 $29.890
REWORK BS MTL (TY B)(18")(DENS CONT)
SY 10,535.000 $8.000 $16.000 $20.000 $37.460
PRIME COAT (MC-30)
GAL 4,873.000 $5.000 $4.800 $4.500 $5.460
EMULS ASPH (EROSN CONT)(MS-2)
GAL 6,379.000 $5.000 $4.400 $4.500 $3.880
ASPH (MULTI OPTION)
GAL 7,406.000 $4.000 $4.300 $5.000 $4.380
AGGR(TY-B GR-4 SAC-A)
CY 178.000 $180.000 $150.000 $125.000 $268.760
PLANE ASPH CONC PAV(0" TO 2")
SY 13,244.000 $3.000 $3.550 $2.750 $3.650
PLANE ASPH CONC PAV (2")
SY 10,680.000 $2.000 $4.150 $3.000 $3.270
RIPRAP (CONC)(4 IN)
CY 231.000 $650.000 $595.000 $600.000 $747.500
RIPRAP (CONC)(FLUME)
CY 42.000 $650.000 $750.000 $750.000 $747.500
RIPRAP (MOW STRIP)(4 IN)
CY 558.000 $650.000 $600.000 $575.000 $828.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 54.000 $879.060 $800.000 $725.000 $862.500
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 15.000 $1,000.000 $1,100.000 $650.000 $1,495.000
RC PIPE (CL III)(24 IN)
LF 261.000 $175.000 $235.000 $400.000 $172.500
RC PIPE (CL III)(30 IN)
LF 19.000 $250.000 $520.000 $450.000 $241.500
RC PIPE (CL III)(42 IN)
LF 63.000 $300.000 $370.000 $550.000 $460.000
RC PIPE (CL III)(48 IN)
LF 34.000 $395.000 $415.000 $600.000 $517.500
INLET (COMPL)(TY A)
EA 1.000 $5,000.000 $9,600.000 $5,000.000 $6,325.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 6.000 $10,660.000 $8,300.000 $9,000.000 $19,406.250
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $11,000.000 $12,250.000 $12,000.000 $13,455.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $12,000.000 $17,000.000 $20,000.000 $18,371.250
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 5.000 $8,000.000 $12,500.000 $10,000.000 $14,490.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $10,000.000 $22,000.000 $20,000.000 $50,197.500
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
EA 2.000 $10,000.000 $9,300.000 $8,000.000 $14,950.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $13,000.000 $25,000.000 $21,000.000 $36,800.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $1,175.000 $5,000.000 $3,000.000 $1,610.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 3.000 $2,226.150 $5,300.000 $3,200.000 $1,840.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $2,665.000 $6,500.000 $3,370.000 $3,450.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $4,196.720 $12,000.000 $8,000.000 $5,750.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 2.000 $4,800.000 $13,000.000 $9,000.000 $6,785.000
CLEAN EXIST CULVERTS
EA 20.000 $2,100.000 $2,500.000 $5,000.000 $4,025.000
REMOV STR (SET)
EA 2.000 $270.000 $1,200.000 $650.000 $575.000
REMOV STR (HEADWALL)
EA 32.000 $1,100.000 $1,200.000 $650.000 $1,150.000
REMOV STR (BOX CULVERT)
LF 2.000 $155.000 $640.000 $650.000 $115.000
MOBILIZATION
LS 1.000 $750,000.000 $970,000.000 $1,000,000.000 $1,261,584.590
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $25,500.000 $19,500.000 $84,000.000 $9,421.180
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 660.000 $7.600 $8.850 $4.000 $4.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 660.000 $2.250 $4.250 $1.000 $1.150
CONC CURB (TY I)
LF 1,269.000 $25.000 $25.500 $25.000 $51.750
CONC CURB & GUTTER (TY I)
LF 8,007.000 $35.000 $28.300 $30.000 $63.250
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 92,268.000 $0.250 $0.300 $0.250 $0.060
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 55,840.000 $0.300 $0.300 $0.350 $0.050
MTL W-BEAM GD FEN (STEEL POST)
LF 8,600.000 $33.600 $38.500 $35.000 $34.930
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,767.000 $2,900.000 $2,325.000 $2,673.750
