OLDHAM BI 40-- (0090-09-006)

Items: 78

County: OLDHAM
Length: N/A
Highway: BI 40--
District: AMARILLO
Control Number: 0090-09-006
DBE Goal: N/A
Project: BR 2019(915)
Guaranty: N/A
Time: 258 WORKING DAYS
Engineer's Estimate: $5,959,636.10
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: 2018 BMIP REPAIR BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$5,959,636.10
$7,204,392.00
Over/Under Est: 20.89% $1,244,755.90
Over/Under Est: 41.21% $2,455,739.20
Amt Left: 16.81% $1,210,983.30

Bid Items & Bid Tabulations

78 Total 0 of 78
OLDHAM  |  BI 40--  |  AMARILLO  |  0090-09-006  |  05/08/2019  |  $5,959,636.10  |  BR 2019(915)  |  2018 BMIP REPAIR BRIDGE  |  258 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
SCR CIVIL CONSTRUCTION, LLC
PREPARING ROW
STA 34.890 $200.000 $1,000.000 $1,000.000
REMOVING CONC (RIPRAP)
SY 2,125.000 $30.000 $10.000 $35.000
REMOVE CONC (RAIL)
LF 60.000 $25.000 $50.000 $130.000
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 2,730.000 $8.000 $10.000 $10.000
EXCAVATION (ROADWAY)
CY 548.000 $30.000 $15.000 $68.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 6,796.000 $20.000 $20.000 $45.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 5,296.000 $0.500 $1.000 $1.100
DRILL SEED (TEMP)(WARM OR COOL)
SY 5,296.000 $0.300 $1.000 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 5,296.000 $1.400 $2.500 $3.000
FL BS (CMP IN PLC)(TY A OR B GR4)(11")
SY 2,730.000 $20.000 $30.000 $40.000
PRIME COAT (MC-30)
GAL 700.000 $9.000 $5.000 $7.000
SUPERPAVE MIXTURES SP-D PG76-28
TON 1,716.000 $165.000 $150.000 $195.000
PLANE ASPH CONC PAV (2")
SY 7,158.000 $5.000 $5.000 $3.300
CEM STABIL BKFL
CY 398.000 $130.000 $400.000 $250.000
DRILL SHAFT (18 IN)
LF 86.000 $87.000 $150.000 $400.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 52.300 $1,100.000 $2,000.000 $5,600.000
CL C CONC (RAIL FOUNDATION)
CY 35.000 $500.000 $2,000.000 $810.000
REINF CONC SLAB (HPC)
SF 13,233.000 $30.000 $25.000 $58.000
APPROACH SLAB (HPC)
CY 226.300 $800.000 $2,000.000 $760.000
CONCRETE GIRDER (EXTEND)(HPC)
CY 119.000 $1,000.000 $2,000.000 $2,800.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 147.000 $180.000 $200.000 $300.000
RIPRAP (CONC)(4 IN)
CY 1,336.000 $500.000 $600.000 $455.000
RIPRAP (CONC)(6 IN)
CY 62.000 $700.000 $800.000 $455.000
RIPRAP (MOW STRIP)(4 IN)
CY 150.700 $500.000 $600.000 $455.000
STR STEEL (PEDESTAL)
LB 11,520.000 $5.000 $20.000 $10.000
RAIL (TY SSTR)
LF 250.000 $65.000 $100.000 $160.000
RAIL (TY SSTR)(HPC)
LF 1,159.700 $100.000 $80.000 $160.000
HEADER TYPE EXPANSION JOINT
LF 205.000 $85.000 $150.000 $160.000
RAISING EXIST STRUCT
LS 1.000 $135,000.000 $250,000.000 $310,000.000
REMOV STR (BRIDGE SLAB)
EA 2.000 $325,000.000 $500,000.000 $200,000.000
REMOV STR (APPROACH SLAB)
EA 4.000 $12,000.000 $30,500.000 $21,300.000
MOBILIZATION
LS 1.000 $400,000.000 $690,000.000 $838,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $20,000.000 $24,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $4.270 $5.000 $5.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $1.000 $1.000 $2.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 210.000 $4.000 $10.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 210.000 $1.250 $2.000 $2.250
CONSTRUCTING DETOURS
SY 7,500.000 $100.000 $80.000 $162.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 8,220.000 $13.000 $4.000 $17.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 6,300.000 $13.000 $3.000 $17.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 8,220.000 $13.000 $3.000 $17.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 172.000 $150.000 $300.000 $475.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,050.000 $25.000 $25.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,800.000 $2,000.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 2,550.000 $3.000 $4.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $225.000 $400.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,650.000 $3,000.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $270.000 $450.000 $280.000
CRASH CUSH ATTEN (INSTL)
EA 5.000 $15,000.000 $8,000.000 $9,675.000
CRASH CUSH ATTEN (REMOVE)
EA 7.000 $1,580.000 $1,200.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
EA 6.000 $18,500.000 $18,500.000 $25,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $900.000 $700.000 $615.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,200.000 $2,300.000 $5,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,200.000 $2,300.000 $5,400.000
REMOVE SM RD SN SUP&AM
EA 12.000 $105.000 $70.000 $84.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 122.000 $21.000 $35.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 493.000 $19.500 $15.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 283.000 $16.300 $20.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 38.000 $30.000 $40.000 $20.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,810.000 $0.800 $1.100 $1.250
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 26,800.000 $0.800 $1.100 $1.250
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
EA 2.000 $400.000 $500.000 $560.000
PAVEMENT SEALER 4"
LF 14,650.000 $0.400 $0.250 $0.300
PAVEMENT SEALER 6"
LF 3,080.000 $0.190 $0.350 $0.400
PAVEMENT SEALER (NUMBER)
EA 2.000 $75.000 $25.000 $28.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,170.000 $0.300 $0.750 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 21,420.000 $0.300 $0.750 $1.000
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 3,080.000 $7.150 $20.000 $22.500
REFL PAV MRKR TY II-A-A
EA 84.000 $3.000 $5.000 $5.600
REFL PAV MRKR TY II-C-R
EA 194.000 $3.200 $5.000 $5.600
ELIM EXT PAV MRK & MRKS (4")
LF 16,840.000 $1.100 $1.250 $1.400
ELIM EXT PAV MRK & MRKS (8")
LF 3,470.000 $1.500 $2.500 $2.800
PAV SURF PREP FOR MRK (4")
LF 17,730.000 $0.500 $0.500 $0.600
CARBON FIBER REINF POLYMER STRENGTHNING
SF 490.000 $65.000 $50.000 $50.000
CONCRETE BEAM REPAIR
EA 52.000 $5,200.000 $1,000.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $17,000.000 $12,500.000 $28,000.000
TMA (STATIONARY)
DAY 516.000 $200.000 $265.000 $230.000
TMA (MOBILE OPERATION)
HR 140.000 $45.000 $95.000 $106.000
Totals: $5,959,636.100 $7,204,392.000 $8,415,375.300