PREPARING ROW
|
STA
|
34.890
|
$200.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,125.000
|
$30.000
|
$10.000
|
$35.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
60.000
|
$25.000
|
$50.000
|
$130.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
2,730.000
|
$8.000
|
$10.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
548.000
|
$30.000
|
$15.000
|
$68.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
6,796.000
|
$20.000
|
$20.000
|
$45.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
5,296.000
|
$0.500
|
$1.000
|
$1.100
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
5,296.000
|
$0.300
|
$1.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
5,296.000
|
$1.400
|
$2.500
|
$3.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(11")
|
SY
|
2,730.000
|
$20.000
|
$30.000
|
$40.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
700.000
|
$9.000
|
$5.000
|
$7.000
|
|
|
SUPERPAVE MIXTURES SP-D PG76-28
|
TON
|
1,716.000
|
$165.000
|
$150.000
|
$195.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
7,158.000
|
$5.000
|
$5.000
|
$3.300
|
|
|
CEM STABIL BKFL
|
CY
|
398.000
|
$130.000
|
$400.000
|
$250.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
86.000
|
$87.000
|
$150.000
|
$400.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
52.300
|
$1,100.000
|
$2,000.000
|
$5,600.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
35.000
|
$500.000
|
$2,000.000
|
$810.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
13,233.000
|
$30.000
|
$25.000
|
$58.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
226.300
|
$800.000
|
$2,000.000
|
$760.000
|
|
|
CONCRETE GIRDER (EXTEND)(HPC)
|
CY
|
119.000
|
$1,000.000
|
$2,000.000
|
$2,800.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
147.000
|
$180.000
|
$200.000
|
$300.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,336.000
|
$500.000
|
$600.000
|
$455.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
62.000
|
$700.000
|
$800.000
|
$455.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
150.700
|
$500.000
|
$600.000
|
$455.000
|
|
|
STR STEEL (PEDESTAL)
|
LB
|
11,520.000
|
$5.000
|
$20.000
|
$10.000
|
|
|
RAIL (TY SSTR)
|
LF
|
250.000
|
$65.000
|
$100.000
|
$160.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,159.700
|
$100.000
|
$80.000
|
$160.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
205.000
|
$85.000
|
$150.000
|
$160.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$135,000.000
|
$250,000.000
|
$310,000.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
2.000
|
$325,000.000
|
$500,000.000
|
$200,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
4.000
|
$12,000.000
|
$30,500.000
|
$21,300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$690,000.000
|
$838,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$15,000.000
|
$20,000.000
|
$24,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$4.270
|
$5.000
|
$5.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$1.000
|
$2.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
210.000
|
$4.000
|
$10.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
210.000
|
$1.250
|
$2.000
|
$2.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,500.000
|
$100.000
|
$80.000
|
$162.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
8,220.000
|
$13.000
|
$4.000
|
$17.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
6,300.000
|
$13.000
|
$3.000
|
$17.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
8,220.000
|
$13.000
|
$3.000
|
$17.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
172.000
|
$150.000
|
$300.000
|
$475.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,050.000
|
$25.000
|
$25.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,800.000
|
$2,000.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,550.000
|
$3.000
|
$4.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$225.000
|
$400.000
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,650.000
|
$3,000.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$450.000
|
$280.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
5.000
|
$15,000.000
|
$8,000.000
|
$9,675.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
7.000
|
$1,580.000
|
$1,200.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
|
EA
|
6.000
|
$18,500.000
|
$18,500.000
|
$25,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$900.000
|
$700.000
|
$615.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,200.000
|
$2,300.000
|
$5,400.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,200.000
|
$2,300.000
|
$5,400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$105.000
|
$70.000
|
$84.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
122.000
|
$21.000
|
$35.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
493.000
|
$19.500
|
$15.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
283.000
|
$16.300
|
$20.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
38.000
|
$30.000
|
$40.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,810.000
|
$0.800
|
$1.100
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
26,800.000
|
$0.800
|
$1.100
|
$1.250
|
|
REFL PAV MRK TY I (W)(NUMBER)(090MIL)
|
EA
|
2.000
|
$400.000
|
$500.000
|
$560.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
14,650.000
|
$0.400
|
$0.250
|
$0.300
|
|
|
PAVEMENT SEALER 6"
|
LF
|
3,080.000
|
$0.190
|
$0.350
|
$0.400
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
2.000
|
$75.000
|
$25.000
|
$28.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,170.000
|
$0.300
|
$0.750
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
21,420.000
|
$0.300
|
$0.750
|
$1.000
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
3,080.000
|
$7.150
|
$20.000
|
$22.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
84.000
|
$3.000
|
$5.000
|
$5.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
194.000
|
$3.200
|
$5.000
|
$5.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
16,840.000
|
$1.100
|
$1.250
|
$1.400
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,470.000
|
$1.500
|
$2.500
|
$2.800
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
17,730.000
|
$0.500
|
$0.500
|
$0.600
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
490.000
|
$65.000
|
$50.000
|
$50.000
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
52.000
|
$5,200.000
|
$1,000.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$17,000.000
|
$12,500.000
|
$28,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
516.000
|
$200.000
|
$265.000
|
$230.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
140.000
|
$45.000
|
$95.000
|
$106.000
|
|
Totals: |
$5,959,636.100
|
$7,204,392.000
|