REMOVE METAL BEAM GUARD FENCE
LF 6,250.000 $3.450 $3.450 $2.000 $2.300
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 20.000 $265.000 $345.000 $200.000 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 38.000 $3,000.000 $2,450.000 $3,000.000 $3,450.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $345.000 $345.000 $200.000 $230.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 21.000 $845.000 $1,000.000 $700.000 $802.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 54.000 $955.000 $1,155.000 $850.000 $959.100
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $1,150.000 $1,400.000 $1,030.000 $1,181.050
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 10.000 $1,280.000 $1,600.000 $1,200.000 $1,371.950
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $1,415.000 $1,700.000 $1,350.000 $1,500.750
REMOVE SM RD SN SUP&AM
EA 78.000 $107.000 $105.000 $100.000 $230.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 146.000 $34.650 $47.500 $35.000 $39.100
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 36.000 $140.000 $155.000 $120.000 $135.700
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 106.000 $140.000 $155.000 $120.000 $135.700
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI)
EA 54.000 $120.000 $155.000 $120.000 $135.700
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 85.000 $140.000 $155.000 $120.000 $135.700
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
EA 25.000 $120.000 $525.000 $400.000 $445.050
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
EA 25.000 $120.000 $525.000 $400.000 $445.050
WK ZN PAV MRK REMOV (REFL) TY I-C
LF 8,400.000 $1.000 $3.750 $3.550 $4.080
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 2,110.000 $0.850 $2.100 $2.000 $2.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,900.000 $0.480 $1.060 $1.000 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,765.000 $1.200 $1.250 $1.000 $1.890
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,850.000 $1.250 $1.300 $1.000 $1.900
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 2,073.000 $0.460 $1.060 $1.000 $1.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,495.000 $2.020 $1.350 $1.250 $1.440
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 25.000 $8.500 $32.000 $30.000 $34.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $225.000 $320.000 $300.000 $345.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 12.000 $790.000 $790.000 $750.000 $862.500
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $275.000 $425.000 $400.000 $460.000
REFL PAV MRKR TY I-C
EA 587.000 $3.450 $4.500 $4.250 $4.890
REFL PAV MRKR TY II-A-A
EA 1,835.000 $3.450 $4.000 $3.750 $4.310
D-GR HMA TY-B PG64-22
TON 3,216.000 $120.000 $106.500 $100.000 $141.230
SP MIXES SP-D SAC-A PG70-28
TON 33,416.000 $120.000 $115.000 $110.000 $145.130
TACK COAT
GAL 2,534.000 $5.000 $4.100 $5.000 $4.810
UNDERSEAL COURSE
GAL 71,074.000 $5.000 $3.250 $3.500 $3.820
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,000.000 $22,000.000 $15,500.000 $10,155.270
HPPM W/RET REQ TY I(W)4"(BRK)(100MIL)
LF 7,230.000 $0.400 $0.690 $0.650 $0.750
HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)
LF 96,638.000 $0.400 $0.580 $0.550 $0.630
HPPM W/RET REQ TY I(Y)4"(BRK)(100MIL)
LF 8,205.000 $0.400 $0.690 $0.650 $0.750
HPPM W/RET REQ TY I(Y)4"(SLD)(100MIL)
LF 78,090.000 $0.400 $0.580 $0.550 $0.630
TMA (STATIONARY)
DAY 150.000 $445.000 $575.000 $460.000 $431.470
TMA (MOBILE OPERATION)
HR 40.000 $75.000 $90.000 $95.000 $115.280
Totals: $9,360,610.940 $9,766,079.710 $10,257,239.900 $12,615,845.901